Summary
Overview
Work History
Education
Skills
Certification
OSHAcademy
CENTER FOR CAREER LEADERSHIP
Security clearance:
Timeline
Generic

David W. Stock

Victorville,California

Summary

Strategic facilities leader with broad expertise in long-range planning, building systems, maintenance programs, and technical project execution. Brings strong command of AutoCAD, project controls, and facilities data to support plant, lab, and office environments while improving space use, reliability, and capital project outcomes.

Overview

1
1
Certification
39
39
years of professional experience

Work History

FACILITIES ENGINEER, STAFF

LOCKHEED MARTIN COMPANY
PALMDALE, CALIFORNIA
07.2019 - Current
  • Guided major projects to completion in a leadership role, making decisions that significantly influenced the organization and engaging with senior personnel on key matters.
  • Planned, designed, and oversaw reconfiguration, maintenance, and alteration of equipment, machinery, buildings, structures, and other facilities. Gathered and reviewed data on facility or equipment specifications, company or government restrictions, required completion dates, and construction feasibility. Coordinated with architecture/engineering firms to develop design criteria and prepare layout and detail drawings. Prepared bid sheets and contracts for construction and facilities acquisition. Reviewed and estimated design costs, including equipment, installation, labor, materials, and preparation. Inspected or directed inspections of construction and installation progress to ensure conformance with established drawings, specifications, and schedules.
  • Actively contributed to development of new concepts, demonstrating expertise in industry and company practices.
  • COMPLEXITY - Develops innovative solutions to a range of complex problems that are consistent with organizational objectives. Works without direction. Work is reviewed upon completion and is consistent with departmental objectives.

SENIOR FACILITIES ENGINEER

LOCKHEED MARTIN COMPANY
PALMDALE, CALIFORNIA
09.2015 - 07.2019
  • Developed long-range strategies for factory, lab, and flight line space areas to align with program requirements. Develop alternative scenarios that will meet program requirements and present the recommended solutions to the Executive Management team. Prepare a Basis of Estimate (BOE) for each scenario presented. Prepare quarterly updates of all site-wide facility plans and present the update to the Facilities Review Board. Maintained Master Model Record Drawings in Project Wise database to ensure accuracy and accessibility. Prepare quarterly updates to the Area Control Report. Collected space utilization and configuration data to respond effectively to inquiries from internal and external stakeholders.
  • Directed facility maintenance initiatives at Lockheed Martin to maintain safety and functionality.
  • Established maintenance schedules for HVAC and electrical systems, promoting optimal performance and safety.
  • Evaluated work orders in CMMS, delegating tasks to technicians for effective workflow management.

FACILITIES COMPLIANCE ENGINEER

NIAGARA BOTTLING LLC
ONTARIO, CALIFORNIA
02.2015 - 09.2015
  • Monitor all United States plant facilities maintenance programs and ensure their compliance with defined key performance indicators; Facilities applications include, but are not limited to:
  • Assisted in auditing facilities maintenance compliance of plants and internal systems; conducted audits to ensure adherence to established checklists
  • Conduct audits of plants to identify potential safety concerns and possible equipment or facilities failures
  • Compile and track action items at each plant and assist with prompt completion
  • Review and report work order completion rates for facilities work at all plants
  • Compiled data on facilities maintenance spend to monitor compliance with defined metrics
  • Enhanced building and grounds conditions to support operational efficiency.
  • Oversaw continuous improvement and upgrade projects for plant facilities, evaluating potential cost savings and ROI of projects
  • Implement facilities upgrade projects at plants
  • Assist in the identification and implementation of facilities maintenance protocols.
  • Created comprehensive checklists for facilities equipment to ensure compliance with manufacturer guidelines and safety regulations.
  • Designed daily, weekly, and monthly checklists to track key performance indicators for facilities' equipment.
  • Assist with facilities maintenance management program vendor management
  • Conduct business and action item reviews with facilities maintenance vendors.
  • Build and maintain service contracts for plants in the areas including, but not limited to:
  • HVAC maintenance
  • Building/grounds maintenance
  • Fire protection system maintenance
  • Fire suppression systems
  • HVAC
  • Automatic Storage and Retrieval Systems
  • Laser Guided Forklifts

FACILITIES MANAGER II

GENERAL ATOMICS AERONAUTICAL
PALMDALE, CALIFORNIA
12.2002 - 08.2014
  • Manager of all Facilities, Maintenance, Vehicle Maintenance, Food Service and Janitorial Services for two integration and flight test facilities located in Southern California.
  • Managed daily operations of facilities, maintenance, construction, food services, vehicle maintenance, safety compliance, and janitorial departments; repaired and performed preventive maintenance on facilities and equipment to ensure operational readiness.
  • Supervised facilities support personnel and collaborated with senior management on day-to-day decisions regarding operations, maintenance of buildings, asset infrastructure, safety and space planning; participated in hiring, training, and promoting subordinate employees to build a skilled team.
  • Prepared technical statements of work and CAD criteria designs for construction projects and facility modifications; developed project budgets, cost estimates, and schedules, coordinating resources and tasks to complete projects within budget and on schedule.
  • Two flight test facilities - El Mirage and Gray Butte - are in the Mojave Desert just east of Los Angeles. Flight testing, flight training, aircraft final checkout and other operations are performed at these locations. The El Mirage facility has over 90,000 square feet of hangar and office space with a 5,000 ft. runway on 640 acres. The Gray Butte has three one 8,000 ft. runway with over 250,000 square feet of modern hangar and office facilities.

SENIOR FACILITIES ENGINEER

CESSNA AIRCRAFT COMPANY
WICHITA, KANSAS
06.1991 - 10.2002
  • Engineered facilities for world-class aircraft manufacturer, managing project safety, planning space, coordinating employee relocations, specifying and installing furniture and equipment, developing and maintaining capital budgets, designing architecture, overseeing construction, and solving problems. Provided technical support for preventive maintenance projects and conducted feasibility studies, advising management on planned capital projects and long-range facilities and space planning objectives.
  • Constructed a 189,000 square foot, aircraft service center, a 139,000 square foot, aircraft completion center, and an 84,000 square foot corporate office/ marketing complex at the Cessna Aircraft Company, Mid-Continent Facility, in Wichita, Kansas. As Project Manager, in addition to budget management, I directed the contractors in site preparation, utility installation, and tenant improvements. As Contract Administrator, I acted as liaison between the various tenant groups, architects, city departments, and management groups. These projects also included over 27 acres of concrete ramp/ taxiway and parking lot areas. Project was completed on schedule and below budget.
  • Designed and constructed 20,000 square foot high bay jet engine bleed air, wing fuel cell, environmental and control systems test facility, one of few in the United States, featuring an equipment room capable of producing 1000 cfm @ 350 psi heated compressed air. Facility tested, verified, and certified aircraft pneumatic, hydraulic, and environmental systems and equipment by simulating aircraft functions. Completed project below budget and ahead of schedule.

SENIOR ELECTRICAL DESIGNER

SAN DIEGO GAS & ELECTRIC COMPANY
SAN DIEGO, CALIFORNIA
03.1991 - 06.1991
  • Served as senior electrical designer for Electric Generation Engineering Department at San Diego Gas and Electric Company. Designed electrical systems and executed field modifications, enhancing functionality and reliability at two 90Mw power generation facilities in San Diego, California.
  • Designed electrical utility layouts for San Diego Gas & Electric distribution projects.
  • Prepared overhead and underground drawings using MicroStation and CAD standards.
  • Reviewed field notes and utility maps for San Diego Gas & Electric work orders.

FACILITIES ENGINEER

GENERAL DYNAMICS - CONVAIR DIVISION
SAN DIEGO, CALIFORNIA
01.1988 - 03.1991
  • Oversaw facilities engineering, construction project safety, space planning, employee relocations, equipment installations, architectural design, energy management, and maintenance engineering as Facilities Project Engineer for major defense contractor across six General Dynamics and one U.S. Air Force plant in San Diego and El Centro, California.
  • Constructed a 65,000 square foot manufacturing facility at the General Dynamics Imperial Valley Facility in El Centro, California. As project Manager, I directed the contractors in site preparation, designed and installed all the facility utilities, directed the building erection and tenant improvements. As Field Engineer, I was responsible for scheduling and managing all the construction tasks, budgets and acceptance startup of all facility and environmental equipment. Project was completed ahead of schedule and below budget.
  • Designed and constructed a 3,600 square foot, high bay, environmentally controlled, computer aided, laser measurement, cruise missile quality test cell. Project was completed on budget and ahead of schedule.
  • Served as Project Manager to develop specifications, criteria designs, and budgets for replacing damaged high voltage switchgear at the United States Air Force Plant 19 in San Diego, California. Also modified the main substation to provide switching capabilities.
  • Developed specifications, criteria designs, and budgets for relocation and startup of multiple live time x-ray facilities, ensuring operational readiness.
  • Designed and constructed equipment foundations and managed installation and startup across General Dynamics facilities in San Diego and Imperial Valley, California.

Education

Bachelor of Science - Education (Speech-Communications)

INDIANA UNIVERSITY
BLOOMINGTON, INDIANA

Skills

  • Facilities compliance
  • Facilities maintenance
  • Construction management
  • Space optimization
  • Cost analysis
  • Project coordination
  • CAD design

Certification

  • Commercial Pilot with Instrument Rating
  • State of California T1 Water Treatment Operator Certificate #35855

OSHAcademy

  • OSHA 10 OSHA Employee completion
  • OSHA 44 OSHA Specialist completion
  • Lock Out / Tag course completion
  • Blood Pathogens
  • NFPA 70E
  • NFPA 25
  • Fall Protection
  • Confined Space

CENTER FOR CAREER LEADERSHIP

  • SAN DIEGO, CALIFORNIA
  • Career Leadership

Security clearance:

Yes

Timeline

FACILITIES ENGINEER, STAFF

LOCKHEED MARTIN COMPANY
07.2019 - Current

SENIOR FACILITIES ENGINEER

LOCKHEED MARTIN COMPANY
09.2015 - 07.2019

FACILITIES COMPLIANCE ENGINEER

NIAGARA BOTTLING LLC
02.2015 - 09.2015

FACILITIES MANAGER II

GENERAL ATOMICS AERONAUTICAL
12.2002 - 08.2014

SENIOR FACILITIES ENGINEER

CESSNA AIRCRAFT COMPANY
06.1991 - 10.2002

SENIOR ELECTRICAL DESIGNER

SAN DIEGO GAS & ELECTRIC COMPANY
03.1991 - 06.1991

FACILITIES ENGINEER

GENERAL DYNAMICS - CONVAIR DIVISION
01.1988 - 03.1991

Bachelor of Science - Education (Speech-Communications)

INDIANA UNIVERSITY
David W. Stock