Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Davielys Ayala

Philadelphia,Pa

Summary

Results-oriented professional with Seventeen years of experience and a proven knowledge of Strong mechanical and structural aptitudes, Extensive knowledge of structural building codes and Excellent ability to maintain emergency plans and procedures. Aiming to leverage my abilities to successfully fill the Chief Engineer role at your company.

Overview

16
16
years of professional experience

Work History

Chief Engineer

Hampton Inn Suites
08.2006 - 08.2022
  • Acquired failure data to prepare maintenance plans for restoring equipment to operating condition
  • Identified tools and methodologies for preventative and predictive maintenance downtime
  • Researched innovative technologies to improve safety, quality and efficiency of work
  • Dismantled defective machines and equipment to install or repair new parts
  • Strengthened supply chain by selecting best-of-class products and fostering relationships with vendors
  • Originated and developed analysis to rapidly repair equipment by studying operating and repair manuals
  • Helped develop and implement preventive maintenance programs for new and existing equipment
  • Conducted lifecycle analysis on electrical and control system equipment to generate EOL and obsolescence plans
  • Prepared general diagrams, charts and spare parts requirements for maintenance planners
  • Integrated maintenance tasks required for new equipment and installations into existing maintenance plans
  • Installed equipment to improve energy and operational efficiency of residential and commercial buildings
  • Fabricated and repaired counters, benches, partitions, and other wooden structures, such as sheds and outbuildings
  • Dismantled machines, equipment and devices to access and remove defective parts, using hoists, cranes, hand tools and power tools
  • Aided in repair and maintenance of machines, mechanical equipment and building structures
  • Ordered parts, supplies, or equipment from catalogs or suppliers
  • Set up and operated machine tools to repair and fabricate machine parts, jigs, fixtures and tools
  • Recorded type and cost of maintenance and repair work
  • Managed maintenance personnel and subcontractors
  • Laid out repair work, using diagrams, drawings, blueprints, maintenance manuals and schematic diagrams
  • Maintained and repaired specialized equipment and machinery located in cafeterias, laundries, hospitals, stores, offices, and factories
  • Performed routine maintenance, such as inspecting drives, motors, and belts, checking fluid levels, replacing filters, and doing other preventive maintenance actions
  • Painted or repaired roofs, windows, doors, floors, woodwork, plaster, drywall, or other parts of building structures
  • Diagnosed mechanical problems and determined how to correct, checking blueprints, repair manuals and parts catalogs, as necessary
  • Performed general cleaning of buildings and properties
  • Assembled, installed and repaired wiring, electrical and electronic components, pipe systems, plumbing, machinery and equipment
  • Inspected, operated and test machinery and equipment diagnosed machine malfunctions
  • Cost to repair machinery, equipment and building structures
  • Cleaned or lubricated shafts, bearings, gears, or other parts of machinery
  • Adjusted functional parts of devices and control instruments, using hand tools, levels, plumb bobs, and straightedges
  • Repaired machines, equipment, or structures, using tools such as hammers, hoists, saws, drills, wrenches, or equipment such as precision measuring instruments or electrical or electronic testing devices
  • Aligned and balanced new equipment after installation
  • Repaired and maintained buildings, walls, arches and other structures
  • Tested and treated water supply
  • Operated cut torches and welding equipment to cut and join metal parts
  • Performed routine maintenance on boilers, such as replacing burners and hoses, installing replacement parts and reinforcing structural weaknesses to ensure optimal boiler efficiency
  • Attached and blow insulating materials to prevent energy losses from buildings, pipes and other structures and objects
  • Provided groundskeeping services, such as landscaping and snow removal
  • Assembled boilers at installation sites, using tools such as levels, plumb bobs, hammers, torches and other hand tools
  • Inspected used parts to determine changes in dimensional requirements, using rules, calipers, micrometers, and other measuring instruments
  • Ground and reseated valves, using valve-grinding machines

Education

DIPLOMA - HOSPITALITY AND TOURISM

Nuc university
Rio Grande, Puerto Rico
06.2001

Skills

  • Customer Satisfaction
  • Code Compliance
  • Predictive and Preventive Maintenance
  • Effective Multitasking
  • Facility Operations
  • Best Practices and Standards
  • Inspections
  • Troubleshooting
  • Safety management
  • Safety meetings
  • Project management

Languages

Spanish
Full Professional

Timeline

Chief Engineer

Hampton Inn Suites
08.2006 - 08.2022

DIPLOMA - HOSPITALITY AND TOURISM

Nuc university
Davielys Ayala