Get a position as a journeyman electrician where my experience and knowledge allow me to develop within the industry
Bend EMT-Rigid pipe
endings
electrical rooms
lights
Interpreted blueprints, schematics and diagrams of project requirements and initiated appropriate electrical installations.
Interpreted electrical codes and diagrams to complete electrical repair and installation tasks.
Performed detailed inspection and repairs on splicers, cables and [Type] equipment.
Performed troubleshooting to determine issues and appropriate action to complete tasks and provide quality installations.
Hydraulic bending
-Wires 14 auge to 500 MPM -Long volt 120V-240V -High volt 277V-480V
-Cut, thread, bend , assemble and Install conduits and other types of electrical conductor enclosures and fitting
-Pull wirw trough, conduits holes in walls and floors
-Maintain and Install distribution and control equipment such as switches, relays, circuit breaker panels asnd fuselaje enclosures
-Install replace, maintain and repair electrical systems and related electrical equipment
-Test circuit to ensure integrity and safety
-Instal
ling experience PLC and VFD
Hydraulic bending
-Wires 14 auge to 500 MPM. -Long volt 120V-240V. -High volt 277V-480V
-Cut, thread, bend , assemble and Install conduits and other types of electrical conductor enclosures and fitting
-Pull wirw trough, conduits holes in walls and floors
-Maintain and Install distribution and control equipment such as switches, relays, circuit breaker panels asnd fuselaje enclosures
-Install replace, maintain and repair electrical systems and related electrical equipment
-Test circuit to ensure integrity and safety
-Installing experience PLC and VFD
October 2020 to December 2020
Voltage Electric (RIVIAN) car factory Illinois City, IL
Journeyman Electrician
Pull wires MC #12 #10 #8 -Electrical mechanic, bend pipes -Installation of Electrical circuits
-Dass installation
Project Industrial Dakota del Sur. Substations voltage 230KV. Interconnection for
90 MW 230/15KV
-Pull wires #12 #10 #8 #6
-Hydraulic Bending rigid and EMT 1/2 ́ ́-4 ́ ́
-installation of panels, transformrs, PLC, VFD, disconnective, lamp, recepticos, electrical rooms etc
-install ccvt, Ct, Pt, battery racks.
-Fab and install cabinets
-Install breakers
-High and low in transformer installation and terminate
-level and install bus and helicopter switches
-terminate breakers
-ground grid and cadweld
-run conduit
-Cement and rebar
Interpreted blueprints, schematics and diagrams of project requirements and initiated appropriate electrical installations.
Interpreted electrical codes and diagrams to complete electrical repair and installation tasks.
Performed detailed inspection and repairs on splicers, cables and [Type] equipment.
Performed troubleshooting to determine issues and appropriate action to complete tasks and provide quality installations.
Hydraulic bending
-Wires 14 auge to 500 MPM -Long volt 120V-240V -High volt 277V-480V
-Cut, thread, bend , assemble and Install conduits and other types of electrical conductor enclosures and fitting
-Pull wirw trough, conduits holes in walls and floors
-Maintain and Install distribution and control equipment such as switches, relays, circuit breaker panels asnd fuselaje enclosures
-Install replace, maintain and repair electrical systems and related electrical equipment
-Test circuit to ensure integrity and safety
-Instal
ling experience PLC and VFD
Industrial Project (Middletown Data Center Virginia)
-Hydraulic Bending. -Wires 14 auge to 500 MPM, KCMIL, -Long volt 120V-240V -High volt 277V-480V
-Voltages 120V-240V -Pull wires MC #12 #10 #8 -Electrical mechanic, bend
pipes
-Installation and termination of panels, transformers, motors, PLC, VFD, disconnective, etc .
May 2019 to December 2019
Sentry Electrical (Elite Force) substation Yankton, SD
Journeyman Electrician
Project Industrial Dakota del Sur. Substations voltage 230KV. Interconnection for 90 MW 230/15KV
-Pull wires #12 #10 #8 #6
-Hydraulic Bending rigid and EMT 1/2 ́ ́-4 ́ ́
-installation of panels, transformrs, PLC, VFD, disconnective, lamp, recepticos, electrical rooms etc
MPM, KCMIL, -Long volt 120V-240V -High volt 277V-480V
-Voltages 120V-240V -Pull wires MC #12 #10 #8 -Electrical mechanic, bend
pipes
-Installation and termination of panels, transformers, motors, PLC, VFD, disconnective, etc .
May 2019 to December 2019
Sentry Electrical (Elite Force) substation Yankton, SD
Journeyman Electrician
Project Industrial Dakota del Sur. Substations voltage 230KV. Interconnection for 90 MW 230/15KV
-Pull wires #12 #10 #8 #6
-Hydraulic Bending rigid and EMT 1/2 ́ ́-4 ́ ́
-installation of panels, transformrs, PLC, VFD, disconnective, lamp, recepticos, electrical rooms etc
-Pull wires MC #12 #10 #8
-Conduit bending , running and threading voltage 120V-240V 277V-480V. -Rigid conduit pipe
-Electrical Electric circuit, bend pipe -Installation electric's circuit
-Electrical rooms,reseptics, lamp and disconnected
Interpreted blueprints, schematics and diagrams of project requirements and initiated appropriate electrical installations.
Interpreted electrical codes and diagrams to complete electrical repair and installation tasks.
Performed detailed inspection and repairs on splicers, cables and [Type] equipment.
Performed troubleshooting to determine issues and appropriate action to complete tasks and provide quality installations.
-Hydraulic Bending. -Wires 14 auge to 500 MPM, KCMIL, -Long volt 120V-240V -High volt 277V-480V
-Voltages 120V-240V -Pull wires MC #12 #10 #8 -Electrical mechanic, bend pipes
-Installation and termination of panels, transformers, motors, PLC, VFD, disconnective,
March 2017 to December 2017
Mcdermott International Inc (Duke Power) Asheville, NC
Journeyman Electrician
-Rum EMT and rigid conduit pipe
-Install and repair wiring, electrical, fixture and power equipment -Installation of equipment following, electrical code, schematics and blue prints
-Wire 14 gauge to 500 MPM -Voltages 277V-480V -Hydraulic Bending
Power Design Inc. Miami, FL Electrician
-Voltages 120V-240V
-Pull wires MC #12 #10 #8 -Electrical mechanic, bend pipes -Installation of Electrical circuits -Dass installation
-Installation Fire Alarms
Circuit Continuity Assessment
Transformer Connection Electrical Wiring and Fixtures Report Preparation-installing equipment
-Motor operations
-Blueprint and schematic interpretation, disconnect switch and ground grid testing
conduit (EMT-RIGID-PVC) pipes from 1/2-4'' (hydraulic machine)of panels, transformers, motors, PLC, VFD, disconnects Running cable (#14,#12,#10,#8,#6) up to 500 MPM KCMIl volt-
-4 to 26' cable tray installation, aluminum, fiberglass , stainless steel -Run ground grid, grounding -Termination of motors, PLC, DPI, lighting
-Scissor lifts
-OSHA-10