Summary
Overview
Work History
Skills
Languages
Timeline
Generic

DENIS FERNANDO

Vanur,Villuppuram

Summary

A highly accomplished steel industry professional with nearly 40 years of cross-functional experience across manufacturing process improvement, technology acquisition, operations management, quality assurance, and strategic consulting. Proven expertise in identifying and closing technology gaps, driving cost reductions, and implementing cutting-edge steel making processes that enhance product quality and operational efficiency. Skilled in managing end-to-end technical training programs—from skills gap analysis to curriculum development and delivery—to build high-performing, technically competent teams

Overview

39
39
years of professional experience

Work History

Production Manager

Seashore Steel WLL
10.2013 - 04.2025
  • Manage and supervise all aspects of steel production using induction furnaces(30 MT), ensuring consistent output quality and adherence to production targets.
  • Coordinate melting operations, charge mix planning, furnace loading/unloading, tapping, and slag removal with strict compliance to metallurgical specifications.
  • Lead a team of furnace operators, maintenance personnel, and support staff, ensuring safe and efficient work practices in a high-temperature environment.
  • Optimize furnace performance by monitoring power consumption, refining cycles, and heat durations to reduce energy costs and improve yield
  • Implement process control techniques and quality assurance procedures to maintain steel chemistry and minimize rework or rejection rates
  • Oversee raw material procurement and inventory (sponge iron, scrap, ferroalloys), coordinating with the procurement and stores teams to avoid production delays.
  • Enforce workplace safety standards in accordance with ISO and OSHA regulations, conducting regular training and safety drills.
  • Collaborated with other departments to ensure seamless production flow and delivery timelines.
  • Initiated and led continuous improvement projects resulting in cost reduction and improved furnace turnaround times.
  • Maintain accurate production reports, shift logs, and dashboards for senior management review

Key achievements

  • Successfully ramped up production capacity from 320MT/day to 360 MT/day without compromising quality.
  • Delivered a record-breaking monthly output of 11,000 metric tons, through strategic scheduling, raw material planning, and process optimization.
  • Improved furnace efficiency by boosting heat cycles per patching from 15 to 65, achieved through targeted research and refinement of ramming practices.

.

Production Manager

Goveen Steel Pvt. Ltd.
05.2012 - 06.2013
  • Sourced materials to keep up with production goals and meet customer demands.
  • Resolved issues quickly to maintain productivity goals.
  • Reviewed work for quality and compliance with company standards and design specifications.
  • Managed internal operational standards and productivity targets.
  • Estimated labor requirements to support anticipated workload.

Production in Charge

Sumangala Steel (P) Ltd.
08.2004 - 05.2012

Production Manager (10 Tones Induction Furnace)

Bannari Amman Groups
10.1993 - 07.2004

Senior Melter (8 Tones Induction Furnace)

Singal Surap Ltd
07.1990 - 09.1993

Melting In Charge (8 Tones Induction Furnace)

Maruthi Steel Pvt Ltd
08.1988 - 05.1990

Melter (5 Tones Induction Furnace)

Kay Pee Steel (P) Ltd
05.1986 - 06.1988

Skills

  • Metallurgical Knowledge
  • Furnace Operation & Maintenance
  • Team Leadership
  • Production Planning
  • Lean Manufacturing
  • Quality Control
  • Inventory Management
  • Root Cause Analysis (RCA)
  • Health & Safety Compliance
  • Energy Efficiency Management
  • Dedication to product quality

Languages

Tamil
Advanced (C1)
Hindi
Upper intermediate (B2)
Malayalam
Upper intermediate (B2)
English
Upper intermediate (B2)

Timeline

Production Manager

Seashore Steel WLL
10.2013 - 04.2025

Production Manager

Goveen Steel Pvt. Ltd.
05.2012 - 06.2013

Production in Charge

Sumangala Steel (P) Ltd.
08.2004 - 05.2012

Production Manager (10 Tones Induction Furnace)

Bannari Amman Groups
10.1993 - 07.2004

Senior Melter (8 Tones Induction Furnace)

Singal Surap Ltd
07.1990 - 09.1993

Melting In Charge (8 Tones Induction Furnace)

Maruthi Steel Pvt Ltd
08.1988 - 05.1990

Melter (5 Tones Induction Furnace)

Kay Pee Steel (P) Ltd
05.1986 - 06.1988