Summary
Overview
Work History
Education
Skills
Timeline
Generic

Derrick Wood

Window Rock,AZ

Summary

Proven Construction Framer with expertise in structural framing and a knack for steel framing, honed at JKC Construction. Excelled in reducing material waste and enhancing team skills, demonstrating a keen eye for detail and robust teamwork abilities. Achieved project goals within budget 100% of the time, showcasing exceptional time management and multitasking skills.

Overview

9
9
years of professional experience

Work History

Construction Framer

JKC Construction
05.2008 - 04.2011
  • Ensured proper installation of structural elements such as beams, headers, and floor systems following blueprints and specifications.
  • Contributed to successful project outcomes by consistently meeting deadlines and staying within budget constraints.
  • Supported professional growth among team members through ongoing mentorship in carpentry techniques and best practices for construction framing activities.
  • Reduced material waste by accurately measuring, cutting, and assembling wood framing components.
  • Followed safety protocols when using nail guns, saws, and grinders.
  • Cut, measured and shaped wood after inspecting blueprints, build areas and work orders.
  • Installed frames and secured to walls and support structures.

Construction Framer

Dura Frame Constuction
01.2002 - 10.2004
  • Cut, measured and shaped wood after inspecting blueprints, build areas and work orders.
  • Installed frames and secured to walls and support structures.
  • Accurately and safely installed wall, roof and floor structures according to blueprints, customer requests, and available inventories.
  • Cut and joined wood, using precise measurements and proper techniques to create frames of different sizes
  • Examined wood, work areas, and supplies for defects and damage before completing projects.
  • Matched frame designs to existing décor or specific interior design styles.
  • Inspected projects, identified issues that occurred and implemented corrective measures.
  • Inserted sealing strips, wiring and insulating material, as called for in blueprints.
  • Fabricated steel frames, columns, beams, and girders according to blueprints or instructions from site managers.

Construction Framer

Straight Line Construction & Roofing
09.2002 - 09.2004
  • Cut, measured and shaped wood after inspecting blueprints, build areas and work orders.
  • Followed safety protocols when using nail guns, saws, and grinders.
  • Cut and joined wood, using precise measurements and proper techniques to create frames of different sizes
  • Installed frames and secured to walls and support structures.
  • Disassembled frames for repair, refurbishment, or replacement.
  • Inspected frames, identified issues such as warping, and implemented corrections.
  • Aligned structural steel members to rivet, bolt and weld permanently into place.
  • Hoisted metal components into place, safely operating cranes during process.
  • Fabricated steel frames, columns, beams, and girders according to blueprints or instructions from site managers.
  • Dismantled structures and prepared equipment for travel or site movement.
  • Accurately and safely installed wall, roof and floor structures according to blueprints, customer requests, and available inventories.

Education

No Degree - All Required

Window Rock High School
Fort Defiance, AZ
05.2002

Skills

  • Staircase Construction
  • Steel Framing
  • Structural Framing
  • Power Tool Operation
  • Hand-tool proficiency
  • Truss Assembly
  • Beam Placement
  • Wall construction
  • Material Estimation
  • Drywall Installation
  • Joist Installation
  • Door installation
  • Safety Regulations
  • Window Installation
  • Insulation application
  • Roof Assembly
  • Debris Removal
  • Power Tools Operation
  • Safety Procedures
  • Hardware Installation
  • Repairing
  • Knowledge of raw materials
  • Mechanical understanding
  • Public safety and security
  • Teamwork and Collaboration
  • Attention to Detail
  • Multitasking
  • Multitasking Abilities
  • Self Motivation
  • Time management abilities
  • Truck unloading

Timeline

Construction Framer

JKC Construction
05.2008 - 04.2011

Construction Framer

Straight Line Construction & Roofing
09.2002 - 09.2004

Construction Framer

Dura Frame Constuction
01.2002 - 10.2004

No Degree - All Required

Window Rock High School
Derrick Wood