Professional Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline

Diego Escarcega

Cache Valley Electric Co.
Amarillo,TX
3
Languages
1
Certification
6
years of professional experience

Dynamic Valve Technician with a proven track record at Cathcart Rail, enhancing equipment lifespan through tailored preventative maintenance and effective problem-solving. Skilled in mechanical troubleshooting and teamwork, I consistently reduced downtime and improved safety standards, ensuring smooth operations and compliance with industry regulations. Professional technician with extensive experience in valve systems and equipment. Known for delivering consistent maintenance solutions and contributing to operational efficiency. Strong focus on teamwork and achieving measurable results, adapting seamlessly to dynamic work environments. Well-versed in valve diagnostics, repair techniques, and safety protocols. At CVE I got to learn the material fairly quickly in a month I was already pulling orders for my other coworkers and trusted to keep count of wire that foreman’s needed count on, for the general foreman’s. Certain task I was doing by myself that needed to be done that same day and was able to complete the task with no issues.

Work History

Electrician / Operator

3 Months
Cache Valley Electric Co. | 05.2026 - Current

-Gather material for the electricians inside the building and take the material to them when requested.

-On a timely basis when material is requested so the job doesn’t stop and coworkers are kept busy.

-Drive forklift or truck with 20 and up to 40foot flat beds loaded of the material requested

Valve Technician

3 Years 8 Months
Cathcart Rail | 10.2022 - 06.2026
  • Increased equipment lifespan through implementation of comprehensive preventative maintenance programs tailored to each specific valve type.
  • Provided clear documentation of work history, allowing for efficient tracking of maintenance schedules and accurate records management.
  • Recovered lost production time through rapid response to emergency situations, swiftly diagnosing issues and implementing effective solutions.
  • Enhanced workplace safety by strictly adhering to industry guidelines and company protocols during valve installation and repairs.
  • Reduced downtime by performing timely maintenance on valves, ensuring smooth operations and minimizing production delays.

Construction Worker

2 Years 5 Months
R&R Framing | 05.2020 - 10.2022
  • Utilized hammers, saws, squares.
  • Contributed to a positive work culture by fostering teamwork among staff through open communication channels, which led to higher overall productivity levels during projects.
  • Completed construction projects on time by adhering to strict deadlines and prioritizing tasks appropriately.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Operated power equipment to move materials and promote job efficiency.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Reduced material waste by accurately calculating requirements and optimizing usage throughout the project lifecycle.
  • Consistently met or exceeded building codes and regulations, resulting in successful inspections upon project completion.

Education

High School Diploma

Palo Duro High | Amarillo, TX | 05.2019

Skills

3 years of lead man
Flow control
Pressure testing
Hand tool proficiency
Gasket replacement
Mechanical troubleshooting
Equipment calibration
Threaded connections
Torque wrench operation
Seal replacement
Leak detection
Valve assembly
Valve disassembly
Teamwork and collaboration
Time management
Problem-solving abilities
Multitasking
Excellent communication
Decision-making
Self motivation

Certification

Bubble leak 2021-05, Vt 2025-06, Crain certified 2024-11, Forklift certified, Class A CDL

Languages

English
Spanish
Full Professional

Timeline

Electrician / Operator

Cache Valley Electric Co.
05.2026 - CurrentRead More

Valve Technician

Cathcart Rail
10.2022 - 06.2026Read More

Construction Worker

R&R Framing
05.2020 - 10.2022Read More

Palo Duro High

High School Diploma
Read More
Diego Escarcega