Pipefitter Fabricator

Bay Ltd.
Texas City, TX
08.2022 - Current
  • Valero Texas city
  • Prioritized and planned work activities to meet deadlines; used time efficiently
  • Identified and resolved fabrication problems in a timely manner to ensure on-time delivery of product to customer
  • Fabricated piping from isometric drawings
  • Cut, grind, fit various sizes of piping
  • Pulled field measurements, verifying dimensions on drawings
  • Worked with various of rare metals such as monel, inconel, carbon steel, stainless steel, chrome.
  • Fabricate pipe supports
  • Hydro-test piping spools, using hand pumps and compressors
  • Installation of piping
  • Read PI&D drawings
  • Worked with exchangers, heaters.
  • Rigging

Pipefitter

Elite Piping And Civil
Pasadena, TX
08.2021 - 06.2022
  • Read blueprints
  • Installed pipe onto pipe rack using rigging
  • Bull rigged pipes into pipe rack
  • Install supports for pipes to keep them in place during installation process.
  • Fabricated spool pieces for pipe racks
  • Measured and marked pipes for cutting
  • Filled pipes with water or air, observing pressure gauges and pipes to troubleshoot and locate leaks.

Pipefitter

Zachry
Channelview , TX
06.2020 - 08.2021
  • Threaded pipes using piping machines.
  • Fabricated, assembled, installed piping and piping supports
  • Aligned piping for pumps
  • Field measurements
  • Fabricated and installed screw pipe, socket weld pipe and butt weld pipe
  • Read and interpreted blueprints and schematics to determine locations, quantities and sizes of materials required.
  • Worked with carbon and stainless steel metal piping

Pipefitter Helper

S&B Engineers And Constructors Ltd.
Sweeny, TX
11.2019 - 06.2020
  • Fabricated, assembled and installed screw pipe, socket weld, butt-weld, stainless steel, and carbon steel pipes on pipe racks.
  • Threaded, cut pipes using piping machines such as beveling machines and threading machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Inspected and tested pipe systems through air and water testing to verify safety and reliability.
  • Used u-bolts, guides, and stops to attach pipes to pipe racks and structures.
  • Cut and drilled holes on I-beams and structures.
  • Read and interpreted blueprints and schematics to determine locations, quantities and sizes of materials required.
  • Bull rigged pipe with chain falls, come-a-longs.

Pipefitter Helper

Zachry Group
Freeport, TX
03.2018 - 09.2019
  • Read iso prints correctly and pulled take offs for fittings and pipe lengths.
  • Worked with metals from carbon steel and stainless steel.
  • Installed pipe in racks, wall mounts, above and below ground.
  • Prepared pipe, fittings and flanges with assorted grinders.
  • Used proper methods for valve installation and removal.
  • Beveled various size pipes, installed different size flange's, and fitted-up Buttweld, socket-weld, and threaded pipes.
  • Field verified measurements on drawings and gathered new measurements depending on job.
  • Cut, fit and aligned piping for boil on gas compressors.
  • Commissioning/Start-up
  • Assisted in repairing leaks and making adjustments to pipe systems.
  • Flushed, tested and commissioned the systems.

Pipefitter Helper

Bilfinger Westcon
Pasadena, TX
06.2016 - 02.2018
  • Pit 11 Kinder Morgan project
  • Assisted Pipefitters & Welders in measuring, cutting, grinding, fitting and threading pipes for installation.
  • Rigged various loads of pipe for crane using come-a-longs, chain-falls.
  • Performed bolt up of valves, flanges, etc.
  • Read isometric & P&ID blueprints.
  • Used beveling machines to cut piping.
  • Cut and fused HDPE underground piping.
  • Provided support in lifting heavy materials onto work platforms or scaffolding.
  • Assembled supports for pipes prior to installation according to manufacturer's instructions.
  • Filled piping systems with water and air to test for leaks.

Education

High School Diploma -

San Benito High School
San Benito, TX
06.2016

Skills

  • Reading and understanding blueprints
  • Advanced math
  • Knowledgeable at operating industrial tools
  • Safety and compliance
  • Communication
  • Maintenance and Repair

Certification

  • NCCER Plus Pipefitter Certified

Timeline

Pipefitter Fabricator

Bay Ltd.
08.2022 - Current

Pipefitter

Elite Piping And Civil
08.2021 - 06.2022

Pipefitter

Zachry
06.2020 - 08.2021

Pipefitter Helper

S&B Engineers And Constructors Ltd.
11.2019 - 06.2020

Pipefitter Helper

Zachry Group
03.2018 - 09.2019

Pipefitter Helper

Bilfinger Westcon
06.2016 - 02.2018