Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic
DIPENDRA PRATAP SINGH

DIPENDRA PRATAP SINGH

Kasulu Kigoma ,TZ

Summary

Results-driven Production Manager known for high productivity and efficient task completion. Specialize in lean manufacturing techniques, supply chain optimization, and process improvement strategies. Excel in leadership, communication, and problem-solving, ensuring seamless production flow and team cohesion.

Overview

21
21
years of professional experience

Work History

Production Manager

TACECO Cement Plant ( Green Field Project )
Tanzania , Kasulu
2024.01 - Current

Project Goal: Establish a greenfield cement plant near Kigoma, Tanzania, capable of producing 1 million tons of cement annually. Key Objectives:

  • Secure limestone mines and identify other necessary raw materials.
  • Design a plant tailored to the specific site conditions & Cost effective .
  • Ensure timely commissioning within 22 months.
  • Maintain a zero-accident safety record throughout the project.

Production Head

Apache Cement ( Green Field Project )
Myanmar , Mandalay
2019.08 - 2023.12
  • Capacity: The plant has a total annual capacity of 2 million tons (MT).
  • Lines: 2 Lines Green Field Project was Designed by the SINOMA WUHAN ( 2014 , 2020 )
  • Line 2: A fully integrated green field project plant with a capacity of 4000 tons per day (TPD). Designed by SINOMA WUHAN. Commissioned in 2020.
  • Line 1: An older plant with a capacity of 1600 TPD, commissioned in 2014.

Production Manager

ARM Cement PLC under Administration
Kenya , Mombasa
2018.01 - 2019.07

Understanding the Plant's Capacity and Configuration

  • Location: Kaloleni, Kenya, approximately 40 km from Mombasa.
  • Capacity: 0.6 million tons per annum (MTPA).
  • Design and Upgrades: Designed by ThyssenKrupp and subsequently upgraded by Alstom.

Production Manager

PPC Barnet Congo ( Green Field Project )
CONGO , Matadi
2016.01 - 2018.01
Assessing the Plant in the Democratic Republic of Congo

Understanding the Plant's Capacity and Configuration

  • Location: Kimpese, Democratic Republic of Congo, approximately 250 km from Kinshasa.
  • Capacity: 1.2 million tons per annum (MTPA).
  • Project Type: Greenfield project executed by Sinoma (Engineering, Procurement, and Construction) , Commissioned in 2016

DY Production Manager

ARM Cement PLC
Kenya , Mombasa
2011.01 - 2016.01

Understanding the Plant's Capacity and Configuration.

  • Location: Kaloleni, Kenya, approximately 40 km from Mombasa.
  • Capacity: 0.6 million tons per annum (MTPA).
  • Design and Upgrades: Designed by Thyssen-Krupp and subsequently upgraded by Alstom. By installing the MFC calciner and increasing the Prod from 600 to 1500 TPD.

Senior Engineer & Project Engineer

Binani Cement / Shandong Binani ( PROJECT )
CHINA , RIZAHO
2009.01 - 2011.01
  • China Plant:Location: Shandong
    Designer: CITIC
    Capacity: 2.4 million tons per annum (MTPA)
  • India Plant:Location: Rajasthan, Sirohi District
    Designer: FLS
    Capacity: 5 million tons per annul (MTPA)

Dy Manager

Heidelberg Cement
DAMOH , Madhya Pradesh
2009.01 - 2009.04
  • Role: Deputy Manager
  • Location: Damoh, India
  • Designer: FLS
  • Capacity: 2.2 million tons per annum (MTPA)

Process Engineer

Star Cement
Meghalaya , SHILONG
2005.01 - 2009.01
  • Role: Process Engineer
  • Location: Meghalaya, India
  • Designer: WLL
  • Capacity: 1.2 million tons per annum (MTPA)

Graduate Engineer Trainee

Khyber Cement
Sri Nagar , Jammu
2004.01 - 2005.01
  • Location: Srinagar, India
  • Capacity: 0.6 million tons per annum (MTPA)
  • Designer: FLS
  • GET

Education

PG DIPLOMA in Cement Technology - Cement

National Council for Cement and Building Materials
Delhi Ballabhgarh
2008-05

B. TECH CHEMICAL ENGINERRING - Chemical Engineering

IET BAREILLY
Mahatma Jyotiba Phule Rohilkhand University
2004-03

Skills

  • Operations & Maintenance
  • Project Planning & Management
  • Team Management
  • Quality Assurance & Quality Check
  • Planned equipment constraints
  • Production Oversight
  • Maintenance Planning
  • Project Management
  • Production Optimization
  • Safety Management
  • Business Forecasting
  • Root Cause Analysis
  • Supply chain distribution
  • Resource Allocation
  • Staff Scheduling
  • Production Line Management
  • Production Planning
  • Team Development
  • Training Coordination
  • Value stream mapping
  • Cost Control
  • Workflow Optimization
  • Equipment Operation
  • Technical specifications
  • Purchasing ability
  • Shift checklists
  • Continuous improvement processes
  • Raw Materials Handling
  • KPI Tracking
  • Materials Management

Accomplishments

  • Best Employee of the year in Star Cement
  • Man of the Series in Cricket under 19 District level
  • Recognitions by the Management for finishing the project in China without any LTI

Timeline

Production Manager

TACECO Cement Plant ( Green Field Project )
2024.01 - Current

Production Head

Apache Cement ( Green Field Project )
2019.08 - 2023.12

Production Manager

ARM Cement PLC under Administration
2018.01 - 2019.07

Production Manager

PPC Barnet Congo ( Green Field Project )
2016.01 - 2018.01

DY Production Manager

ARM Cement PLC
2011.01 - 2016.01

Senior Engineer & Project Engineer

Binani Cement / Shandong Binani ( PROJECT )
2009.01 - 2011.01

Dy Manager

Heidelberg Cement
2009.01 - 2009.04

Process Engineer

Star Cement
2005.01 - 2009.01

Graduate Engineer Trainee

Khyber Cement
2004.01 - 2005.01

PG DIPLOMA in Cement Technology - Cement

National Council for Cement and Building Materials

B. TECH CHEMICAL ENGINERRING - Chemical Engineering

IET BAREILLY
DIPENDRA PRATAP SINGH