With 18 years of experience in the Metro Railway and Telecom Industry, my current role as a Senior PSD Expert (K2) within the NCRTC RRTS GC team has allowed me to demonstrate my extensive knowledge. I have designed and implemented 62 full-height and 186 half-height platforms, specializing in Platform Screen Door and Platform Screen Gate systems. My project planning and execution skills have consistently ensured timely and cost-effective project delivery, fostering collaboration with consultants and contractors to meet engineering specifications.

Overview

19
19
years of professional experience

Work History

Senior PSD Expert (K2)

Ayesa India Pvt. Ltd.
05.2021 - Current
  • Review all the design documents and drawings
  • Review all the plans for Quality, Safety, RAMS, Software Assurance, Life Cycle Testing, Design, Installation, Testing & commissioning of PSD
  • Review the safety certificates/simulation and audit/certification reports
  • Monitoring and tracking the overall schedule incorporating the Key Dates
  • Tracking, Monitoring, and forecasting the progress of all activities and deliverables on a weekly/monthly basis
  • Created an interactive dashboard to improve management reporting
  • Monitoring and reporting critical activities relevant to the timeline
  • Oversaw the successful installation, testing, and commissioning of PSG/PSD, addressing challenges to enhance operational efficiency by 100%
  • Review of architect drawings/BIM model / Electrical drawing of the station for meeting PSD requirements
  • Verifying the contractors bills in line with payment milestones of the contract
  • Ensured design compliance with contract requirements, overcoming potential cost impacts, resulting in 100% adherence
  • Participate in solving the technical issues and participate in to claim change process
  • Prepare & Review Interface matrix between Signalling and other Systems i.e
  • Rolling stock, telecom, Track, OHE, Civil & E&M
  • Review the Contractor Submissions of Interface Documents
  • Handling and Monitoring the PSD installation, Testing, and commissioning at Sites
  • Conducting monthly interface meetings with all Civil and System packages for a progress update and advanced compliance with interface requirements
  • Conducting weekly and quarterly Progress meetings with the Client as well as with the PSD contractors
  • Handling Contractual issues with PSD contractor
  • Preparing SWO and other documentation for CMRS approval

Sr. PSD Engineer

Egis India Consulting Engineers Pvt. Ltd.
10.2018 - 03.2021
  • Analyzed 300 design documents and drawings, ensuring compliance with industry standards and enhancing project accuracy
  • Review all the plans for Quality, Safety, RAMS, Software Assurance, Life Cycle Testing, Installation, Testing & commissioning of PSD
  • Monitoring and tracking the overall schedule incorporating the Key Dates
  • Tracking, Monitoring, and forecasting the progress of all activities and deliverables on a weekly/monthly basis
  • Dashboard for management reporting
  • Monitoring and reporting critical activities relevant to the timeline
  • Review architect drawings of the station for meeting PSD requirements
  • Verifying the contractors bills in line with the payment milestones of the contract
  • Facilitated design compliance with contract requirements, overcoming potential cost impacts by ensuring effective collaboration
  • Participate in solving the technical issues and participate in to claim change process
  • Prepare & Review Interface matrix between Signalling and other Systems i.e
  • Rolling stock, telecom, Track, OHE, Civil & E&M
  • Prepare Contractual documents for the PSD system
  • Review the Contractor Submissions of Interface Documents
  • Conducting monthly interface meetings with all Civil and System packages for a progress update and advanced compliance with interface requirements
  • Providing the required input to contractors for a non-awarded contractor through RqFI
  • Conducting site visits for conflict resolution at Level 2 of the Interface Management Procedure

Deputy Project Manager (PSD)

Aikon Technologies (PVT.) Limited
12.2014 - 10.2018
  • Leading Design, Installation, testing, and commissioning team for the CS08 DMRC project
  • Ensuring that assigned work proceeds according to schedule, within budget, and in accordance with all requirements
  • Follow civil work access dates
  • Check and receive technical rooms and Platforms
  • Raise, keep track, and discuss with concerned team members/vendors for Nonconformity of material and design
  • Organizing installation risk assessments and developing and implementing installation work method statements incorporating safe working methods
  • Manages all aspects of safety on site and ensures that all employees (including the sub-contractors) comply with the Health and Safety requirements as detailed in the reference documents in the Project Management Plan, as well as all other applicable safety policies/work instructions
  • Interfacing with internal and external entities (rolling stock, signaling and Telecommunication, other contractors (civil, track work, etc.), the client, and other DMRC authorities
  • To Manage and supervise the installation works, including Installation testing, before the handover of the Platform screen doors to the testing and commissioning team
  • Making of weekly work planning and executing the same for all stations
  • Ensuring all documents required to complete the Project (Action plan, Process mapping, Checklist)
  • To collate all necessary records to ensure full compliance with company and client processes and procedures
  • Review of drawing which is related to the Manufacture, Installation Testing, and Commissioning of the PSG system
  • Providing technical guidance to suppliers and other teams
  • Preparing Progress reports and presentations for management and customer review
  • Attending regular meetings with clients and the team
  • Provide weekly and ad-hoc installation progress reports to the PSG CPM (KTK) and DGM, JGM (DMRC)
  • Responsible for FAT and SAT

Senior Engineer Project (S&T)

Radharani Rail Engineering System Private Limited
02.2012 - 11.2014
  • Mobilized a team to install indoor and outdoor signaling systems for Line, ensuring seamless project delivery
  • Executed a comprehensive CCTV survey on Line to address signal integrity issues, enhancing system reliability by 100%
  • Coordinated multiple site activities to overcome installation delays, achieving 100% on-time project delivery
  • Manages the planning and scheduling of installation and post-installation checkout (PICO) testing
  • Design and participate in station Mock-Up with the client
  • Manages all aspects of safety on site, ensuring that all employees (including the sub-contractors) comply with the Health and Safety requirements as detailed in the reference documents in the Project Management Plan, as well as all other applicable safety policies/work instructions
  • Organizing installation risk assessments and developing and implementing installation work method statements incorporating safe working methods
  • Facilitated collaboration with the KTK-Aikon Interface team to enhance PSD Signalling systems, improving data integration

Telecom Engineer (RF)

Randstad India Limited
10.2010 - 01.2012
  • Design, Engineering, Subcontracting, Procurement, Installation, Testing & Commissioning of New BTS in the rollout
  • RF optimization to maintain Network quality as per TRAI guidelines
  • Responsibility for WCDMA Network planning and design

RF Engineer

Acetel Technologies
04.2009 - 09.2010
  • Responsible for Microwave Survey
  • Make a Path Loss report for Microwave
  • Make a Microwave survey report for the new roll-out microwave antenna installation

RF Engineer

Telecom Network Solution (P) Ltd.
11.2006 - 04.2009
  • Responsible for Microwave Survey
  • Make a Path Loss report for Microwave
  • Make a Microwave survey report for the new roll-out microwave antenna installation

GET

Telecom Network Solution (P) Ltd.
06.2006 - 10.2006
  • Responsible for Microwave Survey

Education

B.Tech - Electronics & Communication

Uttar Pradesh Technical University
01.2006

Skills

  • Project Management
  • Project Planning
  • Risk Management
  • Stakeholder Engagement
  • Resource Allocation
  • Budget Management
  • Effective Timeline Management
  • Performance Monitoring
  • PSD Design Expertise
  • Communication Protocols of PSD/PSG System
  • Understanding of BS/EN/IEC Standards
  • Proficient in Documenting Interfaces
  • Fundamental Understanding of NFPA
  • System Integration Expertise
  • Troubleshooting
  • Data Analysis

Languages

English
Full Professional
Hindi
Native or Bilingual

Timeline

Senior PSD Expert (K2)

Ayesa India Pvt. Ltd.
05.2021 - Current

Sr. PSD Engineer

Egis India Consulting Engineers Pvt. Ltd.
10.2018 - 03.2021

Deputy Project Manager (PSD)

Aikon Technologies (PVT.) Limited
12.2014 - 10.2018

Senior Engineer Project (S&T)

Radharani Rail Engineering System Private Limited
02.2012 - 11.2014

Telecom Engineer (RF)

Randstad India Limited
10.2010 - 01.2012

RF Engineer

Acetel Technologies
04.2009 - 09.2010

RF Engineer

Telecom Network Solution (P) Ltd.
11.2006 - 04.2009

GET

Telecom Network Solution (P) Ltd.
06.2006 - 10.2006

B.Tech - Electronics & Communication

Uttar Pradesh Technical University
Divaker Srivastava