To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills. Dynamic individual performing installations and maintenance on variety of electrical systems. Works knowledgeably with voltage, current and resistance under potentially stressful circumstances. Demonstrates proficient diagnostic abilities and implements resolutions for complex electrical system malfunctions.
Overview
5
5
years of professional experience
Work History
Lead Lineman
C W Wright Construction Co
08.2023 - Current
Read and interpreted [Type] plans, prepared supplies and developed effective plan of action before beginning work.
Complied with legal regulations and company procedures to achieve high-quality performance in safe working environment.
Analyzed preparation documents to correctly set up installations at job sites.
Set ground anchors and guying systems for utility poles.
Strung cables between structures and lines from poles, towers, or trenches and pulled lines to proper tension.
Inspected and tested lines or cables, recording and analyzing test results to assess transmission characteristics and locate faults or malfunctions.
Measured pole attachments and completed proper fitting and construction according to NESC guidelines.
Responded to emergencies and outages that required additional labor and assistance for repairs.
Worked on both dead and energized lines.
Lead Lineman
Great Southwestern Construction Inc.
01.2023 - 08.2023
Complied with legal regulations and company procedures to achieve high-quality performance in safe working environment.
Read and interpreted plans, prepared supplies and developed effective plan of action before beginning work.
Analyzed preparation documents to correctly set up installations at job sites.
Strung cables between structures and lines from poles, towers, or trenches and pulled lines to proper tension.
Inspected and tested lines or cables, recording and analyzing test results to assess transmission characteristics and locate faults or malfunctions.
Performed maintenance and reconducting work in varied weather conditions.
Worked on both dead and energized lines.
Responded to emergencies and outages that required additional labor and assistance for repairs.
Installed and maintained overhead and underground electrical power lines and auxiliary equipment.
Lead Lineman
Orbital Power Inc
01.2021 - 01.2023
Complied with legal regulations and company procedures to achieve high-quality performance in safe working environment.
Analyzed preparation documents to correctly set up installations at job sites.
Worked on both dead and energized lines.
Inspected power lines and poles for signs of damage or wear, interference, and degradation, and reported findings to supervisor.
Performed maintenance and reconducting work in varied weather conditions.
Responded to emergencies and outages that required additional labor and assistance for repairs.
Class A Lineman
LineTec Services
01.2019 - 01.2021
Worked on both dead and energized lines.
Responded to emergencies and outages that required additional labor and assistance for repairs.
Performed maintenance and reconducting work in varied weather conditions.
Proved successful working within tight deadlines and a fast-paced environment.
Resagged loose lines to prevent failures.
Maintained solid safety record with no OSHA-recordable incidents.
Education
No Degree - Linework
Texas State Technical College - Waco
Waco, TX
08.2017
High School Diploma -
Sherando High School
Stephens City, VA
05.2005
Skills
Repair Work
Electrical Power Line Installation
Written and Verbal Communication
Hole Digging
Chain Hoist Operation
Heavy Lifting
Bucket Truck Operation
Shortening and Lengthening Lines
Continuous Improvements
Line Management
Timeline
Lead Lineman
C W Wright Construction Co
08.2023 - Current
Lead Lineman
Great Southwestern Construction Inc.
01.2023 - 08.2023
Lead Lineman
Orbital Power Inc
01.2021 - 01.2023
Class A Lineman
LineTec Services
01.2019 - 01.2021
No Degree - Linework
Texas State Technical College - Waco
High School Diploma -
Sherando High School
Similar Profiles
Pat WrightPat Wright
Construction Supervisor at Wright ConstructionConstruction Supervisor at Wright Construction