Summary

Seasoned Construction Manager with 10 years of experience overseeing construction projects. Results-driven approach, excelling in coordinating with architects, engineers, and subcontractors to ensure projects meet specifications, timelines, and budgets. Expertise includes subcontractor management, project documentation, construction software, and compliance with safety regulations. Strong leadership, risk assessment, and budgeting capabilities. Recent roles demonstrate efficient installation management, project plan implementation, and budget analysis. Proven track record in training site managers, supervising construction crews, and maintaining clear client communication. Background in solar projects, material handling equipment (MHE) and quality assurance reflects a commitment to safety and high-quality outcomes.

Overview

11
11
years of professional experience

Work History

Site Construction Manager

Solotech Integration USA
07.2023 - 09.2024
  • Spearheaded the efficient installation of audio-visual equipment across diverse venues, ensuring high-quality results
  • Developed and implemented detailed project plans, schedules, and timelines to meet deadlines and client expectations
  • Collaborated with architects, engineers, and stakeholders to define and refine project requirements
  • Selected appropriate tools, materials, and processes for seamless installation and integration
  • Conducted comprehensive budget analyses and prepared accurate cost estimates
  • Assisted in preparing RFIs (Requests for Information) to optimize field engineering practices
  • Leveraged ProCore and PlanGrid construction software to streamline project management and installation processes
  • Managed and coordinated the activities of on-site personnel, including third-party technicians, to ensure project alignment and efficiency
  • Ensured all construction activities adhered to local, state, and federal safety regulations

Senior Site Manager

S&H Systems/Amazon
01.2020 - 09.2022
  • Trained and guided a team of eight site managers, fostering high productivity and achieving performance excellence
  • Monitored site managers’ performance through active engagement and analysis of daily site reports
  • Reviewed project schedules and status updates with the Project Manager and Client Representative to ensure alignment with objectives
  • Assisted in procuring required permits and ensuring compliance with regulatory requirements
  • Coordinated, supported, and supervised the activities of on-site personnel, including third-party installers, control wiring specialists, and other stakeholders
  • Assessed project status, progress, and staffing levels, collaborating with the Project Manager and relevant personnel overseeing third-party teams
  • Identified and resolved materials, logistics, and staffing challenges through proactive problem-solving
  • Established and maintained clear communication channels internally and with clients to ensure seamless project execution
  • Recognized individual employee strengths and implemented a mentoring program to address and improve areas of development

Site Manager

Diversified Conveyors International / UPS Parcel
08.2018 - 11.2019
  • Implemented project plans, schedules, and timelines to ensure milestones were met and deliverables exceeded expectations
  • Collaborated with Project Management, Engineers, and stakeholders to define detailed project requirements and align goals
  • Conducted weekly coordination meetings to review progress, address challenges, and ensure team alignment
  • Assessed project status, progress, and staffing levels, partnering with the Project Manager and third-party teams to optimize resource allocation
  • Maintained and promoted a safe, cooperative, and productive work environment by fostering collaboration among clients, their representatives, project management teams, subcontractors, and contractors
  • Established and maintained clear communication channels internally and externally to ensure seamless project execution and client satisfaction

Construction Manager

Aerotek Staffing/ImModo Energy
05.2017 - 01.2018
  • Conducted pre-construction planning, developed construction schedules, and determined contractor and labor requirements for successful project execution
  • Ensured high-quality control and assurance levels strongly emphasizing crew safety and compliance
  • Maintained hazard-free worksites by ensuring cleanliness, debris removal, and adherence to safety protocols
  • Acted as the primary contact for local permitting officials and inspectors, ensuring regulatory compliance
  • Tracked and reported project progress, critical milestones, and costs to maintain transparency and accountability
  • Managed a team of three leads, supervising30 construction workers and maintaining productivity and quality during solar module installations
  • Conducted risk assessments and implemented mitigation strategies to prevent project delays and cost overruns
  • Surveyed sites to determine material requirements, accurately managed inventories, and adhered to budgets
  • Collaborated with contractors, architects, engineers, and public agencies to complete projects within timeline and budget constraints

Installation Supervisor

Konisto Companies, LLC
09.2016 - 04.2017
  • Supervised a crew of15+ employees in successfully installing solar modules, ensuring high-quality workmanship
  • Documented and tracked all man-hours, ensuring accurate reporting and efficient resource management
  • Completed the project10 days ahead of schedule, demonstrating effective leadership and time management
  • Supported the Project Manager by organizing group and safety meetings to promote compliance and team cohesion
  • Assisted the Site Logistics Manager in distributing materials across the site to optimize workflow and minimize delays

QA/QC Inspector

IBEW Local428/CSI Electric Inc (200MW Garland Solar Project)
05.2016 - 09.2016
  • Conducted rigorous quality assurance and quality control inspections to ensure compliance with solar installation standards and specifications
  • Inspected solar modules, mounting structures, electrical connections, and other system components to verify adherence to design plans and industry best practices
  • Documented and reported non-conformances, identified root causes, and provided actionable recommendations for corrective measures
  • Collaborated with project teams, contractors, and engineers to ensure all installations met safety, performance, and regulatory requirements
  • Conducted site audits to assess work progress, material quality, and compliance with QA/QC protocols
  • Maintained accurate records of inspection results, material traceability, and inspection schedules
  • Assisted in training crew members on quality standards, safety protocols, and best practices for solar installations
  • Worked closely with local permitting officials to ensure all inspections met regulatory compliance

QA/QC Inspector

IBEW Local428/Rosendin Electric Inc (54MW Rosamond Solar Project)
01.2016 - 05.2016
  • Conducted pre-construction planning, developed construction schedules, and determined contractor and labor requirements for successful project execution
  • Ensured high-quality control and assurance levels strongly emphasizing crew safety and compliance
  • Maintained hazard-free worksites by ensuring cleanliness, debris removal, and adherence to safety protocols
  • Acted as the primary contact for local permitting officials and inspectors, ensuring regulatory compliance
  • Tracked and reported project progress, critical milestones, and costs to maintain transparency and accountability
  • Managed a team of three leads, supervising30 construction workers and maintaining productivity and quality during solar module installations
  • Conducted risk assessments and implemented mitigation strategies to prevent project delays and cost overruns
  • Surveyed sites to determine material requirements, accurately managed inventories, and adhered to budgets
  • Collaborated with contractors, architects, engineers, and public agencies to complete projects within timeline and budget constraints

QA/QC Inspector

IBEW Local428/Cupertino Electric Inc (40MW Kingbird Solar Project)
06.2015 - 12.2015
  • Conducted rigorous quality assurance and quality control inspections to ensure compliance with solar installation standards and specifications
  • Inspected solar modules, mounting structures, electrical connections, and other system components to verify adherence to design plans and industry best practices
  • Documented and reported non-conformances, identified root causes, and provided actionable recommendations for corrective measures
  • Collaborated with project teams, contractors, and engineers to ensure all installations met safety, performance, and regulatory requirements
  • Conducted site audits to assess work progress, material quality, and compliance with QA/QC protocols
  • Maintained accurate records of inspection results, material traceability, and inspection schedules
  • Assisted in training crew members on quality standards, safety protocols, and best practices for solar installations
  • Worked closely with local permitting officials to ensure all inspections met regulatory compliance

QA/QC Inspector

IBEW Local428/Rosendin Electric Inc (579MW Solar Star Project)
01.2015 - 06.2015
  • Conducted rigorous quality assurance and quality control inspections to ensure compliance with solar installation standards and specifications
  • Inspected solar modules, mounting structures, electrical connections, and other system components to verify adherence to design plans and industry best practices
  • Documented and reported non-conformances, identified root causes, and provided actionable recommendations for corrective measures
  • Collaborated with project teams, contractors, and engineers to ensure all installations met safety, performance, and regulatory requirements
  • Conducted site audits to assess work progress, material quality, and compliance with QA/QC protocols
  • Maintained accurate records of inspection results, material traceability, and inspection schedules
  • Assisted in training crew members on quality standards, safety protocols, and best practices for solar installations
  • Worked closely with local permitting officials to ensure all inspections met regulatory compliance

QA/QC Inspector

IBEW Local428/Cupertino Electric Inc (579MW Solar Star Project)
04.2013 - 12.2014
  • Conducted rigorous quality assurance and quality control inspections to ensure compliance with solar installation standards and specifications
  • Inspected solar modules, mounting structures, electrical connections, and other system components to verify adherence to design plans and industry best practices
  • Documented and reported non-conformances, identified root causes, and provided actionable recommendations for corrective measures
  • Collaborated with project teams, contractors, and engineers to ensure all installations met safety, performance, and regulatory requirements
  • Conducted site audits to assess work progress, material quality, and compliance with QA/QC protocols
  • Maintained accurate records of inspection results, material traceability, and inspection schedules
  • Assisted in training crew members on quality standards, safety protocols, and best practices for solar installations
  • Worked closely with local permitting officials to ensure all inspections met regulatory compliance

Education

OSHA30 - General Industry Safety and Health

01.2022

OSHA30 - Construction Safety and Health

01.2021

OSHA510 - Standards for Construction

California State University, Dominguez Hills
01.2020

High School - undefined

South Oak Cliff High School
Dallas, TX
01.1981

Skills

  • Subcontractor Management
  • Project deadline management
  • Construction Software
  • Team leadership and communication
  • Risk assessment and mitigation
  • Quality control assurance
  • Budgeting and cost control
  • Problem-solving

Timeline

Site Construction Manager

Solotech Integration USA
07.2023 - 09.2024

Senior Site Manager

S&H Systems/Amazon
01.2020 - 09.2022

Site Manager

Diversified Conveyors International / UPS Parcel
08.2018 - 11.2019

Construction Manager

Aerotek Staffing/ImModo Energy
05.2017 - 01.2018

Installation Supervisor

Konisto Companies, LLC
09.2016 - 04.2017

QA/QC Inspector

IBEW Local428/CSI Electric Inc (200MW Garland Solar Project)
05.2016 - 09.2016

QA/QC Inspector

IBEW Local428/Rosendin Electric Inc (54MW Rosamond Solar Project)
01.2016 - 05.2016

QA/QC Inspector

IBEW Local428/Cupertino Electric Inc (40MW Kingbird Solar Project)
06.2015 - 12.2015

QA/QC Inspector

IBEW Local428/Rosendin Electric Inc (579MW Solar Star Project)
01.2015 - 06.2015

QA/QC Inspector

IBEW Local428/Cupertino Electric Inc (579MW Solar Star Project)
04.2013 - 12.2014

OSHA30 - Construction Safety and Health

OSHA510 - Standards for Construction

California State University, Dominguez Hills

High School - undefined

South Oak Cliff High School

OSHA30 - General Industry Safety and Health