Summary
Overview
Work History
Education
Skills
Timeline
Generic

Anthony Bowen

Greenville,GA

Summary

Journeyman reinforcing ironworker with several years of diverse ironwork experience. Reinforcing expert with record of safe and durable completion of multiple structures using various techniques. Exceptional leader, mentor and individual performer with proven success at meeting any construction site challenge.

Overview

9
9
years of professional experience

Work History

Ironworker Supervisor

Rebal Steel
Braselton, MI
02.2022 - 04.2024
  • Supervised and coordinated the activities of workers engaged in fabricating, erecting and repairing structural iron and steel components.
  • Monitored work progress to ensure quality standards were met according to project specifications.
  • Inspected materials for conformance with established standards before use on job sites.
  • Prepared daily reports detailing labor hours, equipment usage and material costs.
  • Coordinated with other trades personnel in order to meet construction deadlines.
  • Maintained a safe working environment by enforcing safety regulations and procedures.
  • Provided technical advice and guidance to subordinates regarding proper installation techniques.
  • Assisted with the layout of structures using blueprints, skhes or verbal instructions from engineers or architects.
  • Developed standard operating procedures for efficient completion of projects within specified timeframes.
  • Ensured that all tools, materials and equipment were used properly and safely stored when not in use.
  • Trained new employees on welding processes, safety protocols, operation of machinery and general shop practices.
  • Organized crew schedules for optimal productivity while ensuring compliance with overtime laws.
  • Ordered supplies as needed for timely completion of projects within budget constraints.
  • Resolved any conflicts between workers regarding tasks or responsibilities in a professional manner.
  • Reported any problems or delays to higher management as soon as possible.
  • Performed regular maintenance checks on tools, equipment and machinery to ensure safe operations.
  • Conducted performance reviews of assigned staff members according to company guidelines.
  • Developed detailed cost estimates for materials required for each job site prior to commencement of work.
  • Kept up-to-date records of all employee certifications such as rigging licenses, OSHA 10 cards.
  • Verified accuracy of invoices submitted by vendors before processing payments.
  • Evaluated existing methods used by workers in order to suggest improvements where applicable.
  • Signaled crane operators in safe and accurate lifting and placing of reinforcing iron members and moved rebars manually into specific positions.
  • Collaborated with construction foreman to establish and confirm task sequences and reinforcing requirements.
  • Worked closely with structural ironworkers, ornamental Ironworkers, riggers and machinery movers, enabling clear and safe cross-functional operations.
  • Determined safety risks associated with projects and implemented precautions to address risks.
  • Studied and understood blueprints and specifications before beginning work on projects.
  • Led and mentored less-experienced ironworkers and assisted foremen in assigning work activities.
  • Managed and tracked materials and supplies needed for projects and expedited additional materials to avoid project delay.
  • Wrote and submitted detailed project reports and evaluated completed work via visual inspection to confirm safety and quality of work.
  • Reinforced concrete via cables and pre-and post-tensioning techniques on arenas and parking garages.
  • Identified reinforcing rod quantities, sizes and locations from blueprints and informal instructions.
  • Encouraged workers to take precautions to prevent mishaps and injuries on job sites.
  • Received structural steel and moved it to modular locations.
  • Assessed blueprints and specifications to determine aspects of project before work started.
  • Performed layout and set up blocking in mod footprint.
  • Prepared and planned worksites to help jobs run smoothly.
  • Delegated duties to employees based on skillset.
  • Delegated work to staff, setting priorities and goals.
  • Trained and monitored employees to teach daily tasks and improve performance.
  • Reported project progress, site problems and labor status to supervisors.
  • Established and enforced procedures and work standards, promoting team performance and safety.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
  • Kept production team moving forward for progress in daily site operations.
  • Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
  • Monitored project progress to enforce adherence to deadlines and quality standards.
  • Created work crew schedules and delegated assignments.
  • Kept detailed progress records to hit strict deadlines and adjust plans.
  • Allocated material and labor resources to promote on-time and under-budget project completion.
  • Obtained specifications and directed work for construction crews.
  • Recruited and hired workers, in addition to supervising and monitoring daily performance.
  • Defined and monitored personnel and project schedules to ensure on-time project completion.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Monitored equipment operation during extraction process to detect problems.
  • Adjusted equipment to prepare for excavating and boring geological materials.
  • Set up and took down drilling rig and equipment.

Ironworker Foreman

Dixie Errectors
Mableton, GA
04.2015 - 03.2022
  • Directed and supervised the day-to-day operations of a team of ironworkers to ensure projects were completed on time and within budget.
  • Ensured the safety of personnel by adhering to OSHA regulations, inspecting tools, equipment, and work sites for hazards.
  • Coordinated with management staff in order to understand project requirements and timelines.
  • Assigned tasks to personnel based on their skill level and availability.
  • Inspected finished products for accuracy in accordance with blueprints and specifications.
  • Provided guidance and instruction to workers regarding proper techniques for installation, welding, fabrication, and erection of structural steel components.
  • Monitored job progress daily to ensure that deadlines were met while maintaining quality standards.
  • Scheduled regular maintenance inspections for equipment such as cranes, hoists, forklifts., ensuring that they were kept in good working condition at all times.
  • Resolved conflicts between workers or between workers and management when needed.
  • Maintained records of labor hours worked as well as materials used in order to accurately report costs associated with each project.
  • Trained new personnel in safe operating procedures for all necessary tools and machinery used on the job site.
  • Ordered supplies such as bolts, nuts, rigging gear. when needed.
  • Conducted weekly safety meetings with crew members to review safety protocols and discuss any potential hazards or risks associated with the project.
  • Developed strategies for improving efficiency while minimizing waste during construction processes.
  • Reviewed plans prior to beginning construction projects so that any discrepancies could be addressed before starting work.
  • Worked closely with vendors and suppliers in order to obtain competitive pricing on materials required for projects.
  • Responded promptly to customer inquiries regarding product specifications or delivery schedules.
  • Prepared detailed reports documenting activities throughout the duration of each project.
  • Investigated accidents and incidents occurring on job sites in order to determine causes and prevent future occurrences.
  • Implemented cost control measures where possible without compromising quality or safety standards.
  • Collaborated with construction foreman to establish and confirm task sequences and reinforcing requirements.
  • Worked closely with structural ironworkers, ornamental Ironworkers, riggers and machinery movers, enabling clear and safe cross-functional operations.
  • Signaled crane operators in safe and accurate lifting and placing of reinforcing iron members and moved rebars manually into specific positions.
  • Studied and understood blueprints and specifications before beginning work on projects.
  • Determined safety risks associated with projects and implemented precautions to address risks.
  • Managed and tracked materials and supplies needed for projects and expedited additional materials to avoid project delay.
  • Led and mentored less-experienced ironworkers and assisted foremen in assigning work activities.
  • Identified reinforcing rod quantities, sizes and locations from blueprints and informal instructions.
  • Reinforced concrete via cables and pre-and post-tensioning techniques on arenas and parking garages.
  • Wrote and submitted detailed project reports and evaluated completed work via visual inspection to confirm safety and quality of work.
  • Received structural steel and moved it to modular locations.
  • Encouraged workers to take precautions to prevent mishaps and injuries on job sites.
  • Reported project progress, site problems and labor status to supervisors.
  • Performed layout and set up blocking in mod footprint.
  • Assessed blueprints and specifications to determine aspects of project before work started.
  • Monitored equipment operation during extraction process to detect problems.
  • Allocated material and labor resources to promote on-time and under-budget project completion.
  • Kept production team moving forward for progress in daily site operations.
  • Delegated duties to employees based on skillset.
  • Prepared and planned worksites to help jobs run smoothly.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
  • Trained and monitored employees to teach daily tasks and improve performance.
  • Monitored project progress to enforce adherence to deadlines and quality standards.
  • Established and enforced procedures and work standards, promoting team performance and safety.
  • Delegated work to staff, setting priorities and goals.
  • Created work crew schedules and delegated assignments.
  • Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
  • Recruited and hired workers, in addition to supervising and monitoring daily performance.
  • Defined and monitored personnel and project schedules to ensure on-time project completion.
  • Kept detailed progress records to hit strict deadlines and adjust plans.
  • Adjusted equipment to prepare for excavating and boring geological materials.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Obtained specifications and directed work for construction crews.
  • Set up and took down drilling rig and equipment.

Education

GED -

Greenville High School
Greenville, GA
03-1999

Skills

  • OSHA Regulations
  • Job Site Organization
  • Structural welding
  • Fall protection
  • First-aid and CPR
  • Heavy Lifting
  • Safety protocols and procedures
  • Welding
  • Blueprint Reading
  • Forklift Operation
  • Blueprint Interpretation
  • Prefabricated steel unloading
  • Safety measures
  • Blowtorches and equipment
  • OSHA Compliance

Timeline

Ironworker Supervisor

Rebal Steel
02.2022 - 04.2024

Ironworker Foreman

Dixie Errectors
04.2015 - 03.2022

GED -

Greenville High School
Anthony Bowen