Doyle Kim

Downey,CA

Summary

Doyle Kim is a Construction Project Manager with over 8 years of experience in construction and facilities management, specializing in public works and municipal projects. He has successfully led diverse projects, including educational facilities, recreational buildings, and critical infrastructure upgrades, ensuring compliance with strict codes, regulations, and complex programming requirements. Doyle’s expertise includes analyzing and implementing cost-effective solutions, managing contractor coordination, and ensuring projects meet schedule and budget objectives. He also has ability to collaborate with city agencies, consultants, and subcontractors has consistently resulted in seamless project execution and compliance with jurisdictional requirements.

Overview

6
6
years of professional experience
1
1
Certification

Work History

Project Manager

Exbon Development, Inc.
Garden Grove, CA
01.2018 - 01.2024
  • Project Manager; Obregon Park HVAC & Roof Replacement (Los Angeles County Internal Services Department), $2M (2023 – 2024)
  • Oversaw the replacement of the roof and HVAC systems for a public gym facility
  • Reviewed and ensured compliance with construction specifications, environmental regulations, and Title 24 requirements
  • Coordinated with subcontractors for timely procurement of materials and efficient installation of mechanical systems
  • Addressed testing and commissioning challenges, including managing Title 24 documentation and liaising with consultants for project approvals
  • Provided on-site teams with detailed project plans to ensure smooth execution and timely delivery

Project Manager

Los Angeles County Internal Services Department
01.2022 - 01.2023
  • Project Manager; Carson Library Fire Alarm Replacement (Los Angeles County Internal Services Department), $2.5M (2022 – 2023)
  • This project focused on asbestos abatement to facilitate the installation of a full fire sprinkler system
  • Fire suppression system was installed throughout the entire building, including the second floor
  • The project involved upgrading the existing partial fire alarm system with removal and installing the full fire alarm system in the building
  • The installation of the new sprinkler and fire alarm systems required the replacement of the entire ceiling system, so the entire ceiling system was replaced with a new acoustical ceiling system

Project Manager

California Department of General Services
01.2021 - 01.2022
  • Project Manager; California School for the Deaf, Bldg
  • P, (California Department of General Services), $2.5M (2021 – 2022)
  • The Building P Roof Replacement Project at the California School for the Deaf involved the removal and replacement of the existing ballasted built-up roofing system with a new single-ply roofing system
  • The project also includes the demolition of Room 310 and replacement of HVAC equipment on the roof along with the upgrade of the existing electrical system on the roof

Project Manager

Los Angeles County Internal Services Department
01.2020 - 01.2021
  • Project Manager; Agoura Hills Animal Care Center (Los Angeles County Internal Services Department), $1M (2020 – 2021)
  • This project involved upgrading the existing power distribution system, including the replacement of the switchboard, motor control center, panelboards, and transformer
  • The scope also included the replacement of control instruments such as timers, relays, controllers, and input/output devices associated with the motor control center and panelboards
  • The project required replacing the existing furnace and condensing unit with new equipment and removing and replacing 75 feet of the sanitary sewer line

Project Manager

UCI
01.2024
  • Project Manager; UCI Medical Center Building 30 and 30A Roof Replacement (UCI), $1M (2024 – 2024)
  • Managed the replacement of roofing systems for two adjacent buildings at a public facility
  • Ensured compliance with project specifications, safety regulations, and environmental requirements, including stormwater pollution prevention measures
  • Coordinated material procurement and scheduling to minimize disruptions to facility operations
  • Supervised subcontractor teams and conducted regular progress inspections

Project Manager

City of Long Beach
01.2022
  • Project Manager; MacArthur Park New Restroom, (City of Long Beach), $0.7M (2022-2022)
  • This project involved the new construction of a restroom building, including three standard restrooms, one ADA compliant restroom, and a janitor closet
  • The scope of work included earthwork involving grading, compaction, and concrete footing, with the installation of CMU
  • The project included the installation and connection of plumbing for the restrooms and the main sewer line connection

Project Manager

DSA/Los Angeles Unified School District
01.2021
  • Project Manager; Gulf Elementary School, Canopy Structural Retrofit (DSA/Los Angeles Unified School District), $1.5M (2021 – 2021)
  • The project involved retrofitting and repairing the existing canopy structure and adjacent concrete stairs at Gulf Elementary School
  • The scope included the installation of new handrails to meet safety standards
  • The renovation of the existing restrooms in the building involved new wall partitions and the installation of restroom accessories, such as grab bars, mirrors, and other fixtures
  • The project also involved door replacements and the installation of base cabinets in the buildings

Project Manager

DSA/Los Angeles Unified School District
01.2021
  • Project Manager; Cleveland Charter High School, Gym Roof Replacement (DSA/ Los Angeles Unified School District), $1.5M (2021 – 2021)
  • The scope of work included the installation of a new single-ply PVC roofing system
  • The project also involved sheet metal work, including the fabrication and installation of metal flashings and gutters

Education

Associate of Arts - Construction management

Mt. Sac Antonio College
Walnut, CA
12.2025

Skills

  • Gordian
  • Bluebeam Revu
  • MS Office (Outlook, Excel, Project, Word, etc)

Certification

OSHA 30

Personal Information

Title: Assistant Construction Manager

Projects

Obregon Park HVAC & Roof Replacement, Los Angeles County Internal Services Department, $2M, 01/01/23 - 12/31/24, Oversaw the replacement of the roof and HVAC systems for a public gym facility. Reviewed and ensured compliance with construction specifications, environmental regulations, and Title 24 requirements. Coordinated with subcontractors for timely procurement of materials and efficient installation of mechanical systems. Addressed testing and commissioning challenges, including managing Title 24 documentation and liaising with consultants for project approvals. Provided on-site teams with detailed project plans to ensure smooth execution and timely delivery. UCI Medical Center Building 30 and 30A Roof Replacement, UCI, $1M, 01/01/24 - 12/31/24, Managed the replacement of roofing systems for two adjacent buildings at a public facility. Ensured compliance with project specifications, safety regulations, and environmental requirements, including stormwater pollution prevention measures. Coordinated material procurement and scheduling to minimize disruptions to facility operations. Supervised subcontractor teams and conducted regular progress inspections. Carson Library Fire Alarm Replacement, Los Angeles County Internal Services Department, $2.5M, 01/01/22 - 12/31/23, This project focused on asbestos abatement to facilitate the installation of a full fire sprinkler system. Fire suppression system was installed throughout the entire building, including the second floor. The project involved upgrading the existing partial fire alarm system with removal and installing the full fire alarm system in the building. The installation of the new sprinkler and fire alarm systems required the replacement of the entire ceiling system, so the entire ceiling system was replaced with a new acoustical ceiling system. MacArthur Park New Restroom, City of Long Beach, $0.7M, 01/01/22 - 12/31/22, This project involved the new construction of a restroom building, including three standard restrooms, one ADA compliant restroom, and a janitor closet. The scope of work included earthwork involving grading, compaction, and concrete footing, with the installation of CMU. The project included the installation and connection of plumbing for the restrooms and the main sewer line connection. California School for the Deaf, Bldg. P, California Department of General Services, $2.5M, 01/01/21 - 12/31/22, The Building P Roof Replacement Project at the California School for the Deaf involved the removal and replacement of the existing ballasted built-up roofing system with a new single-ply roofing system. The project also includes the demolition of Room 310 and replacement of HVAC equipment on the roof along with the upgrade of the existing electrical system on the roof. Gulf Elementary School, Canopy Structural Retrofit, DSA/Los Angeles Unified School District, $1.5M, 01/01/21 - 12/31/21, The project involved retrofitting and repairing the existing canopy structure and adjacent concrete stairs at Gulf Elementary School. The scope included the installation of new handrails to meet safety standards. The renovation of the existing restrooms in the building involved new wall partitions and the installation of restroom accessories, such as grab bars, mirrors, and other fixtures. The project also involved door replacements and the installation of base cabinets in the buildings. Cleveland Charter High School, Gym Roof Replacement, DSA/ Los Angeles Unified School District, $1.5M, 01/01/21 - 12/31/21, The scope of work included the installation of a new single-ply PVC roofing system. The project also involved sheet metal work, including the fabrication and installation of metal flashings and gutters. Agoura Hills Animal Care Center, Los Angeles County Internal Services Department, $1M, 01/01/20 - 12/31/21, This project involved upgrading the existing power distribution system, including the replacement of the switchboard, motor control center, panelboards, and transformer. The scope also included the replacement of control instruments such as timers, relays, controllers, and input/output devices associated with the motor control center and panelboards. The project required replacing the existing furnace and condensing unit with new equipment and removing and replacing 75 feet of the sanitary sewer line.

Relevantprojectexperience

  • Exbon Development, Inc., Garden Grove, CA, Project Manager, 01/01/18 - 12/31/24
  • P&P Develop, Inc., Garden Grove, CA, Project Engineer, 01/01/16 - 12/31/18

Yearsofexperience

8

Timeline

Project Manager

UCI
01.2024

Project Manager

Los Angeles County Internal Services Department
01.2022 - 01.2023

Project Manager

City of Long Beach
01.2022

Project Manager

California Department of General Services
01.2021 - 01.2022

Project Manager

DSA/Los Angeles Unified School District
01.2021

Project Manager

DSA/Los Angeles Unified School District
01.2021

Project Manager

Los Angeles County Internal Services Department
01.2020 - 01.2021

Project Manager

Exbon Development, Inc.
01.2018 - 01.2024

Associate of Arts - Construction management

Mt. Sac Antonio College