Overview
Work History
Timeline
Generic

Duane R. Rawlins

Overview

36
36
years of professional experience

Work History

Electrical Engineer

NTN Driveshaft Inc.
11.2015 - 03.2026
  • Supported production and maintenance departments through PLC programming, HMI development, and VFD troubleshooting using Mitsubishi platforms.
  • Sourced and procured new and replacement equipment to improve direct and indirect production operations.
  • Managed automation and equipment projects from specification through installation, improving forging machine efficiency.
  • Installed and integrated Keyence light curtains into PLC safety logic.
  • Developed plant layouts, machinery layouts, and electrical schematics using AutoCAD 2023 and SketchUp Pro (3D modeling).

Electrical Engineer

ELMCO Engineering Inc.
11.2014 - 11.2015
  • Created 2D electrical drawings for control panels and press elevations using DraftSight CAD.
  • Programmed and modified HMIs using Rockwell FactoryTalk to meet customer requirements.
  • Modified PLC programs using ControlLogix 5000 software to support system changes and upgrades.
  • Worked directly with customers to deliver tailored control solutions.

Maintenance Technician / Coordinator

Kroger’s Indianapolis Bakery
07.2009 - 08.2011
  • Served as third-shift Maintenance Coordinator.
  • Troubleshot and repaired electrical and mechanical issues on bakery manufacturing equipment including mixers, proofers, ovens, and cooling systems.
  • Performed preventive and proactive maintenance to ensure continuous production.

Maintenance Electrician

Pizza Blends Inc.
05.2003 - 07.2009
  • Installed and merged two independent dough sheeting lines.
  • Implemented electrical changes to support evolving production needs.
  • Coordinated electrical renovation and relocation of spiral freezers and packaging systems.
  • Upgraded electromechanical circuits and controls on dough extruders to improve efficiency.

Technician / Group Leader

PK U.S.A. Inc.
05.1990 - 08.2002
  • Led maintenance teams by assigning work orders, distributing technical support, and coordinating technicians and dispatchers.
  • Improved team productivity by approximately 20% through better task organization.
  • Designed improved preventive maintenance procedures for 120 robots, reducing material usage by 50% and downtime by 10%.
  • Planned and executed repairs on production presses, eliminating recurring stoppages during changeovers.

Timeline

Electrical Engineer

NTN Driveshaft Inc.
11.2015 - 03.2026

Electrical Engineer

ELMCO Engineering Inc.
11.2014 - 11.2015

Maintenance Technician / Coordinator

Kroger’s Indianapolis Bakery
07.2009 - 08.2011

Maintenance Electrician

Pizza Blends Inc.
05.2003 - 07.2009

Technician / Group Leader

PK U.S.A. Inc.
05.1990 - 08.2002
Duane R. Rawlins