Results-driven Superintendent, bringing pride and accountability back to the construction industry. Expertise in scheduling, safety compliance, and quality control. Proven ability to lead teams and manage subcontractors to ensure project success.
A&B Rana - 2019 and 2022
$510,000 initial build of CMU building shell with TPO roof. Later a $426,000 interior build-out for a cosmetology school. All framing, drywall, plumbing, painting, flooring, millwork and casework was self preformed.
A&B Rana - 2021
$495,000 major multistory renovation. Self preformed work included demo to studs/CMU, converting second story into a wrap around mezzanine, structural steel, flooring, concrete polishing, millwork and casework.
A&B Rana - 2022
$157,000 tenant improvement in a strip mall. Complete demo to studs and buildout. Self preformed all of scope but electrical.
BluCor Construction - 10/23 to 05/24
$882,500 ground up construction of a three story wood framed structure for concessions, restrooms, and a press box for the new football stadium. Scope also included extensive grading, sidewalks, and aluminum bleachers. Replaced the superintendent on site at the end of January through project completion.
BluCor Construction - 01/24 to 03/24
$1,131,500 re-roof at two separate locations with major radiant heat and exhaust fan updates. Required full time supervision for EDPM reroof and transitioned to remote/occasional onsite supervision.
BluCor Construction - 04/24 to 06/24
$229,600 exterior improvement job. Superintendent on site for demo, stucco, metal panels, brick work, painting and partial re-roof. Self preformed replacement of five HMF doors and hardware.
BluCor Construction - 06/24 to 08/24
$388,100 renovation on an tight schedule . Consisted of adding an ADA bathroom, replacement of gym floor/asbestos abatement, extensive drywall repair, and painting every wall. Superintendent on site throughout project. Worked with extremely stringent controlled access as required by Milard Public Schools.
Blucor Construction - 07/24 to 05/25
$1,109,600 ground up construction of a 5,700 sqft PEMB for the University of Nebraska. Required complex SWPP plan due to location and existing grading. Superintendent onsite. Self preformed door hardware, bathroom accessories, and cabinet installation.
Blucor Construction - 06/25 to 07/25
$296,500 renovation for CPS to add controlled access vestibules to five schools. Project was on a tight timeline with a scope that included: demo, masonry, framing/drywall, HVAC, electrical/low-voltage, HMF/doors, and flooring. Self preformed HMF, door/hardware and cabinet installation.