Summary
Overview
Work History
Education
Skills
Websites
Certification
Languages
Project Involved
Timeline
Generic

Duo Xu

Orlando,FL

Summary

Currently working for M.C.Dean, Inc. as a Telecommunication/Low Voltage System Design Engineer. Civil engineering and facility management background with internships on construction sites and real estate company; work experience of using design/scheduling software, such as AutoCAD, MS Project, Bluebeam, Revit, NavisWork and Procore.

Overview

5
5
years of professional experience
1
1
Certification

Work History

Telecommunication Design Engineer 2

M.C.Dean, Inc.
02.2019 - Current
  • Prepare and reviews construction project specifications and data sheets
  • Assist in design reviews and checks
  • Assist in review of supplier documentation for compliance with specifications
  • Develop load list / cable schedules / run lists
  • Develop low voltage system backbone diagram risers, horizontal cable shop drawings, telecom room design and closeout as-builts
  • Maintain facility Requests for Information (RFI), construction submittals, and documents for construction coordination
  • Perform 3D coordination of civil, mechanical, electrical and plumbing elements in the creation of construction drawings
  • Coordinate subcontractors (ECS, FA and BAS) and making/revising system drawings
  • Use knowledge of construction engineering and management to incorporate telecommunication systems into other aspects of the project (civil, mechanical, etc)
  • Anticipate and address changes as they occur to assist field and engineers make immediate decisions and give appropriate guidance to field workers
  • Develop cable test plan, set up field tester and generate test reports and test analysis.

Education

Master of Science - Construction Management

Georgia Institute of Technology
Atlanta, GA
12-2018

Skills

  • Document Control
  • Cable Testing
  • Cost Analysis
  • Low Voltage System Design
  • Electrical System Design
  • Value Engineering
  • 2D and 3D modeling
  • Quality Control

Certification

  • SP8850 - PRE TERMINATED DATA CENTER SOLUTIONS
  • SP4420 - FIBER OPTIC INFRASTRUCTURE SPECIALIST
  • SP3801 - INSTALLING PREMISES CABLING SYSTEM ACT1
  • WR9703 - CABLING FOR PoE

Languages

English
Full Professional
Chinese (Mandarin)
Native/ Bilingual

Project Involved

  • Project 1. –Orlando International Airport Terminal C (2019 to 2023)
  • Project 2. –Walter Reed Hospital –Maryland (2023 to now)
  • project 3. –Charlotte International Airport –CAP2 and Terminal/Lobby Expansion (2023 to now)

Timeline

Telecommunication Design Engineer 2

M.C.Dean, Inc.
02.2019 - Current

Master of Science - Construction Management

Georgia Institute of Technology
Duo Xu