Dynamic and results-driven professional with extensive experience at Thompson Construction Group Inc. Proven ability to enhance project efficiency through effective team leadership and meticulous blueprint interpretation. Skilled in power tool operation and committed to safety, consistently delivering high-quality results while mentoring junior staff to foster a skilled workforce.
Overview
8
8
years of professional experience
Work History
Pipefitter Helper
TiER1
02.2025 - Current
Measured, cut, threaded and assembled new pipe to place assembled pipe in hangers or other supports.
Improved pipefitting efficiency by assisting in the assembly, installation, and maintenance of piping systems.
Followed safe work practices, which included fall protection and personal protective equipment.
Set sleeves or inserts to provide support for pipes.
Tested piping systems for leaks by increasing pressure in pipes and observing gauges attached to pipes for indication of leaks.
Carpenter Foreman
Thompson Construction Group Inc.
04.2022 - 01.2025
Mentored junior carpenters to develop their skills, ensuring a well-trained workforce for future projects.
Increased project efficiency by delegating tasks and supervising a team of carpenters.
Ensured compliance with building codes by thoroughly reviewing design plans before commencing construction tasks.
Reduced material waste by implementing accurate measurements, cutting techniques, and proper storage practices.
Maintained organized records of blueprints, plans, and specifications for easy access during the construction process.
Kept accurate records of materials used, employee timesheets, client issues and accident reports.
Observed all OSHA and corporate safety regulations and procedures to prevent mishaps and injuries on job sites.
Rebar Foreman
Associated Brigham Contractors
07.2017 - 03.2022
Expedited project completion times by developing efficient work schedules that maximized crew utilization while minimizing downtime between tasks.
Assisted in reducing labor costs through strategic planning of manpower allocation based on individual skill sets and project requirements.
Achieved consistent high-quality results through rigorous attention to detail in all aspects of rebar installation and reinforcement processes.
Improved project efficiency by effectively coordinating with other trades, ensuring timely delivery of materials and equipment.
Met with engineers to plan layouts and timeframes for jobs.
Poured and laid concrete for projects.
Leveled, smoothed, and finished surfaces of poured concrete for construction projects.
Installed rebar and molded expansion joints and edges for concrete projects.