Summary
Overview
Work History
Education
Skills
Timeline
Generic

Dustin Clark

Checotah,OK

Summary

Seasoned Pipeline Laborer bringing 10 years of experience in physically-challenging construction positions. Comfortable working in any weather and willing to take on any task. Well-versed in digging trenches, laying concrete and working with a multitude of different size and types of industrial piping.

Overview

10
10
years of professional experience

Work History

Pipeline Laborer

Associated Pipeline
07.2024 - Current
  • Contributed to successful project completion by maintaining clean and organized work areas.
  • Laid out materials for efficient project work.
  • Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
  • Supported team productivity by assisting with excavation, trenching, and backfilling activities as needed.
  • Ensured accurate placement of pipelines through careful measurement and alignment tasks.
  • Signaled equipment operators to align machinery.
  • Enhanced pipeline safety by conducting regular inspections and maintenance tasks.
  • Developed strong working relationships with colleagues, fostering a positive team environment conducive to achieving success on pipeline construction projects.
  • Followed correct reporting procedures for safety concerns and incidents.
  • Assisted in the installation and repair of various pipeline systems, resulting in fewer leaks and enhanced system performance.
  • Demonstrated versatility by supporting multiple aspects of pipeline construction, including welding, pipe bending, coating application, and hydrostatic testing procedures.
  • Reduced environmental impact by implementing best practices for erosion control and spill prevention measures.
  • Expanded skillset through continuous professional development opportunities such as attending trainings or obtaining relevant certifications related to the field.
  • Promoted a culture of safety awareness among crew members through participation in regular safety meetings and trainings sessions.
  • Minimized downtime during construction projects through proactive problem-solving skills in addressing potential issues before they escalated.
  • Assisted in the planning and execution of pipeline construction projects, ensuring that project goals were met or exceeded.
  • Facilitated clear communication between crew members to ensure smooth coordination of tasks throughout pipeline construction projects.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Cut and drilled holes in walls to permit passage of pipes.
  • Operated drill motors, grinders, chop saws, hack saws, and burning torches to perform tasks.
  • Fabricated piping pieces and components in line with design specifications for each system.
  • Measured, threaded, and cut materials to correct angles.
  • Filled pipe systems with water and air to determine location of leaks.
  • Planned pipe system layout, installation and repair according to specifications.
  • Read and interpreted blueprints and schematics to determine locations, quantities, and sizes of materials required.
  • Used clamps and brackets to attach pipes to walls, structures and fixtures.
  • Reviewed blueprints and project specifications to determine correct plumbing solutions.
  • Interpreted blueprints to determine locations, quantities, and sizes of materials required.

Pipeline Foreman

Precision Pipeline LLC
10.2017 - 06.2024
  • Streamlined communication between teams by establishing clear channels and protocols for information sharing.
  • Managed pipeline construction projects, ensuring timely completion and adherence to budget constraints.
  • Identified potential issues early on, enabling proactive solutions to minimize downtime or delays in project timelines.
  • Collaborated closely with engineers and other specialists during the design phase to optimize plans based on site-specific conditions and requirements.
  • Fostered a positive work environment, promoting teamwork and collaboration among staff members.
  • Oversaw the installation, repair, and maintenance of pipeline systems, ensuring optimal functionality at all times.
  • Reduced safety incidents through thorough employee training and consistent oversight of job sites.
  • Maintained high quality workmanship by enforcing strict adherence to industry standards and regulations.
  • Evaluated team performance regularly to identify areas for improvement and provide constructive feedback accordingly.
  • Handled conflict resolution effectively, addressing grievances in a timely manner to maintain a cohesive and productive work environment.
  • Mentored junior team members by providing guidance on best practices and sharing industry knowledge to promote professional development.
  • Conducted regular inspections of pipelines for signs of wear or damage, scheduling necessary repairs as needed.
  • Implemented innovative cost-saving measures without compromising on safety or quality of workmanship.
  • Developed comprehensive project plans outlining scope, schedule, budget, resources, risks, and contingencies for successful execution.
  • Coordinated with regulatory agencies to ensure compliance with all applicable laws and regulations throughout the duration of each project.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Directed projects according to schedule and quality demands.
  • Provided feedback to workers on job performance and safety procedures.
  • Created and implemented plans to maximize efficiency of workers.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Supervised training of new construction and extraction workers on safety practices and procedures.
  • Supported construction and extraction workers to facilitate timely completion of projects.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.
  • Documented construction and extraction workers' hours, wages and other pertinent information.

Pipeline Laborer

Primoris Services Corporation Rockford
10.2016 - 10.2017
  • Contributed to successful project completion by maintaining clean and organized work areas.
  • Laid out materials for efficient project work.
  • Optimized workflow efficiency by performing routine equipment checks, maintenance, and repairs as needed.
  • Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
  • Supported team productivity by assisting with excavation, trenching, and backfilling activities as needed.
  • Ensured accurate placement of pipelines through careful measurement and alignment tasks.
  • Signaled equipment operators to align machinery.
  • Enhanced pipeline safety by conducting regular inspections and maintenance tasks.
  • Developed strong working relationships with colleagues, fostering a positive team environment conducive to achieving success on pipeline construction projects.
  • Followed correct reporting procedures for safety concerns and incidents.
  • Assisted in the installation and repair of various pipeline systems, resulting in fewer leaks and enhanced system performance.
  • Demonstrated versatility by supporting multiple aspects of pipeline construction, including welding, pipe bending, coating application, and hydrostatic testing procedures.
  • Reduced environmental impact by implementing best practices for erosion control and spill prevention measures.
  • Expanded skillset through continuous professional development opportunities such as attending trainings or obtaining relevant certifications related to the field.
  • Promoted a culture of safety awareness among crew members through participation in regular safety meetings and trainings sessions.
  • Minimized downtime during construction projects through proactive problem-solving skills in addressing potential issues before they escalated.
  • Assisted in the planning and execution of pipeline construction projects, ensuring that project goals were met or exceeded.
  • Facilitated clear communication between crew members to ensure smooth coordination of tasks throughout pipeline construction projects.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Cut and drilled holes in walls to permit passage of pipes.
  • Operated drill motors, grinders, chop saws, hack saws, and burning torches to perform tasks.
  • Fabricated piping pieces and components in line with design specifications for each system.
  • Measured, threaded, and cut materials to correct angles.
  • Filled pipe systems with water and air to determine location of leaks.
  • Planned pipe system layout, installation and repair according to specifications.
  • Read and interpreted blueprints and schematics to determine locations, quantities, and sizes of materials required.
  • Used clamps and brackets to attach pipes to walls, structures and fixtures.
  • Reviewed blueprints and project specifications to determine correct plumbing solutions.
  • Interpreted blueprints to determine locations, quantities, and sizes of materials required.

Quality Control Inspector

Captive-Aire
02.2015 - 10.2016
  • Communicated with production team members about quality issues.
  • Inspected quality of products, taking note of functionality, appearance and other specifications.
  • Inspected incoming and outgoing materials for accuracy and quality.
  • Reported repeated issues to supervisors and other departments, collaborating to identify issue roots and rectify problems.
  • Performed visual inspections and non-destructive tests where appropriate.
  • Improved product quality by conducting thorough inspections and identifying defects in a timely manner.
  • Maintained compliance with industry regulations through meticulous record-keeping and documentation of inspection results.
  • Collaborated with production staff to establish and meet quality standards
  • Evaluated components and final products against quality standards and manufacturing specifications.
  • Completed precise measurements using special tools.
  • Participated in team meetings to discuss progress and results, providing ideas and suggestions for improvement.
  • Identified and documented quality discrepancies for management to develop resolutions.
  • Reduced product rejection rates by collaborating with production teams to address quality issues proactively.
  • Ensured the accuracy of measurement tools and equipment by performing regular calibration checks and maintenance.
  • Actively participated in regular audits to verify compliance with industry regulations and company policies, ensuring continued certification and enhanced credibility within the market.
  • Enhanced production efficiency by implementing standardized inspection processes and procedures.
  • Trained and mentored junior inspection staff and interns to apply best practices and comply with quality control guidelines and regulations.
  • Supported continuous improvement initiatives by analyzing inspection data and recommending process adjustments for optimal quality control.
  • Performed root cause analysis to identify and resolve defects, improving quality standards.
  • Performed root cause analysis on non-conforming products to identify areas for improvement and prevent future issues.
  • Streamlined the inspection process, resulting in quicker identification of defects and faster corrective actions.
  • Led cross-functional team efforts to troubleshoot and resolve complex quality issues, enhancing product integrity.
  • Reduced waste by implementing stricter quality control measures during manufacturing process.
  • Optimized product testing procedures, leading to more accurate detection of defects and inconsistencies.
  • Reduced return rates with proactive quality control measures and detailed product inspections prior to shipment.
  • Supported continuous improvement initiatives by providing insightful quality control data and analysis.
  • Maintained up-to-date knowledge of industry standards and regulatory requirements to ensure company compliance.
  • Streamlined inspection procedures to increase speed of quality checks without compromising on thoroughness.
  • Collaborated with production teams to identify root causes of quality issues, leading to significant improvements in product reliability.
  • Developed and maintained comprehensive quality documentation, facilitating easier compliance with regulatory standards.
  • Improved production processes with thorough analysis and feedback, leading to more efficient operations.
  • Examined products for imperfections and defects.
  • Monitored product quality at all stages of production process.
  • Followed standard operating procedures for inspections and tests.
  • Recorded inspection and test results on data sheets.
  • Checked color, shape, texture and grade of products and materials against established templates, charts, and samples.
  • Provided feedback to production team regarding product quality.
  • Trained other workers in inspection and testing procedures.
  • Operated and maintained testing equipment.
  • Followed safety protocols while handling hazardous materials.

Education

High School Diploma -

Midway Highschool
Council Hill, OK
05.2012

Skills

  • Hazards awareness
  • Teamwork and Communication
  • Pipe Laying Techniques
  • Trench digging experience
  • Pressure testing
  • Safety Procedures
  • Pipefitting
  • Layout planning
  • Blueprint Reading
  • Quality Control
  • Commercial pipefitting
  • Basic Carpentry
  • Reporting procedures
  • Training and mentoring
  • Pipe Insulation
  • Confined Space Entry
  • Excavation Safety
  • Hazardous Materials Handling
  • Project Management
  • Hydrostatic Testing
  • Compliance Management
  • Traffic Control
  • Policy and procedure implementation
  • Erosion Prevention
  • Quality Control Analysis
  • Environmental Compliance
  • Pipeline Coating Application
  • Surveying and Grading
  • Pump Station Construction
  • Teamwork and Collaboration
  • Problem-Solving
  • Skilled with both hand and power tools
  • Time Management
  • Hand and power tools
  • Attention to Detail
  • Problem-solving abilities
  • Piping installation
  • Multitasking
  • Power Tool Operation
  • Reliability
  • Excellent Communication
  • Organizational Skills
  • Active Listening
  • Installation and maintenance

Timeline

Pipeline Laborer

Associated Pipeline
07.2024 - Current

Pipeline Foreman

Precision Pipeline LLC
10.2017 - 06.2024

Pipeline Laborer

Primoris Services Corporation Rockford
10.2016 - 10.2017

Quality Control Inspector

Captive-Aire
02.2015 - 10.2016

High School Diploma -

Midway Highschool
Dustin Clark