
I started working a couple job sites in concrete when I was 12, became an official employee when I was 14. I worked in that field of work until I left when I was 19 to go work for Amazon for 9 months until I started working at amalgamated sugar. There I got a license for forklift and loader operator
Sort products into different slots and keep track of what was in each slot or each pod, layer was into a position where I picked products that were ordered from the slots and sort them into certain bins to where they need to go
Prepare the job site by laying down forms, along with measuring and sometimes sawing the forms, consistent to the perimeter of planned project. Sometimes demolition work required before prepping the job, for example, using skid steer to tear out trees or grass or even a jackhammer to tear out concrete itself. After site is prepped, Spread fresh concrete along the forms and perimeter filling the area. Flatten out by using specific tools like vibra strike, power trowel, or even a regular trowel. Making sure to keep some areas wet to help flatten and smoothen the surface of the concrete. After concrete had dried and hardened. We strip the foundation of the project by tearing the board off the concrete scraping little flakes of concrete off the board.
Concrete construction
Stock inventory