Summary
Overview
Work History
Education
Skills
Certification
Timeline
background-images

Dylan George

Bowdon,GA

Summary

Adaptable Millwright with safety-driven mentality to both build and dismantle machinery. Hard worker with great personality and over 5 years of interpreting drawings and specifications. Focused worker promoting excellent attendance record and knowledgeable in equipment planning and analysis. Proven track record of enhancing equipment reliability and optimizing performance through precision alignment and effective teamwork. Committed to safety compliance and delivering high-quality results, ensuring minimal downtime and maximum productivity. Competent Pipefitter offering a wealth of experience in fabricating and installing plumbing systems. Excited to take next career step with your company. As well as construction professional with extensive experience in framing and building structures. Proven ability to read blueprints accurately and execute projects efficiently, ensuring quality and safety at all times. Known for exceptional teamwork and adaptability, consistently meeting project deadlines and client expectations.

Proven ability to troubleshoot and repair emergency issues. Works well both independently and as part of team.

Overview

14
14
years of professional experience
1
1
Certification

Work History

Millwright/Plumber Pipefitter

Addison Smith Mechanical Contractor
02.2023 - 03.2025
  • Adeptly utilized a range of hand tools, power tools, and precision measuring instruments to ensure accurate workmanship in all tasks.
  • Adhered to all workplace safety policies, regulations and compliances.
  • Conducted comprehensive inspections of machinery to identify potential problems and ensure optimal performance.
  • Aligned and leveled machines using precision measuring instruments to avoid unnecessary wear and tear.
  • Improved workplace safety with diligent adherence to protocols, lockout/tagout procedures, and hazard identification.
  • Enhanced equipment reliability by performing regular maintenance and repairs on industrial machinery.
  • Assisted in the planning and execution of major shutdowns, ensuring timely completion of critical tasks within budget constraints.
  • Disassembled machinery parts and categorized properly before moving to storage.
  • Mentored junior millwrights as they acquired new skills and gained familiarity with complex industrial machinery operations.
  • Collaborated with cross-functional teams to implement efficient systems and processes in the facility.
  • Optimized machinery performance by customizing and adjusting settings to match production requirements.
  • Coordinated with manufacturers to secure necessary parts for emergency repairs, minimizing operational impact.
  • Troubleshot electrical and mechanical issues, restoring equipment functionality with minimal downtime.
  • Performed routine inspections and maintenance to optimize machinery performance.
  • Installed, repaired and maintained automated systems in accordance with safety regulations.
  • Positioned steel beams to support bedplates of machines and equipment using blueprints and schematic drawings.
  • Maximized efficiency in new construction sites by pre-fabricating piping assemblies off-site before installation at the job site.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Installed valves, hangers, supports, and flanges inside piping systems.
  • Filled pipe systems with water and air to determine location of leaks.
  • Diagnosed and repaired complex machinery, leading to reduced downtime and increased production efficiency.
  • Cut and drilled holes in walls to permit passage of pipes.
  • Planned pipe system layout, installation and repair according to specifications.
  • Read and interpreted blueprints and schematics to determine locations, quantities, and sizes of materials required.

Millwright

Accuwright Mechanical
10.2021 - 02.2023
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Used hoisting and rigging equipment to move heavy machinery and equipment.
  • Made repairs and modified equipment by welding, soldering and brazing to avoid production delays.
  • Operated machine tools to fabricate parts during overhaul, maintenance, or setup of machineries.
  • Read and interpreted blueprints and schematics to understand machinery design and layout.
  • Created durable and long-lasting structures to withstand industrial environment demands.
  • Diagnosed and repaired complex machinery, leading to reduced downtime and increased production efficiency.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Threaded pipes using piping machines.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Utilized specialized tools and equipment for precise pipefitting processes, ensuring optimal results for each project.

Remodeler

AC Coastal
09.2019 - 10.2021
  • Utilized advanced tools and equipment to complete complex remodeling projects with precision and speed.
  • Maintained safe work environments by adhering to proper safety protocols and conducting regular inspections of job sites.
  • Delivered top-notch work for all types of remodels that enhanced both appearance and functionality of the space.
  • Continuously educated myself on industry trends and best practices to provide clients with innovative solutions and stay ahead of the competition.
  • Managed multiple projects simultaneously, achieving on-time delivery and maintaining excellent customer satisfaction.
  • Provided outstanding customer service by addressing client concerns promptly and maintaining open lines of communication throughout each remodeling project.
  • Coordinated subcontractor schedules to ensure seamless integration into overall project timelines without delays or conflicts.
  • Read and interpreted all blueprints and schematics for multiple projects.

Heavy Equipment Operator

Vulcan Materials
11.2018 - 09.2019
  • Operated range of heavy equipment on regular basis with advanced skill.
  • Operated excavators, bulldozers and dump trucks to transport heavy materials, practicing safety measures.
  • Adapted quickly to changing project requirements or unexpected obstacles encountered during the course of work assignments.
  • Demonstrated versatility in skillset by operating multiple types of heavy machinery to accommodate project needs.
  • Optimized machine performance with regular cleaning, lubrication, and maintenance checks in accordance with manufacturer guidelines.

Builder \ Pre-assemble

Superior International
08.2017 - 11.2018


  • Maintained professional relationships with clients throughout the duration of each project, keeping them informed on progress updates and addressing any concerns as needed.
  • Trained new staff on proper building techniques, site regulations and safety protocols.
  • Interpreted blueprints accurately, building structures to exact specifications.
  • Communicating with engineers alongside designers to ensure accurate and quality builds were being performed
  • Delivered high-quality projects on time and within budget, consistently meeting client expectations and fostering long-term relationships.
  • Optimized resource allocation for various projects, ensuring cost-effectiveness while maintaining quality standards.


Installer

SKB Serenity Kitchen & Bath
12.2014 - 08.2017
  • Laid out materials and system components to prepare for installation.
  • Operated tools, equipment, and machinery according to safety standards.
  • Installed complete systems at new residential and business construction sites.
  • Enhanced customer satisfaction by providing timely and accurate installations.
  • Troubleshot issues during cabinet installations, implementing solutions swiftly to minimize delays in project timelines.
  • Enhanced customer satisfaction by efficiently installing high-quality cabinets in residential and commercial spaces.
  • Handled complex custom cabinetry installations with exceptional attention-to-detail, resulting in consistently high-quality outcomes that exceeded client expectations.
  • Preserved clean workspaces throughout all stages of the installation process, minimizing disruptions for clients'' homes or businesses.
  • Regularly updated clients on project progress, addressing any concerns or inquiries professionally and promptly.
  • Provided knowledgeable recommendations on cabinet materials, styles, and finishes to meet client preferences and budgets.

Framer

Nicholson Construction
05.2011 - 11.2014
  • Maintained a clean work environment by organizing materials and removing debris at the end of each day.
  • Accurately and safely installed wall, roof and floor structures according to blueprints, customer requests, and available inventories.
  • Enhanced overall project efficiency by accurately measuring and cutting materials for framing projects.
  • Cut and joined wood, using precise measurements and proper techniques to create frames of different sizes
  • Assisted in the completion of complex framing projects by providing timely support to fellow team members.
  • Improved client satisfaction by consistently completing high-quality framing work within designated timeframes.

Education

High School Diploma -

Open Camps High School
Carrollton, GA
05-2011

No Degree - Welding / Heavy Equipment Operations

West Georgia Technical College
Carrollton, GA
08-2012

Skills

  • Safety compliance
  • Equipment installation
  • Heavy lifting
  • Fabrication
  • Preventive Maintenance
  • Hydraulic systems
  • Safety procedures
  • Mechanical troubleshooting
  • Parts installation
  • Machinery maintenance
  • Conveyor systems
  • Blueprint reading
  • Equipment Repair
  • Equipment troubleshooting
  • Coupling installation
  • Equipment assembly
  • Work planning
  • Power tools operation
  • Shaft alignment
  • Rigging techniques
  • Mechanical tools
  • Blueprint interpretation
  • Power tool operation
  • Equipment inspection
  • Equipment preparation
  • Industrial mechanics
  • Valve maintenance
  • Equipment set up
  • Productivity and safety improvement
  • Torque specifications
  • Structural welding
  • Lubrication procedures
  • Precision alignment
  • Equipment rebuilding
  • Fastener selection
  • Soldering
  • Motor alignment
  • Machine repair
  • Mechanical alignment
  • Diagram and schematic reading
  • Mechanical tool usage
  • Conveyor assembly
  • Seal replacement
  • Issue and problem resolution
  • Fusing and cutting
  • Hand tools proficiency
  • Machinery dismantling
  • Team building
  • Teamwork and collaboration
  • Problem-solving
  • Time management
  • Attention to detail
  • Multitasking
  • Reliability
  • Excellent communication
  • Critical thinking
  • Organizational skills
  • Material handling
  • Industrial safety
  • Active listening
  • Adaptability and flexibility

Certification

Safety Training

  • Proper PPE
  • Fall protection
  • Lockout/Tagout
  • Confined space
  • Hazardous material
  • Overhead powerline safety
  • Electrical safety
  • Fire safety
  • Equipment safety
  • Ladder safety
  • Etc.

Trained on multiple types of Forklifts

  • All fuel types
  • Electrical
  • Rough terrain
  • Telehandler
  • Versa-lift
  • Articulating

Trained on multiple types of Aerial-lifts

  • All fuel types
  • Electrical
  • Scissor
  • Telescopic
  • Cherry pickers
  • Boom
  • Articulated knuckle booms

Trained on multiple types of Heavy Equipment

  • Broderson/Carrydeck
  • Boom truck
  • Excavators
  • Loaders
  • Backhoe
  • Skid steer
  • Dump hauler
  • Articulated hauler



Timeline

Millwright/Plumber Pipefitter

Addison Smith Mechanical Contractor
02.2023 - 03.2025

Millwright

Accuwright Mechanical
10.2021 - 02.2023

Remodeler

AC Coastal
09.2019 - 10.2021

Heavy Equipment Operator

Vulcan Materials
11.2018 - 09.2019

Builder \ Pre-assemble

Superior International
08.2017 - 11.2018

Installer

SKB Serenity Kitchen & Bath
12.2014 - 08.2017

Framer

Nicholson Construction
05.2011 - 11.2014

High School Diploma -

Open Camps High School

No Degree - Welding / Heavy Equipment Operations

West Georgia Technical College
Dylan George