Experienced professional with a robust work ethic and a demonstrated history of efficiently executing tasks in diverse environments. Proficient in manual labor, equipment operation, building construction, maintenance, and remodeling. Demonstrates a heightened focus on safety and possesses the ability to adapt to varying work settings. Eager to join a dynamic team and deliver a positive impact.
Overview
23
23
years of professional experience
Work History
Painter
R & P Painting and Remodeling
Cincinnati, OH
01.2000 - 04.2023
Performed surface preparations by washing, scraping, sanding, and filling in holes.
Executed repairs on wall defects by patching holes and scrapes during project initiation.
Delivered knowledgeable guidance on the most appropriate products to utilize in diverse work assignments.
Implemented measures to guarantee adequate ventilation when using solvents or oil-based paints.
Removed old wall coverings before applying new ones.
Ensured a comprehensive inventory of paint equipment and supplies through consistent monitoring of product levels.
Conducted site inspections to assess measurements, plan work layout, and estimate necessary materials.
Utilized airless spray equipment and motorized lifts to complete tasks effectively and safely.
Enhanced the efficiency of painting projects through the removal of items like pictures, door knobs, and electric switch covers.
Achieved maximum efficiency through precise calibration of spray gun nozzles, resulting in reduced paint material wastage.
Utilized needle guns, surface grinders, and wire wheels to prepare both painted and unpainted surfaces for painting applications.
Safely stored and handled materials in accordance with OSHA and Hazmat procedures.
Provided clients with documented progress and estimated time of completion.
Steel Cutter
Accurate Equipment
Cincinnati, OH
Utilized diverse electrodes to perform shielded metal arc welding on various structural steel components.
Safely installed anchor bolts, steel plates, and door sills while incorporating additional fixtures onto masonry walls for enhanced functionality.
Determined the best tools for specific projects taking into account various factors including material type, size, and shape.
Analyzed blueprints and job orders to determine accurate product specifications and tooling instructions.
Maintained and preserved equipment by conducting regular maintenance tasks like lubricating mechanisms and replacing damaged components.
Utilized cutting torches, mechanical shears, and other metal-cutting tools proficiently to achieve precision while cutting steel stock.
Proficiently handled the setup and operation of different fabricating machines like brakes, rolls, shears, flame cutters, grinders and drill presses.
Aligned weld machines to accurate specifications, reducing waste and enhancing efficiency.
Remodeling Carpenter
R & P Painting and Remodeling
Cincinnati , OH
Installed various types of roofing materials including shingles, shakes, asphalt, and metal roofing systems.
Performed evaluations on existing structures before initiating renovation work to pinpoint sections requiring repairs or replacements.
Built wood frames for walls, ceilings, and floors with precision using quality materials.
Executed installation of cabinets, doors, windows, and interior fixtures precisely as per blueprints and specifications.
Supported remodeling projects by assisting in the removal of pre-existing structures.
Worked hand in hand with contractors to successfully deliver projects within allocated timeframe and budget constraints.
Consistently complied with safety regulations during onsite projects.
Developed layout plans for construction projects based on building codes and client preferences.
Interpreted blueprints, sketches, and building plans to develop project layouts with precise dimensions and necessary materials.
Completed installation of various building components including windows, trim, and cabinetry both independently and collaboratively to meet project deadlines.
Performed inspections, diagnosed issues, and implemented necessary adjustments to finalize projects in compliance with specifications.
Erected scaffolding for the purpose of assembling above-ground structures.