Summary
Overview
Work History
Education
Skills
Timeline
Generic

Ed Dumont

Baytown,Tx

Summary

LYB Machine shop team leader, focused on increasing production, minimizing equipment downtime and costs and maximizing overall plant efficiency. Possesses strong maintenance aptitude, Strong preventive maintenance background includes all rotating, high-pressure valves, high pressure cylinders and fixed equipment. Extensive training in Oil refineries and Chemical plant operations. Maintenance leader accomplished in supervising daily maintenance operations for mechanical equipment. Experienced in LYB MREP repairable items, contacting and follow up with vendors and LYB stores to keep critical parts stocked LYB Polymers and Q1 area. Focused leader committed to company core values, driving results and exceeding expectations.

Overview

19
19
years of professional experience

Work History

Millwright

LyondellBasell
08.2019 - Current
  • Performed preventive maintenance on equipment and machinery on regular basis to reduce downtime
  • Inspected and examined all machinery and equipment to detect malfunctions or irregularities
  • Kept detailed and accurate maintenance reports and documentation of progress
  • Operated machine tools to fabricate parts during overhaul, maintenance or setup of machineries
  • Used laser alignment to quickly troubleshoot machinery problems and suggest accurate repairs
  • Improved workplace safety with diligent adherence to protocols, lockout/tagout procedures, and hazard identification.
  • Coordinated with vendors and suppliers to ensure timely delivery of spare parts, minimizing delays in repairs.
  • Managed inventory levels effectively, ensuring optimal stock availability for essential maintenance items.
  • Improved equipment uptime by diligently scheduling and coordinating preventive maintenance tasks.
  • Oversaw equipment and parts inventory and tracked shipments to reduce stock shortages.

Maintenance Millwright

Universal Plant Services
10.2017 - 11.2017
  • Installed machinery, equipment and new and replacement parts
  • Transferred tools, parts, equipment and supplies to and from work stations
  • Referred to blueprints, repair manuals and parts catalogs to diagnose and repair equipment
  • Followed a routine maintenance checklist
  • Maintained shop, company equipment and inventory
  • Completed daily inventories of supplies and equipment
  • Operated precision measuring instruments and electrical and electronic testing devices ISO 9000
  • Recorded type and cost of maintenance and repair work
  • Followed up on all outstanding service requests
  • Created a database of all equipment models and serial Numbers
  • Lubricated shafts, bearings and machinery gears
  • Operated hand tools to adjust functional parts of devices and control instruments
  • Maintained and repaired tools, equipment and machines
  • Frequently diagnosed mechanical problems and determined how to correct them
  • Inspected drives, motors and belts
  • Instructed team members on maintenance policies and procedures
  • Permit recipient
  • Follow all Safety rules

Maintenance Millwright

Universal Plant Services
08.2017 - 10.2017
  • Installed machinery, equipment and new and replacement parts
  • Transferred tools, parts, equipment and supplies to and from work stations
  • Referred to blueprints, repair manuals and parts catalogs to diagnose and repair equipment
  • Followed a routine maintenance checklist
  • Maintained shop, company equipment and inventory
  • Operated precision measuring instruments and electrical and electronic testing devices
  • Followed all Plant rules and procedures to perform all jobs safely. Using LOTO and filling out job hazard analysis cards


  • Followed up on all outstanding service requests
  • Lubricated shafts, bearings and machinery gears
  • Operated hand tools to adjust functional parts of devices and control instruments

Rotating Equipment Planner

KAP Project Services
07.2017 - 08.2017
    Rotating equipment planner for KAP at Chevron Cedar bayou.
  • Followed routine and preventative maintenance checklists
  • Scheduled contractors for projects and created bill of materials to complete projects
  • Referred to blueprints, repair manuals and parts catalogs to diagnose and repair equipment

Industrial Mechanic Millwright

Oxy
09.2016 - 06.2017

Senior Millwright to run PM activities and shutdown as well.

I had a Project management roll over several pieces of Equipment.

Cooling towers ,Mixers with gear boxes, steam turbines  and pumps.

  • Repaired and calibrated equipment using precision measuring instruments
  • Diagnosed mechanical problems and determined the best ways to correct them
  • Inspected drives, motors and belts
  • Followed routine and preventative maintenance checklists
  • Repaired defective equipment parts
  • Operated tools, including hoists, saws and drills
  • Referenced blueprints, repair manuals and parts catalogs for complex repairs
  • Conducted preventive and corrective maintenance on bearings, pumps, shafts and fans
  • Documented all maintenance and repairs

Shutdown Planner

DuPont
02.2006 - 07.2015

    Former Shutdown and Daily planner for DuPont , I created work orders and purchase all parts necessary to  run 5 different business units with maximum up time. I coordinate service repairs with many different vendors to keep plant equipment and all critical components maintained . SAP Experience with Microsoft Word , Excell , Power point, NEXUS ,  Outlook and Lotus notes. Currently using Prometheus to create work Permits and some scheduling.
     Journeyman Millwright with 10 years experience , maintenance Foreman for Universal Plant Services at Exxon BOP for 7 years , we serviced and over hauled  all rotating equipment  (Turbines , pumps, gearboxes , compressors , conveyors , motor , fans and new construction Start up , Preventive & Reliability Maintenance )
    Nuclear Tech. rebuilding Control rod drives and  assist refueling Nuclear Power plants in the US. 4 years experience as a Fitter / Welder stick and Mig. work in fabrication shops building Heat ex changers etc.

  • Followed routine and preventative maintenance checklists
  • Diagnosed mechanical problems and determined the best ways to correct them
  • Referenced blueprints, repair manuals and parts catalogs for complex repairs
  • Documented all maintenance and repairs
  • Scheduled contractors for projects and distributed work orders
  • Managed tool shop, monitored stock levels and ordered parts

Education

High Pressure Valves And Cylinder Overhaul

On The Job Training LYB Lapping Room / Machine Sho
LyondellBasell , LaPorte Tx.

GED - Millwright

Millwrights Apprenticeship
2000

Viberation Analyist ISO Cat.1 - Viberation

Technical Associates
Charlot N.C.
2016

Skills

  • Safety first, 29 years of on-the-job experience with zero safety incidents
  • Shutdown planner and Daily planner 10 yrs With DuPont
  • Initiated Reliability & Preventive Maintenance meeting every Monday at LYB lapping room
  • SAP , Word, Excell, Outlook, Lotus Notes, and Nexus computer skills
  • Member of Safety Solutions team at DuPont
  • Millwright for LYB, Oxy VCM, Arkema, and DuPont
  • Journeyman Millwright with 29 plus years' experience working in Petrochemical field
  • NCCER Millwright
  • Vibration Analyst ISO cat1
  • Kizan team member helped to create work permits, helped to establish work role responsibilities
  • Implement Preventive maintenance Lube it program at DuPont , and currently work on Thickness minimums for plant Piping and Equipment
  • Planning 5 year look ahead for plant equipment reliability
  • Gas plant knowledge: I have worked for LYB, Arkema, OXY and DuPont Contractor; Shell, Valero, British Petroleum , Texas Petrochem ,Lyondell Citgo, Oxy, Chevron and Exxon Mobil just to name a few , of the plants that I have worked in
  • Knowledge of nuclear power plants , Nuclear Tech experience rebuilding Control rod drives and assist refueling Nuclear power plants across the US
  • 4 plus year experience as a fitter / Welder building heat ex changers etc
  • Current TWIC card 09-2028
  • Requisitions
  • Purchase orders
  • Work orders
  • Job Plan Library
  • Pipe codes
  • Valve codes
  • Red service
  • SDS /MSDS
  • Chlorine / Oxygen clean valves and piping
  • Critical Components: Relief valves,Flame arrestors and Emergency vents
  • Preventive & Reliability Maintenance
  • Cross-training familiarity
  • Quality assurance
  • Excellent hand-eye coordination
  • Deadline-driven
  • Strong leader
  • Process improvements
  • Gas , Chemical , Wastewater and Plastics plant knowledge
  • OSHA 10 Safety Course
  • Safety compliance

Timeline

Millwright

LyondellBasell
08.2019 - Current

Maintenance Millwright

Universal Plant Services
10.2017 - 11.2017

Maintenance Millwright

Universal Plant Services
08.2017 - 10.2017

Rotating Equipment Planner

KAP Project Services
07.2017 - 08.2017

Industrial Mechanic Millwright

Oxy
09.2016 - 06.2017

Shutdown Planner

DuPont
02.2006 - 07.2015

Viberation Analyist ISO Cat.1 - Viberation

Technical Associates

High Pressure Valves And Cylinder Overhaul

On The Job Training LYB Lapping Room / Machine Sho

GED - Millwright

Millwrights Apprenticeship
Ed Dumont