Summary
Overview
Work History
Education
Skills
Accomplishments
Languages
Timeline
OfficeManager

Edgar Pineda

Marietta GA,GA

Summary

Dynamic Drywall Finisher Foreman with a proven track record at Annying Johnson, excelling in level 5 finishing and customer service. Recognized for enhancing project efficiency and reducing material waste through meticulous planning and strong leadership. Committed to upholding safety protocols while delivering high-quality craftsmanship that consistently exceeds client expectations.

While working as a superintendent assistant I achieved:

• Improving Job Site Efficiency – Assisted in coordinating schedules, ensuring materials arrived on time, and reducing project delays.

• Enhancing Communication – Served as a key liaison between subcontractors, workers, and the superintendent, leading to smoother operations.

• Ensuring Safety Compliance – Helped enforce OSHA regulations and company safety protocols, reducing workplace incidents.

• Supporting Quality Control – Conducted site inspections and assisted in resolving issues before they became costly rework.

• Boosting Team Productivity – Assisted in organizing workflows and ensuring crews had the necessary resources to stay on track.

• Documentation & Reporting – Maintained accurate logs, progress reports, and subcontractor coordination to keep projects on schedule.

Overview

2026
2026
years of professional experience

Work History

Drywall Finisher Foreman

Annying Johnson
  • Applied tape to seal joints by embedding into sealing compound.
  • Served as a reliable team member, regularly collaborating with other finishers and construction professionals to achieve shared goals and meet deadlines.
  • Measured and marked cutting lines on drywall for lengths, heights and penetrations.
  • Removed damaged drywall and wallpaper to prepare for new installations.
  • Increased job efficiency with mastery of various hand tools and power tools, such as trowels, joint knives, and sanders.
  • Optimized productivity levels with proper maintenance of tools and equipment for uninterrupted work flow.
  • Achieved smooth and consistent wall surfaces by applying drywall compound and sanding.
  • Collaborated with construction teams to prioritize tasks, ensuring efficient workflow and meeting deadlines.
  • Enhanced customer satisfaction with meticulous attention to detail, resulting in high-quality finishes.
  • Prepared work area, tools and equipment for job site.
  • Received consistent excellent feedback on work quality and customer service.
  • Maintained a safe working environment by adhering to safety protocols and properly disposing of debris.
  • Minimized errors during installations through careful interpretation of blueprints, sketches or verbal instructions from supervisors or clients.
  • Ensured long-lasting quality workmanship by consistently inspecting finished surfaces for defects or inconsistencies before final approvals.
  • Streamlined the repair process for damaged walls by expertly patching holes and cracks with minimal disruption.
  • Inspected surfaces to evaluate quality and applied extra attention to fill in holes and rectify errors.
  • Upheld strict adherence to building codes and regulations while executing all tasks related to drywall finishing.
  • Applied sealing compound over cracks, holes, and nail heads using trowels, broad-knives or spatulas.
  • Ensured timely project completion by efficiently hanging and finishing drywalls in residential and commercial buildings.
  • Delivered superior results through precise application of texture finishes using brushes, rollers, or spray equipment.
  • Completed installation of drywall sheets on commercial and residential properties.
  • Demonstrated versatility in handling various types of materials such as gypsum board, cement board or fiberglass-reinforced panels during installation processes.
  • Delivered exceptional customer service, addressing client concerns promptly and professionally to maintain positive relationships.
  • Assisted in the preparation of work areas prior to starting a project – clearing debris, covering floors, removing fixtures as needed.
  • Supported team members during installations by effectively communicating progress updates and addressing potential issues proactively.
  • Reduced material waste by accurately measuring, cutting, and fitting drywall panels to specific dimensions.
  • Contributed to cost-effective projects by skillfully determining material requirements based on blueprints or specifications.
  • Maximized project success by providing accurate estimates for labor and materials, ensuring budgetary constraints were met.
  • Cut and hung drywall on walls and ceilings, taping and finishing joints and corners.
  • Screwed metal and wooden studs into frames.
  • Read and interpreted schematics and blueprints to lay tiles and drywall in correct places.
  • Cut and installed decorative framing and trim.
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Checked equipment to determine if maintenance was required.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Enhanced team productivity by providing clear direction, setting expectations, and offering constructive feedback.
  • Conducted thorough quality control checks to ensure high standards of workmanship across all projects.
  • Developed strong relationships with clients, subcontractors, and suppliers, fostering open communication channels for smooth project execution.
  • Adapted workflows in response to changing environmental conditions or unexpected challenges encountered during construction activities.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Collaborated with project managers in planning stages, advising on schedule adjustments and potential obstacles.
  • Monitored progress against established benchmarks, adjusting strategies as necessary to meet targets consistently.
  • Raised overall crew proficiency with ongoing skill development initiatives targeting areas identified for improvement.
  • Provided comprehensive training for new employees, ensuring their rapid integration into the team dynamic.
  • Successfully mitigated risks associated with complex projects by conducting thorough risk assessments and implementing appropriate contingency plans.
  • Managed equipment maintenance schedules to minimize downtime due to mechanical failure or repairs.
  • Implemented efficient work processes to boost overall productivity while reducing costs.
  • Championed company values through consistent modeling of ethical behavior and adherence to corporate policies.
  • Optimized resource utilization for cost savings, carefully monitoring material usage and labor allocations.
  • Assisted in the recruitment process for new team members, selecting candidates who demonstrated aptitude for success within the organization.
  • Facilitated seamless handovers between shifts by maintaining clear documentation of completed tasks and outstanding items requiring attention.
  • Boosted operational efficiency, redesigning processes to eliminate bottlenecks and streamline tasks.
  • Maintained high levels of workforce morale and engagement, organizing team-building activities and providing regular feedback.
  • Facilitated smooth project handovers, compiling comprehensive documentation and conducting detailed briefings.
  • Ensured project milestones were met, overseeing scheduling and execution of construction phases.
  • Achieved deadlines consistently, planning resources effectively and adjusting priorities as needed.
  • Streamlined communication between departments, establishing clear channels and protocols.
  • Optimized equipment usage, scheduling regular maintenance and updates to prevent downtime.
  • Ensured compliance with all regulatory requirements, conducting thorough audits and making necessary adjustments.
  • Enhanced team productivity by coordinating daily tasks and optimizing workflows.
  • Developed robust quality control system, significantly reducing rework and customer complaints.
  • Negotiated with suppliers to secure materials at more favorable terms, impacting budget positively.
  • Strengthened vendor relationships, ensuring consistent supply and quality of materials.
  • Elevated safety standards, conducting regular training sessions and safety audits.
  • Enhanced team skills with targeted training programs, addressing gaps and fostering professional development.
  • Mitigated risk, identifying potential issues early and developing contingency plans.
  • Achieved recognition for outstanding project management, delivering projects that consistently met all time, budget, and quality targets.
  • Reduced material waste significantly, implementing stringent inventory management and usage tracking systems.
  • Fostered culture of continuous improvement, leading by example and encouraging innovative solutions.
  • Promoted innovation, encouraging adoption of new technologies and methods to improve project outcomes.
  • Improved client satisfaction with meticulous oversight of project requirements and quality standards.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Directed projects according to schedule and quality demands.
  • Provided feedback to workers on job performance and safety procedures.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Developed and maintained positive relationships with clients and other stakeholders.
  • Created and implemented plans to maximize efficiency of workers.
  • Documented construction and extraction workers' hours, wages and other pertinent information.
  • Sourced suppliers and purchased necessary materials for work.
  • Supported construction and extraction workers to facilitate timely completion of projects.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Supervised training of new construction and extraction workers on safety practices and procedures.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Devised and implemented safety protocols to reduce risks on construction and extraction sites.
  • Communicated with stakeholders on job milestones.
  • Assisted in recruiting and hiring new construction and extraction workers.

Drywall Foreman

Ultra Drywall
03.2025 - Current

Drywall Foreman

M.o Drywall
05.2024 - 03.2025
  • Ensured compliance with local building codes and regulations through consistent application of industry best practices during all phases of drywall installation and repair work.
  • Maintained detailed project records, enabling accurate tracking of progress, materials usage, and labor hours for efficient reporting purposes.
  • Collaborated closely with other trades professionals to ensure seamless integration of drywall systems within various construction projects.
  • Managed budgets effectively through diligent tracking of project expenses and labor costs, ensuring financial targets were met or exceeded.
  • Provided accurate estimates for clients based on detailed assessments of the required scope of work related to drywall installation or repairs.
  • Resolved project issues promptly through effective communication with clients, architects, and engineers, ensuring minimal delays in project timelines.
  • Increased client satisfaction by ensuring timely completion of projects while maintaining high-quality workmanship standards.
  • Coordinated subcontractor schedules as necessary to minimize disruptions during ongoing installations or repair work in active facilities or homes.
  • Evaluated job site conditions before commencing work to identify potential challenges or hazards requiring mitigation strategies for successful project completion.
  • Maintained open lines of communication with clients, providing regular updates on project status and addressing any concerns as they arose.
  • Boosted team morale with strong leadership skills, promoting a positive working environment conducive to high-quality results.
  • Implemented quality control measures throughout each phase of the project lifecycle to maintain exceptional craftsmanship standards at all times.
  • Adapted quickly to changing project requirements or unforeseen obstacles while maintaining focus on achieving desired outcomes within established timeframes.
  • Enhanced project efficiency by effectively managing drywall installation and repair tasks for commercial and residential projects.
  • Ensured team adherence to company policies and procedures, reinforcing a culture of professionalism and accountability within the workforce.
  • Reduced material waste by implementing a strict inventory control system, resulting in cost savings for the company.
  • Mentored junior team members to enhance their skills, contributing to overall workforce development and improved performance.
  • Continually sought opportunities for professional growth by attending seminars, workshops, and industry conferences to stay current on advances in drywall technology and techniques.
  • Streamlined workflow processes for increased productivity with thorough planning, scheduling, and resource allocation.
  • Improved team safety by conducting regular on-site inspections and enforcing adherence to safety protocols and guidelines.
  • Installed drywall for residential and commercial projects with consistent attention to quality and safety.
  • Prepared work area, tools and equipment for job site.
  • Measured and marked cutting lines on drywall for lengths, heights and penetrations.
  • Finished and trimmed drywall with professional-level quality.
  • Completed installation of drywall sheets on commercial and residential properties.
  • Removed and replaced damaged drywall to complete repair and restoration projects.
  • Achieved accurate installations using proper measurements and allocations of drywall material.
  • Used diverse variety of tools and equipment for safe installation of drywall.
  • Prepared materials and set up equipment and supplies to support seamless drywall installation.
  • Applied skills in taping, sanding and finishing drywall to meet project specifications.
  • Promoted use of proper PPE and safety equipment to safeguard teams and equipment.
  • Received consistent excellent feedback on work quality and customer service.
  • Achieved precise installation requirements by cutting and fitting drywall to accommodate corners and edges.
  • Inspected surfaces to evaluate quality and applied extra attention to fill in holes and rectify errors.
  • Mixed, matched and applied diverse textures to achieve quality finishes.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Directed projects according to schedule and quality demands.
  • Provided feedback to workers on job performance and safety procedures.
  • Developed and maintained positive relationships with clients and other stakeholders.
  • Created and implemented plans to maximize efficiency of workers.
  • Sourced suppliers and purchased necessary materials for work.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Supervised training of new construction and extraction workers on safety practices and procedures.
  • Supported construction and extraction workers to facilitate timely completion of projects.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.
  • Documented construction and extraction workers' hours, wages and other pertinent information.
  • Devised and implemented safety protocols to reduce risks on construction and extraction sites.
  • Assisted in recruiting and hiring new construction and extraction workers.
  • Communicated with stakeholders on job milestones.

Assistant Construction Superintendent

Segars Group
07.2020 - 03.2023
  • Collaborated with the superintendent to develop comprehensive plans for each phase of construction, ensuring smooth transitions between stages.
  • Maintained a clean and organized job site by enforcing safety standards, waste disposal procedures, and housekeeping practices.
  • Reduced construction delays by proactively addressing potential issues and providing solutions for unforeseen challenges.
  • Enhanced project efficiency by coordinating with subcontractors, architects, and engineers to ensure timely completion of tasks.
  • Supported quality assurance efforts through thorough inspection of completed work before final sign-off from inspectors or clients.
  • Facilitated clear communication among team members by conducting regular meetings to discuss project updates and address concerns.
  • Streamlined project documentation processes by maintaining organized files and utilizing digital platforms to share information with relevant parties.
  • Developed contingency plans for unexpected situations or events that could impact the timeline or budget of ongoing projects.
  • Participated in pre-construction meetings to review design documents, identify potential issues, and establish expectations for all parties involved.
  • Fostered a culture of continuous improvement on job sites by seeking feedback from team members, implementing best practices, and staying up-to-date with industry trends.
  • Assisted in the selection of subcontractors based on their qualifications, experience, pricing proposals, and overall fit for the project requirements.
  • Improved site safety by conducting regular inspections, identifying hazards, and implementing corrective actions.
  • Contributed to successful project completion by preparing daily reports, monitoring progress, and updating schedules as needed.
  • Supported cost control efforts by tracking materials usage and maintaining detailed records of labor hours and expenses.
  • Ensured compliance with local building codes and regulations through diligent attention to detail during inspections and adherence to permit requirements.
  • Enhanced team morale by recognizing individual achievements, promoting collaboration among crew members, and creating an inclusive work environment.
  • Aided in the resolution of conflicts among subcontractors or other parties involved in the project, fostering a cooperative work environment.
  • Strengthened relationships with clients by regularly providing updates on construction progress and addressing any questions or concerns they had.
  • Assisted in achieving project milestones through close supervision of on-site activities and effective communication with team members.
  • Assisted in the development of project budgets and schedules by gathering necessary information and providing accurate estimates for labor, materials, and equipment costs.
  • Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.
  • Tracked project costs and other financial metrics to maximize profitability.
  • Monitored construction sites for compliance with safety regulations and adherence to standards.
  • Developed and implemented construction plans according to client specifications and expectations.
  • Coordinated with site personnel, clients and local government officials to achieve on-time project delivery.
  • Established and maintained relationships with vendors to source affordable and high quality materials and equipment for construction projects.
  • Negotiated labor contracts with general contractors and subcontractors.
  • Conducted critical pre-installation conferences with general contractors, subcontractors, consultants, and manufacturer's representatives.
  • Prepared detailed project estimates and reports for management review.
  • Assisted in organizing and overseeing assignments to drive operational excellence.
  • Led weekly production and operations contractor meetings, facilitating stronger communication, and helping to resolve critical issues.
  • Scheduled utility service providers according to project timelines.
  • Implemented systems to improve process efficiency and reduce project duration.
  • Analyzed and evaluated construction bids to select most cost-effective contractors.
  • Collaborated with structural engineers to evaluate structural integrity of projects.
  • Used computer software to design construction plans and perform calculations.
  • Obtained building and specialty permits from local jurisdictional agencies.
  • Reduced costs by streamlining contract bidding and procurement processes to assure best prices for materials and services.
  • Led design and development of residential and commercial buildings.
  • Oversaw effective disposal of construction waste and implemented programs to increase use of recycled materials.

Carpenter Foreman

Annying Johnson
03.2015 - 06.2020
  • Mentored junior carpenters to develop their skills, ensuring a well-trained workforce for future projects.
  • Increased project efficiency by delegating tasks and supervising a team of carpenters.
  • Ensured compliance with building codes by thoroughly reviewing design plans before commencing construction tasks.
  • Reduced material waste by implementing accurate measurements, cutting techniques, and proper storage practices.
  • Established a positive working environment fostering teamwork and open communication among crew members.
  • Enhanced client satisfaction with high-quality craftsmanship in custom carpentry work.
  • Maintained organized records of blueprints, plans, and specifications for easy access during the construction process.
  • Managed subcontractors effectively to ensure timely delivery of materials and services without compromising quality.
  • Contributed to the company''s reputation for excellence through consistent high-quality workmanship on all assigned projects.
  • Completed projects on-time and within budget through effective resource allocation and scheduling.
  • Coordinated movement of materials and equipment to job sites, verifying supply readiness prior to project start.
  • Inspected work performed by carpentry crews to check completion of job specifications.
  • Improved worksite safety by enforcing strict adherence to safety protocols and conducting regular inspections.
  • Assessed project size to prepare work orders and determine resources needed to complete jobs.
  • Resolved issues promptly during the construction process, preventing delays in project completion.
  • Kept accurate records of materials used, employee timesheets, client issues and accident reports.
  • Observed all OSHA and corporate safety regulations and procedures to prevent mishaps and injuries on job sites.
  • Streamlined communication between architects, engineers, and construction teams for seamless project execution.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Provided feedback to workers on job performance and safety procedures.
  • Assisted in recruiting and hiring new construction and extraction workers.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Sourced suppliers and purchased necessary materials for work.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Supervised training of new construction and extraction workers on safety practices and procedures.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Documented construction and extraction workers' hours, wages and other pertinent information.
  • Supported construction and extraction workers to facilitate timely completion of projects.
  • Communicated with stakeholders on job milestones.
  • Created and implemented plans to maximize efficiency of workers.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.
  • Devised and implemented safety protocols to reduce risks on construction and extraction sites.
  • Developed and maintained positive relationships with clients and other stakeholders.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Directed projects according to schedule and quality demands.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Collaborated closely with clients to understand their requirements and deliver customized solutions tailored to their needs.
  • Assisted in estimating project costs accurately helping secure new contracts while maintaining profitability.
  • Conducted post-project evaluations identifying areas for improvement in future projects.
  • Reviewed and approved time and attendance records of carpentry crews.
  • Addressed employee issues and conflicts, applying listening and communication skills to promote quick resolution.
  • Optimized workflow by creating detailed task schedules for the entire carpentry team.
  • Maintained contact with lumber companies and hardware dealers for material pricing.
  • Instituted preventative maintenance programs for tools and equipment, reducing downtime due to repairs or replacements.
  • Implemented cost-saving measures in sourcing materials without sacrificing quality or aesthetics of finished products.
  • Continuously updated knowledge of industry trends, tools, technologies, and best practices ensuring maintained competitive edge in the market.
  • Supervised teams of up to Number employees, answering questions, and providing feedback on work progress.
  • Oversaw schedules and assignments for Number personnel.

Education

Bachelor - Construction Management

Kennesaw State University
Kennesaw, GA
11.2022

Diploma -

Marietta High School
Marietta Ga
05.2015

Skills

  • Excellent work ethic
  • Joint taping
  • Hand tool expertise
  • Concise time-management
  • Wall framing
  • Patchwork expertise
  • Corner bead installation
  • Customer service
  • Waste disposal
  • Level 5 finishing
  • Power tool proficiency
  • Drop ceiling installation
  • Inventory control
  • Ceiling work
  • Drywall repair
  • Personal protective equipment
  • Team member development
  • Worksite preparation
  • Stilts usage
  • Drywall lift operation
  • Curved surface finishing
  • Moisture-resistant drywall
  • Soundproofing techniques
  • OSHA compliance
  • Construction best practices
  • Fire-rated assemblies
  • EIFS experience
  • First aid training
  • Texture application
  • Troubleshooting
  • Recycling practices
  • Fiberglass reinforced panels
  • Material estimation
  • Acoustical ceiling installation
  • Abuse-resistant drywall
  • Team oversight
  • Results-driven
  • Measuring and cutting
  • Construction
  • Worksite safety
  • Sanding techniques
  • Drywall installation
  • Team mentoring
  • Professional networking
  • Sanding
  • Fall protection
  • Smooth finishing
  • Safety protocol
  • Attentive to detail
  • Timeline coordination
  • Empowering leadership
  • Construction operations
  • Project bidding
  • Bullnose finishing
  • Reliable and consistent
  • Compound application
  • Skilled in maintenance and organization
  • Scaffold setup
  • Compound mixing
  • Blueprint reading
  • Blueprint interpretation
  • Team collaboration
  • Surface preparation
  • Teamwork
  • Teamwork and collaboration
  • Problem-solving
  • Time management
  • Attention to detail
  • Job site cleanup
  • Problem-solving abilities
  • Multitasking
  • Multitasking Abilities
  • Reliability
  • Power tool usage
  • Excellent communication
  • Organizational skills
  • Active listening
  • Effective communication
  • Adaptability and flexibility
  • Material handling
  • Job site safety
  • Decision-making
  • Professional communication
  • Physical strength
  • Relationship building
  • Team building
  • Safety protocols
  • Hand-eye coordination
  • Task prioritization
  • Equipment operation
  • Self motivation
  • Interpersonal skills
  • Analytical thinking
  • Goal setting
  • Professionalism
  • Interpersonal communication
  • Insulation installation
  • Time management abilities
  • Continuous improvement

Accomplishments

I have my own small renovation residential company that I sometimes do on my free time.

Languages

English
Native or Bilingual
Spanish
Native or Bilingual
Portuguese
Elementary

Timeline

Drywall Foreman

Ultra Drywall
03.2025 - Current

Drywall Foreman

M.o Drywall
05.2024 - 03.2025

Assistant Construction Superintendent

Segars Group
07.2020 - 03.2023

Carpenter Foreman

Annying Johnson
03.2015 - 06.2020

Drywall Finisher Foreman

Annying Johnson

Bachelor - Construction Management

Kennesaw State University

Diploma -

Marietta High School
Edgar Pineda