Result oriented Plant Director with over 9 years of expertise in automotive electronics manufacturing. Proven track record in optimizing production processes, reducing operational costs, and leading successful turnaround implementations. Skilled in project management, with a history of overseeing complex initiatives from conception through execution. Effective leader of a multi-functional team of 200+ employees, consistently driving operational improvements and achieving significant cost savings. Adept at aligning manufacturing operations with business objectives to enhance efficiency, quality, and profitability.
Overview
9
9
years of professional experience
1
1
Certification
Work History
Plant Director
Plastic Omnium
Hendersonville, Tennessee
12.2022 - 12.2023
Led a team of 200+ employees, including managers, supervisors, and production staff, ensuring efficient daily operations of the plant, consistently meeting production targets, quality standards, and delivery schedules.
Implemented a weekly agenda to review and monitor KPIs, driving operational improvements, enhancing productivity, and optimizing manufacturing processes to reduce costs and improve performance.
Held full responsibility for the plant’s Profit and Loss statement, overseeing financials, including budgeting, cost control, and financial analysis, contributing to profitability.
Fostered a positive and engaging work environment, motivating employees to meet and exceed performance goals while promoting a culture of accountability and innovation.
Collaborated cross-functionally with engineering, sales, supply chain, and quality assurance teams to resolve production challenges, streamline operations, and ensure customer demands were met.
Developed and executed production plans aligned with customer requirements, optimizing inventory levels and managing raw material procurement to improve supply chain efficiency.
Implemented rigorous quality control processes, addressing deviations through corrective and preventive actions to meet or exceed customer expectations.
Led continuous improvement initiatives, utilizing lean manufacturing and Six Sigma principles to drive efficiency and performance gains.
Championed workplace safety, ensuring compliance with safety protocols and regulatory standards.
Coached and mentored staff, developing leadership potential and preparing high-potential employees for future management roles.
Key Achievements:
Successfully led a comprehensive turnaround strategy that resulted in the first positive P&L result since 2018 within just three months of implementation.
Delivered a 10% improvement in operational efficiency, contributing to sustained financial success.
Reduced raw materials and finished goods inventory from $22.6M to $9.5M within 10 months, significantly decreasing customer backlog and reducing freight costs by 3%.
Oversaw quality improvement initiatives, reducing scrap rates by 30%, leading to decreased material waste and enhanced overall product quality.
Achieved recognition for the plant as the “Best Safety Improvement Plant” at the 2023 Plastic Omnium Lighting Convention in Munich.
Led quoting efforts for the Rivian Peregrine project, adding $7M in annual revenue, with the start of production set for March 2024.
Spearheaded a high-impact insourcing initiative that successfully onboarded additional business, generating $5M in revenue for 2024.
Operations Manager
Osram Continental
Hendersonville, Tennessee
04.2021 - 12.2022
Oversaw daily operations of an $80M automotive manufacturing facility, managing a team of 120+ employees across multiple shifts to achieve production targets and maintain quality standards.
Collaborated with cross-functional teams to reduce downtime and optimize production scheduling and resource allocation, implementing lean manufacturing tools to enhance operational efficiency.
Worked closely with the Quality team to establish and maintain strict quality control protocols, ensuring consistent product quality.
Led a comprehensive leveling program and structured onboarding process for new hires, enhancing training in safety, quality, and operational procedures.
Developed strategies to incentivize continuous learning and skill development among team members, improving employee retention and engagement.
Spearheaded plant-wide initiatives to improve material management and inventory control, optimizing processes across all production areas.
Key Achievements:
Achieved a 20% improvement in Overall Equipment Effectiveness (OEE) through process optimization, leading to significant cost reductions and increased operational efficiency.
Reduced customer complaints by 75% by collaborating with the Quality team and enhancing quality assurance protocols.
Nominated to lead a plant-wide project focused on reducing inventory losses, achieving an 85% quarterly reduction and saving over $1 million.
Successfully implemented strategies for material management and backflushing, enhancing overall inventory accuracy and control.
Contributed to a 3% decrease in employee turnover through improved training programs and continuous development initiatives.
Manufacturing Engineering RFQ and Planning
Osram Continental
Hendersonville, Tennessee
01.2020 - 04.2021
Conducted capacity studies to support strategic footprint decisions and customer feasibility, resulting in additional revenue through the extension of current programs.
Worked closely with engineering and operations team to identify and address production bottlenecks, successfully reducing cycle times and increasing throughput by 15%.
Implement SMED on two production lines, achieving a 50% reduction during changeover and enhancing overall production efficiency.
Coordinated the validation of various products across multiple production lines resulting in increased production flexibility.
New Product Launch Manager
Continental Automotive
Nogales, Sonora
06.2017 - 01.2020
Spearheaded the industrialization plan for expanding TCU 100 connectivity capacity for Ford, increasing output from 8K units per week to 79K units per week.
Managed Capex budgets of $30M in 2018 and $17M in 2019, overseeing expense planning and the receipt of invoices while achieving cost savings of approximately 10%.
Led the quotation process for additional equipment, managing the integration and debugging of new machinery to ensure seamless operations.
Conducted weekly meetings with Ford to provide updates on progress and maintain alignment with the industrialization plan.
Performed capacity studies in response to Ford’s GCP analysis, ensuring optimal production capabilities and adherence to required standards.
Facilitated Lean workshops that led to the automation of manual operations through the introduction of collaborative robots (cobots), reducing manpower requirements from 9 operators to 5 per line across 4 assembly lines.
Key Achievements:
Increased TCU 100 production output from 8K to 79K units per week, supporting Ford’s expanded connectivity needs.
Achieved cost savings of approximately 10% through effective budget management and strategic allocation of resources.
Successfully reduced manpower requirements by 44% per assembly line through the introduction of cobots, enhancing efficiency across 4 lines.
Industrial Engineer
Continental Automotive
Nogales, Sonora
02.2015 - 06.2017
Spearheaded initiatives that improved production line efficiency by 10% through targeted process optimizations.
Conducted cycle time measurements for SMD and Final Assembly processes, achieving a 10% reduction in cycle time and increased throughput.
Developed and implemented Work Combination Tables and Standard Operation Sheets, leading to a reduction in labor costs by $30K per year and saving 1 headcount per shift.
Managed routing development and maintenance in SAP to ensure accurate and efficient production routing.
Led the design and installation of new SMD and Final Assembly lines, increasing production efficiency and overall capacity.
Analyzed and reduced changeover times on the SMD line by 15 minutes using SMED principles, increasing production availability by 2.5%.
Conducted monthly capacity analysis for the IC Business Unit, providing critical data that supported production capacity increases and optimized resource allocation.
Key Achievements:
Improved production line efficiency by 10% through process optimizations, boosting productivity and resource use.
Reduced cycle times by 10% in SMD and Final Assembly, significantly increasing throughput.
Saved $30K annually in labor costs by optimizing line balancing and implementing new operational standards.
Increased production availability by 2.5% through successful changeover time reduction, contributing to smoother production flow.