Summary
Overview
Work History
Skills
Additional Information
Certification
Timeline
Generic

ED GHRIST - PRODUCTION FOREMAN - GC

Loomis,CA

Summary

Results oriented Contractor/Foreman reflecting responsibility in leadership and active involvement in both comercial and residential framing. Offering dependable, disciplined work habits, self motivated and goal driven to reach high achievement. My background also demonstrates a consistent effort to contribute to improved optimization and development of high performance teams focused on maximizing productivity, efficiency, quality, and safety. Adept at interpreting blueprints and managing materials to ensure project efficiency while recognized for pushing through tight deadlines through time management and crew oversight. Always Committed to excellence.

Overview

13
13
years of professional experience
1
1
Certification

Work History

Lead Frame Foreman

Proframe
04.2021 - 03.2025
  • Studied and interpreted blueprints to plan team assignments
  • Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule
  • Oversaw daily operations at site, keeping team production moving at optimal pace
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Inspected completed work to verify quality standards and compliance with criteria
  • Checked equipment for saftey and maintenance
  • Maintained a safe working environment through adherence to safety protocols and regular site management
  • Optimized resource utilization for cost savings,carefully monitoring material savings, carefully monitoring material usage and labor allocations.
  • Documented construction hours, and other pertinent information using iPad

Frame Foreman

Villiage Properties Inc.
01.2018 - 02.2021
  • Studied and interpreted blueprints
  • Implemented efficient work processes to boost overall productivity while reducing costs
  • Inspected completed work to verify quality standards and compliance
  • Inspected equipment and tools used for safe operation.
  • Saved money by minimizing material waste
  • Documented construction hours
  • Maintained safety regulations, procedures and standards on construction site

General Contractor

Pima Capital Managment LLC
06.2012 - 12.2017
  • Established a reputation for delivering quality work.
  • Oversaw subcontractors to meet project needs.
  • Conducted regular site inspections to ensure adherence to project specifications and building codes.
  • Implemented safety protocols to minimize risks on job sites.
  • Implemented strategies to reduce costs, improve productivity and reduce waste.
  • Innovated construction solutions to overcome project challenges, ensuring timely completion despite unforeseen issues.

Skills

  • Worksite safety practices
  • Extensive knowledge in Comercial, Residential, Custom, Conventional, and Stick Framing
  • Blueprint interpretation and Schematics
  • Inspector walk-throughs, crane signaling, Fork lift cert
  • Hands on supervision and direction of 2 to 30 employees
  • Work Planning and Prioritization
  • Daily reporting
  • Materials coordination
  • Checking equipment
  • Complex problem solving
  • Adaptable to working with different personalities
  • Valid state license

Additional Information

PROFRAME 2021-2025

Production Frame Foreman

(completed jobs)


• MYSTIQUE Sacramento, CA. 80,000 sqft +- 4 building, 2 story Cluster Homes

• MANSION Downtown Sacramento. 400,000sqft +- 5 story Apt.

• HYATT Sacramento, CA. 200,000 sqft +- 4 story Hotel- Apt

• B-20 Chico, CA. 180,000+- 4 story Retirement Center

• COLLEGE CREEK APARTMENTS

Santa Rosa, CA 180,000+- 2 buildings, 3 story, 1 building, 4 story Apt.

• BROADWAY- 180,000 +- 3 story Apt

• SAYBROOK- 2 Refab, 1 building, 3 story Apt

• WOODLAND MARRIOTT- 66,000 +-Hotel

• CALISTOGA RESORT- 6 building Guest rooms, resort

Certification

• Forklift

• Power tools

• Hand signals

• CPR

Timeline

Lead Frame Foreman

Proframe
04.2021 - 03.2025

Frame Foreman

Villiage Properties Inc.
01.2018 - 02.2021

General Contractor

Pima Capital Managment LLC
06.2012 - 12.2017
ED GHRIST - PRODUCTION FOREMAN - GC