Summary
Overview
Work History
Skills
Languages
Timeline
Generic

Eduard Corona

Perris,CA

Summary

Adept at leading teams and managing materials efficiently, I significantly enhanced work quality and safety at R-Cold Construction. My expertise in heavy equipment operation and strong leadership skills resulted in surpassing project targets while upholding OSHA compliance. Known for adaptability and meticulous report writing, I excel in fast-paced environments, ensuring project and safety standards are exceeded.

Reliable construction professional with hands-on experience in various building projects. Skilled in operating machinery, handling tools, and following blueprints to ensure quality work. Strong focus on team collaboration, adapting to changing needs, and achieving project goals. Known for dependability, strong work ethic, and commitment to safety standards.

Overview

9
9
years of professional experience

Work History

Construction Worker

JBS Plastering INC
01.2016 - 01.2018


  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Reduced material waste by accurately measuring, cutting, and assembling wood framing components.
  • Upheld exceptional levels of accuracy in measurements during layout processes for walls, ceilings, floors which resulted in fewer adjustments later on.
  • Installed frames and secured to walls and support structures.
  • Ensured proper installation of structural elements such as beams, headers, and floor systems following blueprints and specifications.
  • through supervised practice at different stages of building projects.
  • Utilized various hand tools and power tools to complete projects.
  • Improved heavy machinery performance by conducting regular maintenance checks and addressing issues promptly.


Construction Foreman

R-Cold Construction
02.2020 - 01.2025
  • Supervised field crews to maximize quality and work efficiency.
  • Studied and interpreted blueprints to plan construction phases and team assignments.
  • Reduced safety incidents by implementing and enforcing strict safety guidelines and protocols.
  • Verified and submitted team timesheets.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Sourced suppliers and purchased necessary materials for work.
  • Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets.
  • Supervised material usage and contractor man-hours to keep projects in line with budgetary restrictions.
  • Maintained accurate records of project details, including permits, inspections, blueprints, and change orders for easy reference.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Worked flexible hours across night, weekend, and holiday shifts.
  • Improved system efficiency by performing routine maintenance on refrigeration equipment and components.
  • Improved system efficiency by conducting regular maintenance checks on refrigeration equipment.
  • Conducted comprehensive inspections on commercial refrigeration systems to identify potential problems before they escalated into costly repairs.

Skills

  • Managing materials
  • Heavy lifting
  • Crew oversight
  • Power tool operation
  • OSHA compliance
  • Worksite safety
  • Team-oriented and dependable
  • Report writing
  • Quality controls
  • Reviewing timesheets
  • Heavy equipment operation
  • Excellent communication
  • Organizational skills
  • Adaptability and flexibility
  • Team leadership

Languages

Spanish
Native or Bilingual
English
Native or Bilingual

Timeline

Construction Foreman

R-Cold Construction
02.2020 - 01.2025

Construction Worker

JBS Plastering INC
01.2016 - 01.2018
Eduard Corona