Eduardo has over 25 years of experience in various fields, with the last 10 years being in management in Survey/Civil/Paint and now as a General Field Superintendent. He has a strong understanding of schedules and is constantly reviewing plans to keep the field up to date on changes from engineering. This continual dialogue between Eduardo and craft supervision produces great communication and teamwork, ensuring accuracy and minimizing rework. This results in a higher quality product for clients. Eduardo utilizes his years of experience to inform his employees on how to safely and effectively perform their job while adhering to the schedule.
Overview
23
23
years of professional experience
Work History
General Field Superintendent
Golden Triangle Polymers
Orange, TX
01.2024 - Current
Eduardo is a General Field Superintendent over all crafts on his assign areas this project will conclude in December by schedule.
Golden Triangle Polymers is an 8-billion-dollar project that will produce poly pellets.
General Field Superintendent
GOLDEN PASS LNG
Sabine Pass, TX
01.2019 - 01.2024
Golden Pass Lng consisted of expansion of 3 Trains Eduardo was General Field Superintendent of all crafts on the existing plant on the Browns Field Area this project was a 14-billion-dollar project.
Golden Pass Lng consisted of expansion of 3 Trains Eduardo was General Field Superintendent of all crafts on the existing plant on the Browns Field Area this project was a 14-billion-dollar project.
Survey Superintendent
FREEPORT LNG
Freeport, TX
01.2015 - 01.2019
The Freeport LNG project is a joint venture with CB&I CHIYODA AND ZACHRY, the project consisted of 3 new liquefaction trains, the project is a 14-billion-dollar project was over all survey of the job and over the paint department to completion.
The Freeport LNG project is a joint venture with CB&I CHIYODA AND ZACHRY, the project consisted of 3 new liquefaction trains, the project is a 14-billion-dollar project was over all survey of the job and over the paint department to completion.
Survey Superintendent
Air Liquide
Port Neches, TX
01.2014 - 01.2015
The Air Liquide project in port Neches consisted of a new air separation unit. The engineering was done by Zachry and Air Liquide, the project was consisted of complete modules that came from China.
The Air Liquide project in port Neches consisted of a new air separation unit. The engineering was done by Zachry and Air Liquide, the project was consisted of complete modules that came from China.
Survey Superintendent
Air Liquide
LaPorte, Texas
01.2014 - 01.2014
The Air Liquide project in LaPorte Texas required the installation of 3 new boilers and combustion turbine that tied into the existing plant, Zachry was able to execute the work with no disruption to plant operations.
The Air Liquide project in LaPorte Texas required the installation of 3 new boilers and combustion turbine that tied into the existing plant, Zachry was able to execute the work with no disruption to plant operations.
Party Chief
FPL Port Everglades
Fort Lauderdale, Florida
01.2014 - 01.2014
The FPL project consisted of a 3-on-1, Combine cycle, Zachry performed Engineering, Procurement and Construction of the project.
The FPL project consisted of a 3-on-1, Combine cycle, Zachry performed Engineering, Procurement and Construction of the project.
Party Chief
Calpine Expansion Project
Channel View, TX
01.2012 - 01.2014
The Calpine Expansion project consisted of an addition of a HRS and a Mitsubishi combustion turbine and added 3 vessels to the water treatment building, Zachry performed engineering, Procurement and construction, Zachry executed the construction work and tie into existing pipe racks without no disruption to plants operation.
The Calpine Expansion project consisted of an addition of a HRS and a Mitsubishi combustion turbine and added 3 vessels to the water treatment building, Zachry performed engineering, Procurement and construction, Zachry executed the construction work and tie into existing pipe racks without no disruption to plants operation.
Party Chief
Dominion Virginia Power
Front Royal, VA
01.2012 - 01.2012
Zachry performed the Procurement and Construction on the Dominion Generating Station. This project was a 3-on-1, combined cycle power with an acc cooling unit. Zachry had complete construction, turnover, start-up, and commissioning responsibilities.
Zachry performed the Procurement and Construction on the Dominion Generating Station. This project was a 3-on-1, combined cycle power with an acc cooling unit. Zachry had complete construction, turnover, start-up, and commissioning responsibilities.
Party Chief
EW Brown Project
Harrodsburg, KY
01.2012 - 01.2012
This project consisted of an addition of a Compressor unit to the existing plant, Zachry performed EPC (Engineering, Procurement, Construction), Zachry executed the work without no disruption to plants operation.
This project consisted of an addition of a Compressor unit to the existing plant, Zachry performed EPC (Engineering, Procurement, Construction), Zachry executed the work without no disruption to plants operation.
Party Chief
Piedmont Green Power Project
Barnesville, GA
01.2011 - 01.2012
This project consisted of a biomass-fired generating power by using forestry byproducts, Zachry performed EPC (Engineering, Procurement, Construction), Zachry had completed construction turn-over start-up and commissioning responsibilities.
This project consisted of a biomass-fired generating power by using forestry byproducts, Zachry performed EPC (Engineering, Procurement, Construction), Zachry had completed construction turn-over start-up and commissioning responsibilities.
Party Chief
Chevron Refinery
Pascagoula, MS
01.2009 - 01.2011
This project consisted of the addition of 3 new units at the Chevron refinery in Pascagoula MS, I was in charge of 3 survey crews and doing a second check to all the layout of construction and control points of different contractor that we had on site
This project consisted of the addition of 3 new units at the Chevron refinery in Pascagoula MS, I was in charge of 3 survey crews and doing a second check to all the layout of construction and control points of different contractor that we had on site
Party Chief
Marathon Refinery
Garyville, LA
01.2007 - 01.2009
Was in charge of 3 survey crews in the area that I was designated, this project was at the Marathon refinery in Louisiana, lay out all the addition of a massive tank farm plus help other in the green side were the new unit was going to tie to existing plant.
Was in charge of 3 survey crews in the area that I was designated, this project was at the Marathon refinery in Louisiana, lay out all the addition of a massive tank farm plus help other in the green side were the new unit was going to tie to existing plant.
Party Chief
Kia Car Factory
West Point, GA
01.2006 - 01.2007
Was in charge of all surveying of the project, It consisted of building all the foundation pits for the new construction
Was in charge of all surveying of the project, It consisted of building all the foundation pits for the new construction
Party Chief
Hyundai Car Plant Factory
Montgomery, AL
01.2005 - 01.2006
This project consisted of an engine building addition in the Hyundai plant in Montgomery Alabama pro
This project consisted of an engine building addition in the Hyundai plant in Montgomery Alabama pro
Surveyor
Polazzo Tower
Panama City, FL
01.2005 - 01.2005
Responsible for all surveying of the project, making sure blueprints were up to date. This project was the Palazzo 20 story condo tower with an elevated pool on the 5 floor.
Responsible for all surveying of the project, making sure blueprints were up to date. This project was the Palazzo 20 story condo tower with an elevated pool on the 5 floor.
Survey Assistant
Majestic Tower
Panama City, FL
01.2004 - 01.2005
This Project was a 25-story Majestic Tower, Helping The party chief on all lay out and elevation for the project.
This Project was a 25-story Majestic Tower, Helping The party chief on all lay out and elevation for the project.
Personal Information
Title: General Field Superintendent
Training
Trimble Business Center Training including on robotic total station and trimble gps system, Training on leica robotic total station and gps system, 10hour Osha class, getting started with word 2010, Corporate values and Ethics Policy, Cost Control Training, Detail Planning Management Process, CMIS Job Cost-1