Summary
Overview
Work History
Education
Skills
Certification
PERSONAL INFORMATION
Timeline
Generic

Eduardo Rosas

Dinuba,CA

Summary

Excelled in independent work environments, rapidly acquiring new skills and contributing to team success.

Overview

10
10
years of professional experience
1
1
Certification

Work History

PV Technician 2

Pearce Renewables
Fresno
03.2026 - 05.2026
  • Conducted routine maintenance and troubleshooting on renewable energy systems.
  • Collaborated with team to optimize operational workflows and improve efficiency.
  • Implemented safety protocols and ensured compliance with industry standards.
  • Mentored junior technicians, enhancing skill
  • sets and promoting best practices.
  • Worked in commercial jobs,
  • Troubleshooting central inverter string, inverters, corrective maintenance, preventative maintenance

Electrical Technician

Tesla
Fresno, California
03.2025 - 12.2025
  • Worked at substations and maintenance MVT's during O&M inspections. Executed daily responsibilities with precision and efficiency.
  • Spearheaded innovative initiatives and solutions to elevate team performance and outcomes.
  • Collaborated effectively with a diverse team to achieve objectives and resolve product and service-related challenges.
  • Streamlined task prioritization and organization to enhance service goal achievement.
  • Enhanced customer satisfaction by effectively resolving issues through knowledgeable and friendly service.
  • Delivered exceptional service and attentiveness to customers during in-person and phone interactions.
  • Facilitated collaboration among team members to drive project objectives and adhere to deadlines.
  • Executed installation and maintenance of electrical systems in residential and commercial buildings.
  • Identified and resolved electrical issues through comprehensive testing and analysis using specialized equipment and tools.
  • Analyzed and interpreted blueprints to strategize electrical installation processes.
  • Facilitated collaboration with contractors to ensure adherence to project specifications.
  • Oversaw installation and maintenance of electrical systems across diverse projects.
  • Executed comprehensive safety inspections to uphold regulatory compliance standards.
  • Led collaboration with project managers to strategize electrical system layouts and designs.
  • Mentored junior electricians in implementing best practices and adhering to safety protocols.
  • Directed troubleshooting efforts for electrical issues in commercial and residential buildings.
  • Oversaw inventory management of electrical supplies and tools to enhance operational efficiency.
  • Evaluated blueprints and technical drawings to direct installation procedures.
  • Facilitated team meetings to evaluate project progress and resolve challenges.
  • Established and optimized wireless network configurations to meet customer specifications.

PV Technician

SunGrow
Fresno
01.2025 - 04.2025

-PV technician was overall and my responsibilities were to take care of it maintenance Sungrow central inverters tied in with MVT’s .

-I serviced the SG 3,500-4400 . Cold commissioning, hot commissioning.

-also soft perform commissioning work which include included corrective maintenance by replacing power stacks rep replacing capacitors rep replacing CT’s, troubleshooting, clearing faults.

Electrical Technician

Tesla
Fresno, CA
04.2019 - 04.2024
  • Completed jobs independently and as part of a crew of 4-5 members. Assisted in managing crew activities to perform maintenance tasks, including ground-mount installations and carport constructions.
  • Diagnosed and resolved issues with inverters to ensure optimal performance.
  • Executed maintenance procedures for inverters to ensure optimal performance.
  • Assisted in testing AC/DC voltage levels. Supported troubleshooting of low dry-type transformers. Aided in replacing subcomponents within inverters. Coordinated with vendors for RMA processes. Utilized thermal IR equipment to monitor operational standards and prevent overheating. Employed multiple meters to verify AC and DC voltages.
  • Executed replacement of thermal connectors, transitioning from A4 to Amphenol and various types.
  • Assisted in maintenance of AC equipment, central inverters, AC load centers, and AC distribution panel boards. Supported safety protocols by performing lockout/tagout procedures and wearing appropriate personal protective equipment including 40 cal suits.

Electrical Technician

Ginder Development
Fresno, CA
02.2020 - 03.2020
  • Assemble solar modules, panels, or support structures, as specified
  • Install active solar systems, including solar collectors, concentrators, pumps, or fans
  • Apply weather sealing to array, building, or support mechanisms
  • Install photovoltaic (PV) systems in accordance with codes and standards using drawings, schematics, and instructions
  • Perform routine photovoltaic (PV) system maintenance on modules, arrays, batteries, power conditioning equipment, safety systems, structural systems, weather sealing, or balance of systems equipment

Electrical Team Lead

Braun Electric
Bakersfield, CA
11.2019 - 12.2019
  • Oversaw installation of SolarEdge inverters for solar array systems.
  • Measured distances for inverters and assisted with mounting processes.
  • Supported hanging of inverters to ensure proper installation.
  • Collaborated with team members to facilitate equipment setup.

Installer

KuyKendall Solar
Fresno, CA
09.2018 - 04.2019
  • Installed on commercial roofs, Chase Banks, Residential Roofs, Ground mount Systems, Solar Farms
  • Commercial jobs, Chase Banks 46.86kw, Costco 645.84kw
  • Ground mounted (fixed and Tracker) -Dos Palos 798 kw, Sun maids 311kw, 225.72kw, 602.6kw
  • Residential Roofs Over 50 House
  • Wire manage, run home runs, Run AC and DC wiring, read plans, MC, connect panels and jumpers
  • Dig trenches to depth, Install PVC pipe, run PVC pipe into inverters and assemble, install ground with c-taps
  • Install all types of roof mount systems as far as panel claw, Unirac, Iron Ridge
  • Roof Layout, build racking, install racking, Install panels, Install inverters, run wire, bend conduit
  • Individually owned tools allowing work performance as well as reliable transportation
  • Operate Boom, Lift, Gradual.

Electrical Technician

Nova West Solar
Fresno, CA
06.2017 - 07.2017
  • Assisted in installing panels on residential roofs and ground mount systems. Supported installation efforts for industrial hotel projects. Collaborated with team members to ensure timely project completion.
  • Operated boom stick to execute precise tasks in various projects.
  • Executed home run lines to enhance team performance and engagement. Supported team members in achieving project milestones through effective communication. Assisted in streamlining processes to improve overall efficiency.
  • Executed comprehensive management of project timelines and deliverables.
  • Oversaw warehouse cleaning operations to ensure a safe and organized environment.

Quality Control Inspector

Swinterton Renewable Energy
Five Points, CA
03.2016 - 05.2016
  • Assisted in managing quality control arrays to support project objectives. Collaborated with team members to maintain data accuracy and integrity. Contributed to the development of testing protocols for quality assurance.
  • Conducted thorough inspections of modules to ensure quality and compliance standards.
  • Conducted thorough inspections of modules for damage, scratches, breaks, or bends to uphold quality standards.
  • Recorded status of defective modules on material sheets to maintain accurate inventory records. Flagged issues with tape, radio, and other equipment to facilitate timely repairs. Assisted team in tracking module performance and identifying areas for improvement.
  • Identified and flagged damaged modules, documenting status on flagging tape.
  • Documented module number series and pallet number on material sheet for accurate inventory tracking.
  • Executed safe operation of torch wrench to secure loose bolts.

Education

Solar

William M. Maguy School of Education
Visalia, CA

High School Diploma - undefined

Ronald Regan Academy
Dinuba, CA

Skills

  • Assisted in creating electrical drawings and schematics Supported team members in understanding technical specifications Contributed to project documentation and revisions
  • Utilized hand tools to assist in various tasks Supported team members in completing projects efficiently Maintained tools to ensure readiness for use
  • Assisted in creating engaging presentations using PowerPoint Supported team members in developing visual aids for meetings Contributed to the organization of information for clear communication
  • Executed movement strategies to enhance operational efficiency
  • Operated and maintained machinery to ensure efficient production processes
  • Conducted VAC and VDC testing to support quality assurance processes Assisted in troubleshooting issues identified during testing phases Collaborated with team members to ensure compliance with testing protocols
  • Implemented NFPA 70E standards to ensure electrical safety compliance in workplace environments
  • Utilized Microsoft Office applications to assist in document creation and data management Supported team members in organizing presentations and reports Aided in maintaining accurate records and schedules
  • Demonstrated expertise in electrical systems and components
  • Conducted megger testing to assess insulation resistance and ensure electrical safety standards
  • Conducted AC voltage testing to ensure compliance with safety standards
  • Conducted comprehensive DC voltage testing to ensure system reliability
  • Demonstrated exceptional motivation and commitment to achieving goals
  • Executed maintenance and repair of electrical systems to ensure operational efficiency
  • Assisted in maintaining workplace safety standards through OSHA 10 training Supported team members in understanding safety protocols and regulations Contributed to a safer work environment by promoting compliance with safety guidelines
  • Assisted in monitoring SCADA systems to support operational efficiency Collaborated with team members to troubleshoot system issues Contributed to documentation of system processes and procedures
  • Executed repairs on subcomponents to ensure optimal functionality
  • Diagnosed and resolved ground faults to ensure system safety and reliability
  • Assisted in electrical installations and troubleshooting tasks Supported team members in identifying and resolving electrical issues Contributed to maintaining safety standards during installations
  • Executed solar system troubleshooting to identify and resolve operational issues
  • Executed blueprint interpretation to ensure accurate project execution
  • Ensured adherence to safety compliance standards and regulations
  • Authored comprehensive documentation for IT projects, including installation instructions and procedural guidelines
  • Compiled comprehensive service reports outlining repairs and maintenance activities executed
  • Executed routine maintenance on solar energy systems to ensure optimal performance
  • Identified and resolved electrical issues in solar installations to ensure optimal system performance
  • Facilitated collaboration among team members to enhance project completion efficiency
  • Oversaw adherence to safety regulations throughout installation processes
  • Instructed clients on solar system functionality and advantages
  • Facilitated training sessions for new technicians on installation practices
  • Executed electrical wiring for solar panel inverters and associated components
  • Diagnosed and resolved issues with existing solar systems to ensure optimal performance
  • Oversaw compliance of all installations with local building codes and regulations
  • Analyzed current system designs to identify and implement cost-saving opportunities
  • Executed maintenance procedures on solar equipment to guarantee peak operational efficiency
  • Evaluated data from monitoring devices to pinpoint areas requiring enhancement or maintenance
  • Established remote access points to facilitate monitoring of customer solar systems
  • Delivered technical support to customers for existing and newly installed solar systems
  • Mentored junior technicians in installation techniques and safety protocols
  • Facilitated collaboration among team members to ensure timely project completion
  • Executed comprehensive electrical system assessments to facilitate optimal solar integration
  • Monitored adherence to local electrical codes and safety regulations
  • Ensured accuracy and integrity of records pertaining to work executed at each job site
  • Formulated comprehensive preventative maintenance plans to ensure optimal performance of residential and commercial PV installations
  • Delivered technical support to customers for optimal operation of solar electric systems
  • Executed calibration of digital meters to ensure accurate measurement of current voltage and power output from photovoltaic systems
  • Executed operation of test equipment, including ammeters, oscilloscopes, and multimeters, during installation and maintenance activities
  • Diagnosed potential issues in solar electric systems before installation or repair
  • Executed maintenance repairs and modifications on existing solar electric systems
  • Executed assembly, installation, testing, and maintenance of equipment including inverters, charge controllers, and batteries
  • Installed and connected wires to circuit breakers and transformers to ensure efficient electrical distribution
  • Assisted customers with inquiries and issues to enhance satisfaction Provided support in resolving product-related concerns Facilitated communication between customers and service teams
  • Developed comprehensive technical documentation to enhance user understanding and product usability
  • Assisted teams in completing projects by collaborating effectively and sharing resources Supported team members in achieving project goals through open communication and cooperation Contributed to a positive team environment by fostering collaboration and mutual respect
  • Installed and connected wires to circuit breakers, transformers, and other electrical components
  • Analyzed schematics, blueprints, and diagrams to ensure timely project completion
  • Engineered and implemented three-phase 277/480 volt power distribution systems
  • Conducted inspections of electrical equipment to identify and rectify hazards, defects, and repair needs
  • Assessed electrical systems, equipment, and components to identify and rectify defects and safety hazards
  • Evaluated electrical assembly to ensure optimal performance and compliance with safety standards
  • Managed project details while ensuring compliance with diagnosis wiring and OSHA regulations
  • Conducted testing of electrical systems and circuit continuity utilizing ohmmeters, voltmeters, and oscilloscopes

Certification

Valid Drivers License

PERSONAL INFORMATION

  • Title: Solar certified technician
  • Work Permit: Authorized to work in the US for any employer

Timeline

PV Technician 2

Pearce Renewables
03.2026 - 05.2026

Electrical Technician

Tesla
03.2025 - 12.2025

PV Technician

SunGrow
01.2025 - 04.2025

Electrical Technician

Ginder Development
02.2020 - 03.2020

Electrical Team Lead

Braun Electric
11.2019 - 12.2019

Electrical Technician

Tesla
04.2019 - 04.2024

Installer

KuyKendall Solar
09.2018 - 04.2019

Electrical Technician

Nova West Solar
06.2017 - 07.2017

Quality Control Inspector

Swinterton Renewable Energy
03.2016 - 05.2016

Solar

William M. Maguy School of Education

High School Diploma - undefined

Ronald Regan Academy
Eduardo Rosas