Fabricate & install 6"-30" Ladder Tray, Ground level and Heights
Flex instruments
Helped mount J Boxes, PLC/Rio Panels,
Ran 3/4-3" Aluminum conduit
Helped tail-in cables to MCC's, PLC's, J-Boxes
Completed semi-skilled work under under qualified supervision, terminated instruments such as PIT,LIT,TIT,SDV.
Helped my journeymen Operate man Lift,Scissor Lift & Fork lift to finish our daily production.
Electrician Top Helper
MMR
Port Sulphur, LA
Grounding Drilling in ground rounds, grounding the rods with bare 4 AWG.
Ran Duct Banks 3/4-4" PVC & Rigid conduit
Fab & install pipe racks unistrut/ Double strut
Verify for new revisions on updated prints
Fab & installed stub ups from duct banks
Ran conduit inside MCC's
Installed buss bars inside MCC's
Operate manlift & scissor lift
Started running plastic bond conduit underground 3/4" up to 4"
Electrician Top Helper
Triad
Austin, TX
Helped terminate 3 phase 480 buckets
Fab & install cable tray 12"-24"
Helped pull/ tail in cables to buckets
Ran 3/4 to 1 1/2" Emt conduit
Journeyman Electrician
RUS Industries
Columbus, OH
Run aluminum conduit 3/4" up to 2"
Ran 6" up to 24" cable tray for instruments, Low Voltage & High Voltage.
Ran 6" up to 24" conduit for bare ground cable
Ran PVC conduit for bare ground cable
Ran cable tray on bottom of MCC's
Terminate in control room on PLC panel, Bucket panels from 350 to 750
i was also doing temporary power installing 480v disconnects, 3phase transformer and single phase transformers, pull wire for temp power and terminate.
Permit to Work Coordinator and Mechanical Isolation Certificate Designer at CloughPermit to Work Coordinator and Mechanical Isolation Certificate Designer at Clough