Strategic Supervisor with expertise prioritizing projects, planning workflow and managing employees to achieve operational goals. Resourceful individual with 9 years of active experience managing efforts within deadline-driven environments. Diplomatic individual with strong leadership and decision-making skills.

Overview

9
9
years of professional experience

Work History

Lead General Foreman

Zachry Group
Port Arthur, TX
05.2022 - 12.2022
  • scheduling work plans for boiler hrsg modules structure, acc fan structure , enclosure structure , filler house modules
  • Maintained compliance with all safety procedures from both client and employer.
  • Interpreted blueprints, sketches and specifications for each job.
  • Identified issues and addressed each immediately with job foreman.
  • Inspected equipment, structures and materials to identify cause of errors.
  • Coordinated movement of materials and equipment to job sites.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Worked alongside team to accomplish work goals according to schedule.
  • Progress reports

Boilermaker Foreman

TEiC
Jewett, TX
01.2022 - 05.2022
  • Maintained compliance with all safety procedures from both client and employer.
  • Interpreted blueprints, sketches and specifications for each job.
  • Inspected equipment, structures and materials to identify cause of errors.
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Inspected equipment and structures to determine scope of work (SOW).
  • Removed boiler casings, grades, handrails, manhole and hole covers to facilitate access to boilers or other vessels for repair.
  • Operated forklifts, and over head crane
  • Utilized welding equipment and tools to safely complete predetermined operations .
  • Removed, replaced or installed materials to perform annual maintenance.

Iornworker Welder

Bruker
Panama City, FL
07.2021 - 01.2022
  • Determined size, shape, placement and material of supports based on blueprints and structural standards.
  • Prioritized safety across job site with specific attention to load suspension, welding and cutting.
  • Skilled in use of specialized metalworking and concrete manipulation tools to perform assigned tasks.
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Hoisted metal components into place, safely operating cranes during process.
  • Welded, cut and bent steel as necessary with torches, metal shears and welding equipment.
  • Fabricated steel frames, columns, beams and girders according to blueprints or instructions from site managers.
  • Welded in flat, horizontal, vertical and overhead positions.
  • Clamped, held, tack-welded, heat-bent and bolted component parts to achieve required configurations and positions.
  • Set up and operated shielded metal arc and gas metal arc welding equipment.
  • Fabricated shop parts directly from blueprints.

Ironworker General Foreman

Apex
Marble Falls, TX
02.2021 - 07.2021
  • Determined size, shape, placement and material of supports based on blueprints and structural standards.
  • Prioritized safety across job site with specific attention to load suspension, welding and cutting.
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Hoisted metal components into place, safely operating cranes during process.
  • Calculated materials and labor required to complete jobs on-schedule and prepared estimates.

Ironworker Foreman

Performance
Corpus Christi Tx
07.2020 - 02.2021
  • Determined size, shape, placement and material of supports based on blueprints and structural standards.
  • Skilled in use of specialized metalworking and concrete manipulation tools to perform assigned tasks.
  • Used appropriate safety measures and encouraged other team members to do same in effort to avoid job site injuries.
  • Hoisted metal components into place, safely operating cranes during process.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Prioritized safety across job site with specific attention to load suspension, welding and cutting.

Boilermaker Journeyman Welder

TEiC
Hobbs, NM
04.2020 - 07.2020
  • Maintained compliance with all safety procedures from both client and employer.
  • Interpreted blueprints, sketches and specifications for each job.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Identified issues and addressed each immediately with job foreman.
  • Inspected equipment, structures and materials to identify cause of errors.
  • Operated forklifts, over head crane
  • Utilized welding equipment and tools to safely complete predetermined operations .
  • Repaired flinches leaks by tightening or replacing bolts and gaskets, utilizing combo ranch and impact gun
  • Removed, replaced or installed DA tanks, wall tubes materials to perform annual maintenance.

Boilermaker Journeyman Welder

TEiC
Amarillo, TX
01.2020 - 03.2020
  • Maintained compliance with all safety procedures from both client and employer.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Removed boiler casings, grades, handrails, manhole and hole covers to facilitate access to boilers or other vessels for repair.
  • Operated forklifts, overhead crane
  • Repaired super headers, S tubes machinery and equipment according to manufacturer specifications.
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.

Boilermaker Journeyman Welder

TEiC
San Antonio, TX
09.2019 - 12.2019
  • Maintained compliance with all safety procedures from both client and employer.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Removed boiler casings, grades, handrails, manhole and hole covers to facilitate access to boilers or other vessels for repair.
  • Operated forklifts
  • Removed, replaced or installed turbo fan baskets materials to perform annual maintenance.

Boilermaker Journeyman Welder

TEiC
Big Spring, TX
03.2019 - 05.2019
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Interpreted blueprints, sketches and specifications for each job.
  • Maintained compliance with all safety procedures from both client and employer.
  • Removed boiler casings, grades, handrails, manhole and hole covers to facilitate access to boilers or other vessels for repair.
  • Operated forklifts
  • Utilized welding equipment tools to safely complete predetermined operations .
  • Removed, replaced or installed steam drum tubes materials to perform annual maintenance.

Boilermaker Journeyman Welder

TEiC
Amarillo, TX
01.2019 - 03.2019
  • Marked reference points for columns or plates on foundations using master straightedge.
  • Removed, replaced or installed boiler walls materials to perform annual maintenance.
  • Utilized welding equipment and tools to safely complete predetermined operations .
  • Operated forklifts
  • Cleaned and maintained boilers and associated equipment to increase efficiency and performance level.
  • Removed boiler casings, grades, handrails, manhole and hole covers to facilitate access to boilers or other vessels for repair.
  • Maintained compliance with all safety procedures from both client and employer.
  • Used hand signals to notify crane operator to lift components to specific positions.

Iornworker

S&B Contractors And Engineers
Freeport, TX
09.2018 - 12.2018
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Inspected projects, identified issues that occurred and implemented corrective measures.
  • Prioritized safety across job site with specific attention to load suspension, welding and cutting.
  • Reviewed work plans and blueprints to ascertain all requirements for project.
  • Used appropriate safety measures and encouraged other team members to do same in effort to avoid job site injuries.
  • Determined size, shape, placement and material of supports based on blueprints and structural standards.

Iornworker

Performance
Westlake, LA
05.2017 - 09.2018
  • Maneuvered and positioned support structures before and after pouring concrete, often manipulating iron by cutting, welding or bending.
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Inspected projects, identified issues that occurred and implemented corrective measures.
  • Hoisted metal components into place, safely operating cranes during process.
  • Skilled in use of specialized metalworking and concrete manipulation tools to perform assigned tasks.
  • Prioritized safety across job site with specific attention to load suspension, welding and cutting.
  • Cut metal components to required lengths using metal shears, hacksaws and bar cutters.
  • Used appropriate safety measures and encouraged other team members to do same in effort to avoid job site injuries.
  • Determined size, shape, placement and material of supports based on blueprints and structural standards.

Iornworker

Turner Construction
Westlake, LA
12.2016 - 05.2017
  • Used appropriate safety measures and encouraged other team members to do same in effort to avoid job site injuries.
  • Determined size, shape, placement and material of supports based on blueprints and structural standards.
  • Cut metal components to required lengths using metal shears, hacksaws and bar cutters.
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Hoisted metal components into place, safely operating cranes during process.
  • Prioritized safety across job site with specific attention to load suspension, welding and cutting.

Iornworker

Fluor
Freeport, TX
05.2014 - 12.2016
  • Used appropriate safety measures and encouraged other team members to do same in effort to avoid job site injuries.
  • Determined size, shape, placement and material of supports based on blueprints and structural standards.
  • Cut metal components to required lengths using metal shears, hacksaws and bar cutters.
  • Reviewed work plans and blueprints to ascertain all requirements for project.
  • Prioritized safety across job site with specific attention to load suspension, welding and cutting.
  • Hoisted metal components into place, safely operating cranes during process.
  • Skilled in use of specialized metalworking and concrete manipulation tools to perform assigned tasks.
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Inspected projects, identified issues that occurred and implemented corrective measures.
  • Examined architectural drawings and building blueprints to determine reinforcement requirements.

Iornworker

KBR
Westlake, LA
01.2016 - 11.2016
  • Used appropriate safety measures and encouraged other team members to do same in effort to avoid job site injuries.
  • Determined size, shape, placement and material of supports based on blueprints and structural standards.
  • Cut metal components to required lengths using metal shears, hacksaws and bar cutters.
  • Prioritized safety across job site with specific attention to load suspension, welding and cutting.
  • Hoisted metal components into place, safely operating cranes during process.
  • Skilled in use of specialized metalworking and concrete manipulation tools to perform assigned tasks.
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Maneuvered and positioned support structures before and after pouring concrete, often manipulating iron by cutting, welding or bending.
  • Examined architectural drawings and building blueprints to determine reinforcement requirements.

Education

High School Diploma -

Png High School
Groves, TX
05.2013

Skills

  • Residential and Commercial Projects
  • Specifications Conformance
  • Worker Supervision
  • MS word very good
  • MS outlook very good
  • Crew Scheduling
  • Job Planning
  • Attention to Detail
  • Crew Safety Meetings
  • General Housekeeping
  • Project Leadership

Accomplishments

  • Supervised team of 43 staff members.
  • Achieved filler house, enclosure, converter by completing erecting structure with accuracy and efficiency.
  • Used Microsoft Excel to develop inventory tracking spreadsheets.

Languages

English
Native or Bilingual
Spanish
Native or Bilingual

References

  • Ezekiel Castillanos (661) 487-0969 Commissioning Mechanical LNG superintendent
  • Erick Rodriguez (270) 903-2579 General foreman
  • Juan Manual (661)917-3170 boiler hrsg superintendent
  • Darin Santiago (210) 980-4731 Iron superintendent
  • James Timbo (251) 654-7417 Iron superintendent

Timeline

Lead General Foreman

Zachry Group
05.2022 - 12.2022

Boilermaker Foreman

TEiC
01.2022 - 05.2022

Iornworker Welder

Bruker
07.2021 - 01.2022

Ironworker General Foreman

Apex
02.2021 - 07.2021

Ironworker Foreman

Performance
07.2020 - 02.2021

Boilermaker Journeyman Welder

TEiC
04.2020 - 07.2020

Boilermaker Journeyman Welder

TEiC
01.2020 - 03.2020

Boilermaker Journeyman Welder

TEiC
09.2019 - 12.2019

Boilermaker Journeyman Welder

TEiC
03.2019 - 05.2019

Boilermaker Journeyman Welder

TEiC
01.2019 - 03.2019

Iornworker

S&B Contractors And Engineers
09.2018 - 12.2018

Iornworker

Performance
05.2017 - 09.2018

Iornworker

Turner Construction
12.2016 - 05.2017

Iornworker

KBR
01.2016 - 11.2016

Iornworker

Fluor
05.2014 - 12.2016

High School Diploma -

Png High School