Overview
Work History
Education
Skills
Timeline
Generic

Eli Omecinski

Myrtle Beach,SC

Overview

6
6
years of professional experience

Work History

General Laborer/Construction Worker

Q construction
Myrtle Beach, SC
06.2022 - 01.2025
  • Took accurate measurements to calculate size and amount of materials needed for project completion.
  • Installed windows, flooring, or trim using hand or power tools.
  • Demonstrated best safety practices working at heights and lifting various objects.
  • Added vapor barriers or insulating materials on flat roofs.
  • Participated in all phases and types of commercial roofing.
  • Cut roofing paper to size and nailed and stapled paper to roof in overlapping strips to form base for roofing materials.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Displayed high standards for quality workmanship and routinely double-checked work.
  • Assisted skilled workers in performing more complex tasks such as installing sheet metal flashings.
  • Applied sealants to ensure the integrity of the installation against water leakage.
  • Inspected finished installations for quality assurance purposes.
  • Removed old windows, caulked around edges of new frames, and applied weatherstripping.
  • Painted interior walls using quality paints from reputable manufacturers.
  • Signaled equipment operators to facilitate alignment, movement or adjustment of machinery.
  • Laid tile flooring or backsplashes in kitchens and bathrooms following manufacturer instructions.
  • Loaded or unloaded building materials to distribute machinery or tools.
  • Provided advice on design ideas for a variety of home remodeling projects based on customer preferences.
  • Measured and cut materials to fit specific dimensions for remodeling projects.
  • Installed drywall, framing, insulation, cabinetry, countertops and trim.
  • Applied sealants around windows and doors to prevent air leakage.
  • Assembled built-in furniture such as bookcases or cabinets according to specifications.
  • Performed demolition of existing walls, floors, and ceilings to prepare for new construction.
  • Dug ditches or trenches, backfilled excavations or compacted and leveled earth to grade specifications.
  • Repaired damaged surfaces including drywall, plaster or other wall finishes.
  • Ensured all tools were properly maintained by cleaning them regularly and performing necessary repairs when needed.
  • Measured, marked or recorded openings or distances to construction layout areas.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Removed old fixtures such as sinks, toilets and bathtubs to replace with new ones.
  • Worked effectively in team environments to make the workplace more productive.
  • Operated a variety of machinery and tools safely and efficiently.

Education

High School Diploma -

Sissonville High School
Charleston, WV
07-2019

Skills

  • Repairing wall surfaces
  • Construction support
  • Equipment management
  • Worksite organization
  • Construction site safety
  • Problem-solving
  • Drywalling
  • Demolition work
  • Safety protocol
  • Scaffolding setup
  • Team collaboration
  • Residential construction
  • Time management
  • Flooring installation
  • Drywall installation
  • Roofing
  • Construction project completion
  • Window installation
  • Concrete mixing
  • Debris and trash removal
  • Measuring and cutting
  • Organization
  • Heavy lifting
  • Commercial construction experience
  • Hand tools operation
  • Power tools proficiency
  • Cement finishing
  • Basic carpentry
  • Attention to detail
  • Door installation
  • Insulation application
  • Hand and power tools
  • Fence building
  • Roofing installation

Timeline

General Laborer/Construction Worker

Q construction
06.2022 - 01.2025

High School Diploma -

Sissonville High School
Eli Omecinski