Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Elliot Ardoin

Welsh,LA

Summary

A seasoned Drill Site Manager with a proven track record at Chevron, I excel in directional drilling and personnel management. My expertise has led to drilling projects completed ahead of schedule, under budget by 44%, and setting performance records. I thrive in high-stakes environments, demonstrating exceptional leadership and problem-solving skills.

Professional in drilling operations, prepared to deliver impactful results. Managed complex drilling projects, ensuring adherence to safety protocols and operational efficiency. Known for strong team collaboration and adaptability to changing needs, showcasing excellent problem-solving and leadership skills.

Overview

32
32
years of professional experience
1
1
Certification

Work History

Drill Site Manager

Chevron
01.2024 - Current
  • Managed daily drill site activities, coordinating with various departments for smooth operations and on-time project completion.
  • Completed electronic morning report and end of well documentation.
  • Assisted in developing budget estimates for drilling projects while considering factors such as rig rates, material costs, labor hours required for completion.
  • Mitigated risks associated with drilling operations through continuous monitoring of well conditions and rapid response to potential hazards or changes in formation pressure.
  • Monitored rig activity to coordinate timely arrival of site-related equipment, personnel and materials.
  • Reduced downtime and costs by streamlining drill site operations and optimizing equipment utilization.
  • Achieved successful drilling outcomes by effectively managing personnel, resources, and schedules in a challenging environment.
  • Delivered accurate well data through timely reporting, comprehensive documentation, and close collaboration with geologists.

Drill Site Manager

Chevron
02.2023 - 01.2024
  • Managed daily drill site activities, coordinating with various departments for smooth operations and on-time project completion.


DSR on Big Foot Offshore Platform GOM, Drilled and completed Injector Canada well and is operating at desired injection capacity. Successful 5 year maintenance operation on Nabors Mod 400 Drilling rig. Successful R/U of 1st offline coil tubing operation for New York Well. Team member working nights assisted in the 16" Casing run on Big Foot Mexico A-7 was the heaviest casing string run to date on M-400. It was also the deepest 16" shoe set at Big Foot to date.

Drill Site Manager

Chevron
11.2020 - 02.2023
  • Managed daily drill site activities, coordinating with various departments for smooth operations and on-time project completion.
  • DSR on Valaris DS18 Drill Ship
    Efficient execution of WR678 St Malo IS001 ahead of schedule and under budget. This well set the record dry hole days/10kft of any St Malo well (23.47)
    First thru-tree work scope with the DS-18 for Chevron.
    •Successfully operated tree with 100% ROV manipulation.
    •First pull of First Tahiti tree that was completed and on production.
    •Successful management of tight-clearance subsea infrastructure.
    •Great teamwork with production ops to minimize nearby well shut-in times and maximize production ops work scope during those shut-ins.
    •Performed two adjacent tree inspections for production ops while latched up to Tahiti PS001, saving over $200k for production ops team.

Drill Site Manager

Chevron
08.2017 - 11.2020
  • Managed daily drill site activities, coordinating with various departments for smooth operations and on-time project completion.
  • Drilled numerous Long reach Horizontal wells, Managed Locations without reserve pits. Fast paced drilling with support of Vacuum Trucks.
    I was Lead DSR on Nabors X53 - Successfully drilled a BIC, by a significant margin, SWD well in Delaware Ranch. This is a step change in performance, delivered through execution and the 2nd SWD well in a row where significant improvement has been achieved.
    Beating previous wells by 19 days, saving $5.5 million vs AFE (44% below budget)

Drill Site Manager

Chevron
07.2016 - 08.2017
  • Managed daily drill site activities, coordinating with various departments for smooth operations and on-time project completion.
  • Drilled and Completed the Sarta 3 Well.
  • Maintained IFO operations from Rig up to Rig down.
  • Heightened Security situation when Kurdistan held the referendum Vote.

Drill Site Manager

Chevron
01.2013 - 07.2017
  • Managed daily drill site activities, coordinating with various departments for smooth operations and on-time project completion.
  • Worked on BBLT, Tender West Vencedor, Ensco 109, Drilled and completed numerous wells. Performed Thru tubing Frac, Workovers and Slot recoverys.
  • DSR on Ensco 109 drilling Congo River Crossing
  • Team member in Malongo working on Save our SASBU, reassigned as QAQC over completion Operations supporting 2 offshore rigs.

Driller, Toolpusher

Transocean Deepwater Drilling
02.2009 - 12.2012
  • Reduced downtime through proactive maintenance and timely repair of drilling equipment.
  • Improved safety on the rig by enforcing strict adherence to safety protocols and conducting regular safety drills.
  • Supervised drill site setup, ensuring proper installation and alignment of drilling equipment for maximum operational efficiency.
  • Supported management of all drilling and rig move operations
  • Cyber Driller then promoted to Toolpusher on Drill Ship
  • Team member running and Landing the Capping stack on BP Well Macondo

Drilling Consultant

Petroleum Solutions International
01.2007 - 01.2009
  • Managed drilling projects from inception to completion, ensuring timely delivery and adherence to safety standards.
  • Established strong relationships with clients through clear communication of project milestones and progress updates, promoting trust in expertise and services provided.
  • Collaborated with geologists and engineers to develop effective drilling strategies, minimizing risks and enhancing overall performance.
  • Provided expert guidance on directional drilling techniques, resulting in more accurate wellbore placement and increased production rates.

Roustabout, Derrickman, AD, Driller, TP, OIM

Noble Drilling
03.1993 - 01.2007

Started in 1993 with Chiles Offshore as a Roustabout, quickly moved up to Derrickhand before going overseas as an Assistant Driller then promoted to Toolpusher then later to OIM on Jackup in India before leaving in 2007.

Education

No Degree - General Studies

McNeese State University
Lake Charles, LA

High School Diploma -

Lacassine Elementary And High School
Lacassine, LA
05-1980

Skills

  • Well control
  • Directional drilling
  • Drilling operations
  • Environmental awareness
  • Personnel management
  • Rig supervision
  • Problem-solving
  • Multitasking and organization
  • Site inspection and management
  • Team leadership
  • Site safety
  • Flexibility and adaptability
  • Safety procedures
  • Coaching and mentoring
  • Teamwork and collaboration

Certification

IADC Well Control Surface BOP and Workover

Timeline

Drill Site Manager

Chevron
01.2024 - Current

Drill Site Manager

Chevron
02.2023 - 01.2024

Drill Site Manager

Chevron
11.2020 - 02.2023

Drill Site Manager

Chevron
08.2017 - 11.2020

Drill Site Manager

Chevron
07.2016 - 08.2017

Drill Site Manager

Chevron
01.2013 - 07.2017

Driller, Toolpusher

Transocean Deepwater Drilling
02.2009 - 12.2012

Drilling Consultant

Petroleum Solutions International
01.2007 - 01.2009

Roustabout, Derrickman, AD, Driller, TP, OIM

Noble Drilling
03.1993 - 01.2007

No Degree - General Studies

McNeese State University

High School Diploma -

Lacassine Elementary And High School
Elliot Ardoin