Summary
Overview
Work History
Education
Skills
Languages
Timeline
Bathroom
General
Grand Total Areas
Summary for Dwelling
Recap of Taxes, Overhead and Profit
Recap by Room
Recap by Category with Depreciation
Main Level
Master Bathroom
Kitchen
Dining Room
Master Bedroom
RC Public Adjusters
SKETCH1
Generic

Emilio Ramos

Punta Gorda,FL

Summary

Service management professional known for high standards and results orientation. Proven track record in optimizing service processes and enhancing team performance. Strong focus on collaboration and adaptability, ensuring reliable support and flexibility in dynamic settings. Demonstrated expertise in team leadership and customer relationship management.

Experienced with optimizing service operations and improving customer satisfaction. Utilizes team leadership and strategic planning to enhance service delivery. Track record of problem-solving and effective communication in high-pressure environments.

Overview

12
12
years of professional experience

Work History

Service Manager

Massey Services Pest Prevention
01.2019 - Current
  • Resolved customer complaints in professional and timely manner.
  • Met with customers to discuss service needs and offer available solutions.
  • Resolved escalated customer complaints professionally, turning potentially negative experiences into opportunities for continued patronage.
  • Hired, trained and supervised team of service staff members to meet business goals.
  • Analyzed service reports to identify areas of improvement.
  • Managed a team of technicians, ensuring timely completion of projects and high-quality workmanship.
  • Maintained a safe working environment by enforcing strict safety protocols and providing ongoing staff training on proper equipment use.
  • Met with customers to discuss service needs and develop effective and practical solutions.

Maintenance Engineering

Naples Grande Beach Resort
07.2016 - 02.2019
  • Trained new team members in best practices for operations and maintenance engineering tasks, contributing to their professional development growth trajectories within the company structure.
  • Evaluated new technologies or methodologies related to Maintenance Engineering which helped keep the company up-to-date with industry trends.
  • Facilitated knowledge transfer within the team by training junior engineers on best practices in electrical maintenance engineering.
  • Participated in cross-functional teams to improve overall operations, sharing insights from a maintenance engineering perspective.
  • Trained junior engineers on best practices in maintenance engineering, fostering a culture of continuous learning and improvement.
  • Provided mentorship and training to junior engineers, developing their skills in mechanical maintenance engineering concepts.
  • Provided application and control systems design and development for systems of varying complexity to support capital plant and maintenance engineering projects.

Press Operator

Sun Coast Media Group
12.2013 - 04.2016
  • Maintained strict adherence to safety protocols, ensuring a safe working environment for all team members.
  • Performed regular maintenance on press machinery to optimize performance.
  • Supported continuous improvement initiatives within the department through constructive feedback and proactive problem-solving efforts.
  • Promptly removed completed loads from press.
  • Multi-tasked to keep all assigned projects running effectively and efficiently.
  • Followed safety protocols to reduce operating risks on press machinery.
  • Loaded and positioned raw materials in loading and feeding mechanisms.
  • Assisted in training new press operators, sharing expertise and best practices to ensure smooth onboarding and skill development.

Education

GED -

UNIVERSITY OF THE STATE OF NEW YORK
07-2012

Skills

  • Positive attitude
  • Team leadership
  • Multitasking and organization
  • Problem-solving
  • Customer service
  • Critical thinking
  • Reliable and responsible
  • Employee training and development
  • Customer service management

Languages

English
Full Professional
Spanish
Native or Bilingual

Timeline

Service Manager

Massey Services Pest Prevention
01.2019 - Current

Maintenance Engineering

Naples Grande Beach Resort
07.2016 - 02.2019

Press Operator

Sun Coast Media Group
12.2013 - 04.2016

GED -

UNIVERSITY OF THE STATE OF NEW YORK

Bathroom

  • Height: 8'
  • 240.00 SF Walls 53.47 SF Ceiling
  • 293.47 SF Walls & Ceiling 53.47 SF Floor
  • 5.94 SY Flooring 30.00 LF Ceil. Perimeter
  • 30.00 LF Floor Perimeter
  • DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV
  • Walls
  • 127. R&R 1/2" - drywall per LF - up to 2' tall 30.00 LF 17.08 3.26 103.14 618.80 (20.40) 598.40
  • 128. Texture drywall - smooth / skim coat 240.00 SF 1.95 2.18 94.04 564.22 (23.51) 540.71
  • 129. Texture drywall - machine - knockdown 293.47 SF 1.25 1.03 73.56 441.43 (18.39) 423.04
  • 130. Mirror - plate glass - Detach & reset 12.00 SF 8.13 0.00 19.52 117.08 (4.88) 112.20
  • 131. Outlet or switch - Detach & reset 2.00 EA 23.59 0.00 9.44 56.62 (2.36) 54.26
  • 132. Clean outlet or switch 2.00 EA 4.61 0.00 1.84 11.06 (0.46) 10.60
  • 133. Clean the walls 240.00 SF 0.48 0.17 23.08 138.45 (5.77) 132.68
  • 134. Seal the walls w/latex based stain blocker - two coats 240.00 SF 0.98 2.35 47.52 285.07 (11.88) 273.19
  • 135. Paint the walls - two coats 240.00 SF 1.20 5.21 58.64 351.85 (14.66) 337.19
  • Flooring
  • 136. Clean floor - Heavy 53.47 SF 0.83 0.04 8.88 53.30 (2.22) 51.08
  • 137. Regrout tile floor 53.47 SF 3.53 1.83 38.12 228.70 (9.53) 219.17
  • 138. Grout sealer 53.47 SF 1.22 0.71 13.18 79.12 (3.30) 75.82
  • 139. R&R Baseboard - 3 1/4" 30.00 LF 5.45 4.20 33.54 201.24 (7.29) 193.95
  • 140. Paint baseboard - two coats 30.00 LF 1.75 0.36 10.58 63.44 (2.65) 60.79
  • 141. R&R Casing - 2 1/4" 37.00 LF 3.70 3.83 28.14 168.87 (5.54) 163.33
  • 142. Paint casing - two coats 37.00 LF 1.77 0.49 13.20 79.18 (3.29) 75.89
  • 143. Caulking - acrylic 30.00 LF 2.90 0.40 17.48 104.88 (4.37) 100.51
  • 144. Clean floor 53.47 SF 0.58 0.04 6.20 37.25 (1.55) 35.70
  • Required for the paint process:
  • 145. Mask wall - plastic, paper, tape (per LF) 30.00 LF 1.82 0.57 11.04 66.21 (2.76) 63.45
  • Protection for drywall repair
  • 146. Floor protection - cloth - skid resistant, leak proof 53.47 SF 1.16 1.31 12.66 76.00 (0.00) 76.00
  • 147. Mask and prep for paint - plastic, paper, tape (per LF) 30.00 LF 1.65 0.57 10.02 60.09 (2.51) 57.58
  • Shower
  • Bath Accessories
  • 148. Toilet - Detach & reset 1.00 EA 315.54 0.60 63.22 379.36 (15.81) 363.55
  • 149. R&R Plumbing fixture supply line 1.00 EA 32.50 0.48 6.60 39.58 (1.24) 38.34
  • 150. Toilet paper holder - Detach & reset 1.00 EA 23.49 0.00 4.70 28.19 (1.17) 27.02
  • 151. R&R Vanity 4.00 LF 258.59 53.68 217.62 1,305.66 (51.98) 1,253.68
  • 152. Sink faucet - Detach & reset 1.00 EA 155.38 0.00 31.08 186.46 (7.77) 178.69
  • 153. R&R P-trap assembly - ABS (plastic) 1.00 EA 90.49 0.56 18.22 109.27 (3.95) 105.32
  • Doors
  • 154. R&R Interior door unit 1.00 EA 380.98 18.58 79.92 479.48 (18.26) 461.22
  • 155. Door knob/lockset - Detach & reset 1.00 EA 30.20 0.00 6.04 36.24 (1.51) 34.73
  • 156. Paint door slab only - 2 coats (per side) 1.00 EA 46.12 0.72 9.36 56.20 (2.35) 53.85
  • Contents Manipulation
  • 157. Packaging, Handling, Storage (Bid Item) 53.47 SF 1.25 0.00 13.36 80.20 (3.34) 76.86
  • Totals: Bathroom 103.17 1,083.94 6,503.50 254.70 6,248.80

General

  • DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV
  • 158. On-Site Evaluation and/or Supervisor/Admin - per hour 24.00 HR 73.64 42.42 353.48 2,163.26 (0.00) 2,163.26
  • 159. Clean Ac Ducts
  • 1.00 EA 300.00 0.00 0.00 300.00 (0.00) 300.00
  • 160. Clean Ac Coils
  • 161. Megohmmeter check electrical circuits - average residence 1.00 EA 1,009.71 0.00 201.94 1,211.65 (0.00) 1,211.65
  • 162. Electrician - per hour 8.00 HR 122.91 0.00 196.66 1,179.94 (0.00) 1,179.94
  • 163. Dumpster load - Approx. 40 yards, 7-8 tons of debris 1.00 EA 1,211.00 0.00 242.20 1,453.20 (0.00) 1,453.20
  • 164. R&R Sheathing - plywood - 1/2" CDX 192.00 SF 4.33 14.78 169.22 1,015.36 (0.00) 1,015.36
  • For under dumpster
  • 165. General clean - up 8.00 HR 54.64 0.01 87.42 524.55 (0.00) 524.55
  • 166. Taxes, insurance, permits & fees (Bid Item) 1.00 EA 2,471.23 0.00 494.24 2,965.47 (0.00) 2,965.47
  • Totals: General 57.21 1,745.16 11,113.43 0.00 11,113.43
  • Total: Main Level 1,245.47 14,057.18 84,983.15 2,721.19 82,261.96
  • Total: SKETCH1 1,245.47 14,057.18 84,983.15 2,721.19 82,261.96
  • Labor Minimums Applied
  • 167. Window treatment repair 1.00 EA 54.21 0.00 10.84 65.05 (0.00) 65.05
  • 168. Finish hardware labor minimum 1.00 EA 52.35 0.00 10.48 62.83 (0.00) 62.83
  • 169. Roofing labor minimum
  • 1.00 EA 202.36 0.00 40.48 242.84 (0.00) 242.84
  • Totals: Labor Minimums Applied 0.00 61.80 370.72 0.00 370.72
  • Line Item Totals: 2023-08-02-110550 1,245.47 14,118.98 85,353.87 2,721.19 82,632.68

Grand Total Areas

  • 3,343.09 SF Walls 1,245.09 SF Ceiling 4,588.18 SF Walls and Ceiling
  • 1,234.48 SF Floor 137.16 SY Flooring 406.13 LF Floor Perimeter
  • 0.00 SF Long Wall 0.00 SF Short Wall 415.49 LF Ceil. Perimeter
  • 1,234.48 Floor Area 1,343.35 Total Area 3,343.09 Interior Wall Area
  • 2,120.22 Exterior Wall Area 233.31 Exterior Perimeter of Walls
  • 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length
  • 0.00 Total Ridge Length 0.00 Total Hip Length

Summary for Dwelling

  • Line Item Total 69,989.42
  • Material Sales Tax 1,203.05
  • Subtotal 71,192.47
  • Overhead 7,059.49
  • Profit 7,059.49
  • Laundering Tax 42.42
  • Replacement Cost Value 85,353.87
  • Less Depreciation (2,721.19)
  • Actual Cash Value 82,632.68
  • Net Claim 82,632.68
  • Total Recoverable Depreciation 2,721.19
  • Net Claim if Depreciation is Recovered 85,353.87

Recap of Taxes, Overhead and Profit

  • Overhead (10%) Profit (10%) Material Sales Tax (7%) Laundering Tax (2%) Manuf. Home Tax (6%) Storage Rental Tax (7%)
  • Line Items 7,059.49 7,059.49 1,203.05 42.42 0.00 0.00
  • Total 7,059.49 7,059.49 1,203.05 42.42 0.00 0.00

Recap by Room

  • Estimate: 2023-08-02-110550
  • Area: SKETCH1
  • Area: Main Level
  • Entry / Living Room 11,374.90 16.25%
  • Dining Room 9,083.31 12.98%
  • Master Bedroom 11,277.61 16.11%
  • Master Bathroom 9,953.04 14.22%
  • Kitchen 13,364.19 19.09%
  • Bathroom 5,316.39 7.60%
  • General 9,311.06 13.30%
  • Area Subtotal: Main Level 69,680.50 99.56%
  • Area Subtotal: SKETCH1 69,680.50 99.56%
  • Labor Minimums Applied 308.92 0.44%
  • Subtotal of Areas 69,989.42 100.00%
  • Total 69,989.42 100.00%

Recap by Category with Depreciation

  • O&P Items RCV Deprec. ACV
  • APPLIANCES 1,055.06 52.76 1,002.30
  • CABINETRY 10,736.25 536.81 10,199.44
  • CONT: CLEAN APPLIANCES 41.85 2.10 39.75
  • CONT: GARMENT & SOFT GOODS CLN 1,767.36 1,767.36
  • CLEANING 3,243.17 140.30 3,102.87
  • CONT: PACKING,HANDLNG,STORAGE 1,543.13 77.14 1,465.99
  • GENERAL DEMOLITION 5,757.11 5,757.11
  • DOORS 1,167.04 58.34 1,108.70
  • DRYWALL 14,969.42 748.47 14,220.95
  • ELECTRICAL 2,795.05 40.12 2,754.93
  • FLOOR COVERING - CARPET 2,635.78 131.78 2,504.00
  • FLOOR COVERING - CERAMIC TILE 3,456.61 172.83 3,283.78
  • PERMITS AND FEES 2,471.23 2,471.23
  • FINISH CARPENTRY / TRIMWORK 2,331.34 85.39 2,245.95
  • FINISH HARDWARE 189.93 6.87 183.06
  • MOISTURE PROTECTION 101.19 35.06 66.13
  • MIRRORS & SHOWER DOORS 195.12 9.76 185.36
  • PLUMBING 2,003.15 100.16 1,902.99
  • PAINTING 9,237.26 461.87 8,775.39
  • ROOFING 859.00 859.00
  • TILE 2,043.44 2,043.44
  • WINDOW TREATMENT 189.93 6.78 183.15
  • O&P Items Subtotal 69,389.42 2,666.54 66,722.88
  • Non-O&P Items RCV Deprec. ACV
  • USER DEFINED ITEMS 600.00 0.00 600.00
  • Non-O&P Items Subtotal 600.00 0.00 600.00
  • Material Sales Tax 1,203.05 54.65 1,148.40
  • Overhead 7,059.49 7,059.49
  • Profit 7,059.49 7,059.49
  • Laundering Tax 42.42 42.42
  • Total 85,353.87 2,721.19 82,632.68

Main Level

  • 2023-08-02-110550
  • 8/10/2023 Page: 16

Master Bathroom

  • Height: 8'
  • 313.33 SF Walls 95.38 SF Ceiling
  • 408.71 SF Walls & Ceiling 95.38 SF Floor
  • 10.60 SY Flooring 39.17 LF Ceil. Perimeter
  • 39.17 LF Floor Perimeter
  • DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV
  • Walls
  • 65. R&R 1/2" - drywall per LF - up to 2' tall 39.17 LF 17.08 4.25 134.66 807.93 (26.63) 781.30
  • 66. Texture drywall - smooth / skim coat 313.33 SF 1.95 2.85 122.78 736.62 (30.69) 705.93
  • 67. Texture drywall - machine - knockdown 313.33 SF 1.25 1.10 78.56 471.32 (19.63) 451.69
  • 68. Mirror - plate glass - Detach & reset 12.00 SF 8.13 0.00 19.52 117.08 (4.88) 112.20
  • 69. Outlet or switch - Detach & reset 2.00 EA 23.59 0.00 9.44 56.62 (2.36) 54.26
  • 70. Clean outlet or switch 2.00 EA 4.61 0.00 1.84 11.06 (0.46) 10.60
  • 71. Clean the walls 313.33 SF 0.48 0.22 30.12 180.74 (7.53) 173.21
  • 72. Seal the walls w/latex based stain blocker - two coats 313.33 SF 0.98 3.07 62.04 372.17 (15.50) 356.67
  • 73. Paint the walls - two coats 313.33 SF 1.20 6.80 76.56 459.36 (19.14) 440.22
  • Flooring
  • 74. Clean floor - Heavy 95.38 SF 0.83 0.07 15.86 95.10 (3.96) 91.14
  • 75. Regrout tile floor 95.38 SF 3.53 3.27 68.00 407.96 (16.99) 390.97
  • 76. Grout sealer 95.38 SF 1.22 1.27 23.54 141.17 (5.88) 135.29
  • 77. R&R Baseboard - 3 1/4" 39.17 LF 5.45 5.48 43.80 262.75 (9.51) 253.24
  • 78. Paint baseboard - two coats 39.17 LF 1.75 0.47 13.82 82.84 (3.45) 79.39
  • 79. R&R Casing - 2 1/4" 37.00 LF 3.70 3.83 28.14 168.87 (5.54) 163.33
  • 80. Paint casing - two coats 37.00 LF 1.77 0.49 13.20 79.18 (3.29) 75.89
  • 81. Caulking - acrylic 39.17 LF 2.90 0.52 22.82 136.93 (5.71) 131.22
  • 82. Clean floor 95.38 SF 0.58 0.07 11.08 66.47 (2.77) 63.70
  • Required for the paint process:
  • 83. Mask wall - plastic, paper, tape (per LF) 39.17 LF 1.82 0.74 14.40 86.43 (3.60) 82.83
  • Protection for drywall repair
  • 84. Floor protection - cloth - skid resistant, leak proof 95.38 SF 1.16 2.34 22.58 135.56 (0.00) 135.56
  • 85. Mask and prep for paint - plastic, paper, tape (per LF) 39.17 LF 1.65 0.74 13.06 78.43 (3.27) 75.16
  • Shower
  • 86. R&R Tile shower - 61 to 100 SF 1.00 EA 2,353.33 45.70 479.80 2,878.83 (0.00) 2,878.83
  • Bath Accessories
  • 87. Toilet - Detach & reset 1.00 EA 315.54 0.60 63.22 379.36 (15.81) 363.55
  • 88. R&R Plumbing fixture supply line 1.00 EA 32.50 0.48 6.60 39.58 (1.24) 38.34
  • 89. Toilet paper holder - Detach & reset 1.00 EA 23.49 0.00 4.70 28.19 (1.17) 27.02
  • 90. R&R Vanity 8.00 LF 258.59 107.36 435.24 2,611.32 (103.98) 2,507.34
  • 2 vanity s
  • 91. Sink faucet - Detach & reset 2.00 EA 155.38 0.00 62.16 372.92 (15.54) 357.38
  • 92. R&R P-trap assembly - ABS (plastic) 2.00 EA 90.49 1.13 36.42 218.53 (7.90) 210.63
  • Doors
  • 93. R&R Interior door unit 1.00 EA 380.98 18.58 79.92 479.48 (18.26) 461.22
  • 94. Door knob/lockset - Detach & reset 1.00 EA 30.20 0.00 6.04 36.24 (1.51) 34.73
  • 95. Paint door slab only - 2 coats (per side) 1.00 EA 46.12 0.72 9.36 56.20 (2.35) 53.85
  • Contents Manipulation
  • 96. Packaging, Handling, Storage (Bid Item) 95.38 SF 1.25 0.00 23.84 143.07 (5.96) 137.11
  • Totals: Master Bathroom 212.15 2,033.12 12,198.31 364.51 11,833.80

Kitchen

  • Height: 8'
  • 257.64 SF Walls 116.87 SF Ceiling
  • 374.51 SF Walls & Ceiling 116.87 SF Floor
  • 12.99 SY Flooring 32.21 LF Ceil. Perimeter
  • 32.21 LF Floor Perimeter
  • Missing Wall 5' 7" X 8' Opens into ENTRY__LIV2
  • Missing Wall 6' 1 5/8" X 8' Opens into ENTRY__LIV2
  • DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV
  • Walls
  • 97. R&R 1/2" - drywall per LF - up to 2' tall 32.21 LF 17.08 3.50 110.72 664.36 (21.91) 642.45
  • 98. Texture drywall - machine - knockdown 257.64 SF 1.25 0.90 64.60 387.55 (16.14) 371.41
  • 99. Texture drywall - smooth / skim coat 257.64 SF 1.95 2.34 100.94 605.68 (25.24) 580.44
  • 100. Outlet or switch - Detach & reset 4.00 EA 23.59 0.00 18.88 113.24 (4.72) 108.52
  • 101. Clean outlet or switch 8.00 EA 4.61 0.01 7.38 44.27 (1.84) 42.43
  • 102. Clean the walls 257.64 SF 0.48 0.18 24.78 148.63 (6.19) 142.44
  • 103. Seal the walls w/latex based stain blocker - two coats 257.64 SF 0.98 2.52 51.00 306.01 (12.75) 293.26
  • 104. Paint the walls - two coats 257.64 SF 1.20 5.59 62.96 377.72 (15.74) 361.98
  • Flooring
  • 105. Regrout tile floor 116.87 SF 3.53 4.01 83.32 499.88 (20.83) 479.05
  • 106. Grout sealer 116.87 SF 1.22 1.55 28.84 172.97 (7.21) 165.76
  • 107. Clean floor - Heavy 116.87 SF 0.83 0.08 19.42 116.50 (4.85) 111.65
  • Required for the paint process:
  • 108. Mask wall - plastic, paper, tape (per LF) 32.21 LF 1.82 0.61 11.84 71.07 (2.96) 68.11
  • Protection for drywall repair
  • 109. Floor protection - cloth - skid resistant, leak proof 116.87 SF 1.16 2.86 27.70 166.13 (0.00) 166.13
  • 110. Mask and prep for paint - plastic, paper, tape (per LF) 32.21 LF 1.65 0.61 10.76 64.52 (2.69) 61.83
  • Kitchen
  • 111. R&R Cabinetry - upper (wall) units 12.00 LF 197.55 109.76 496.08 2,976.44 (116.78) 2,859.66
  • CONTINUED - Kitchen
  • Totals: Master Bathroom 212.15 2,033.12 12,198.31 364.51 11,833.80
  • 112. R&R Cabinetry - lower (base) units 15.00 LF 285.78 229.85 903.34 5,419.89 (216.77) 5,203.12
  • 113. R&R Countertop - flat laid plastic laminate 30.00 LF 55.15 61.57 343.22 2,059.29 (75.41) 1,983.88
  • Appliances
  • 114. Refrigerator - Remove & reset 1.00 EA 59.13 0.00 11.82 70.95 (2.96) 67.99
  • 115. Refrig. water line - Disconnect & reconnect - with repairs 1.00 EA 114.60 1.60 23.24 139.44 (5.81) 133.63
  • 116. Clean refrigerator - exterior 1.00 EA 25.72 0.02 5.14 30.88 (1.29) 29.59
  • 117. Range - electric - Remove & reset 1.00 EA 44.35 0.00 8.88 53.23 (2.22) 51.01
  • 118. Clean range - exterior 1.00 EA 41.93 0.03 8.38 50.34 (2.10) 48.24
  • 119. Microwave oven - over range or drawer type- Detach & reset 1.00 EA 153.78 0.00 30.76 184.54 (7.69) 176.85
  • 120. Clean microwave - exterior 1.00 EA 16.13 0.01 3.22 19.36 (0.81) 18.55
  • 121. R&R Dishwasher 1.00 EA 726.25 36.04 152.46 914.75 (35.96) 878.79
  • 122. Dishwasher connection 1.00 EA 179.98 2.50 36.50 218.98 (9.13) 209.85
  • 123. Sink faucet - Detach & reset 1.00 EA 155.38 0.00 31.08 186.46 (7.77) 178.69
  • 124. Sink - double basin - Detach & reset 1.00 EA 207.93 0.06 41.60 249.59 (10.40) 239.19
  • 125. R&R P-trap assembly - ABS (plastic) 1.00 EA 90.49 0.56 18.22 109.27 (3.95) 105.32
  • Contents Manipulation
  • 126. Packaging, Handling, Storage (Bid Item) 116.87 SF 1.25 0.00 29.22 175.31 (7.30) 168.01
  • Totals: Kitchen 466.76 2,766.30 16,597.25 649.42 15,947.83

Dining Room

  • Height: Peaked
  • 647.05 SF Walls 307.11 SF Ceiling
  • 954.16 SF Walls & Ceiling 296.50 SF Floor
  • 32.94 SY Flooring 69.79 LF Floor Perimeter
  • 75.15 LF Ceil. Perimeter
  • Missing Wall - Goes to Floor 4' X 6' 8" Opens into ENTRY__LIV2
  • DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV
  • Walls
  • 16. R&R 1/2" - drywall per LF - up to 2' tall 69.79 LF 17.08 7.57 239.94 1,439.53 (47.45) 1,392.08
  • 17. Texture drywall - smooth / skim coat 647.05 SF 1.95 5.89 253.54 1,521.18 (63.38) 1,457.80
  • 18. Texture drywall - machine - knockdown 647.05 SF 1.25 2.26 162.22 973.29 (40.55) 932.74
  • 19. Outlet or switch - Detach & reset 8.00 EA 23.59 0.00 37.74 226.46 (9.44) 217.02
  • 20. Clean outlet or switch 8.00 EA 4.61 0.01 7.38 44.27 (1.84) 42.43
  • 21. Window blind - horizontal or vertical - Detach & reset 2.00 EA 45.24 0.00 18.10 108.58 (4.52) 104.06
  • 22. Clean the walls 647.05 SF 0.48 0.45 62.22 373.25 (15.55) 357.70
  • 23. Seal the walls w/latex based stain blocker - two coats 647.05 SF 0.98 6.34 128.08 768.53 (32.03) 736.50
  • 24. Paint the walls - two coats 647.05 SF 1.20 14.04 158.10 948.60 (39.52) 909.08
  • Flooring
  • 25. Remove Carpet 296.50 SF 0.44 0.00 26.10 156.56 (0.00) 156.56
  • 26. Carpet 340.98 SF 3.94 69.46 282.60 1,695.52 (70.64) 1,624.88
  • 15 % waste added for Carpet.
  • 27. R&R Carpet pad 296.50 SF 0.86 10.79 53.16 318.95 (10.47) 308.48
  • 28. R&R Baseboard - 3 1/4" 69.79 LF 5.45 9.77 78.04 468.17 (16.96) 451.21
  • 29. Paint baseboard - two coats 69.79 LF 1.75 0.83 24.58 147.54 (6.15) 141.39
  • 30. R&R Casing - 2 1/4" 37.00 LF 3.70 3.83 28.14 168.87 (5.54) 163.33
  • 31. Paint casing - two coats 37.00 LF 1.77 0.49 13.20 79.18 (3.29) 75.89
  • 32. Caulking - acrylic 69.79 LF 2.90 0.93 40.66 243.98 (10.17) 233.81
  • 33. Clean floor 296.50 SF 0.58 0.21 34.44 206.62 (8.61) 198.01
  • Required for the paint process:
  • 34. Mask wall - plastic, paper, tape (per LF) 75.15 LF 1.82 1.42 27.64 165.83 (6.91) 158.92
  • Protection for drywall repair
  • 35. Floor protection - cloth - skid resistant, leak proof 296.50 SF 1.16 7.26 70.24 421.44 (0.00) 421.44
  • 36. Mask and prep for paint - plastic, paper, tape (per LF) 75.15 LF 1.65 1.42 25.08 150.50 (6.27) 144.23
  • Contents Manipulation
  • 37. Packaging, Handling, Storage (Bid Item) 296.50 SF 1.25 0.00 74.12 444.75 (18.53) 426.22
  • Totals: Dining Room 142.97 1,845.32 11,071.60 417.82 10,653.78

Master Bedroom

  • Height: 8'
  • 526.67 SF Walls 173.92 SF Ceiling
  • 700.58 SF Walls & Ceiling 173.92 SF Floor
  • 19.32 SY Flooring 65.83 LF Ceil. Perimeter
  • 65.83 LF Floor Perimeter
  • Subroom: Closet (1) Height: 8'
  • 149.33 SF Walls 18.72 SF Ceiling
  • 168.05 SF Walls & Ceiling 18.72 SF Floor
  • 2.08 SY Flooring 18.67 LF Ceil. Perimeter
  • 18.67 LF Floor Perimeter
  • Subroom: Closet (2) Height: 8'
  • 146.67 SF Walls 17.65 SF Ceiling
  • 164.31 SF Walls & Ceiling 17.65 SF Floor
  • 1.96 SY Flooring 18.33 LF Ceil. Perimeter
  • 18.33 LF Floor Perimeter
  • DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV
  • Walls
  • 38. R&R 1/2" - drywall per LF - up to 2' tall 102.83 LF 17.08 11.16 353.52 2,121.02 (69.92) 2,051.10
  • 39. Texture drywall - smooth / skim coat 822.67 SF 1.95 7.49 322.34 1,934.04 (80.58) 1,853.46
  • 40. Texture drywall - machine - knockdown 822.67 SF 1.25 2.88 206.24 1,237.46 (51.56) 1,185.90
  • 41. Outlet or switch - Detach & reset 8.00 EA 23.59 0.00 37.74 226.46 (9.44) 217.02
  • 42. Clean outlet or switch 8.00 EA 4.61 0.01 7.38 44.27 (1.84) 42.43
  • 43. Window blind - horizontal or vertical - Detach & reset 1.00 EA 45.24 0.00 9.04 54.28 (2.26) 52.02
  • 44. Clean the walls 822.67 SF 0.48 0.58 79.10 474.56 (19.77) 454.79
  • 45. Seal the walls w/latex based stain blocker - two coats 822.67 SF 0.98 8.06 162.86 977.14 (40.71) 936.43
  • 46. Paint the walls - two coats 822.67 SF 1.20 17.85 201.02 1,206.07 (50.25) 1,155.82
  • Flooring
  • 47. Remove Carpet 210.28 SF 0.44 0.00 18.50 111.02 (0.00) 111.02
  • 48. Carpet 241.82 SF 3.94 49.26 200.42 1,202.45 (50.10) 1,152.35
  • 15 % waste added for Carpet.
  • 49. R&R Carpet pad 210.28 SF 0.86 7.65 37.72 226.21 (7.42) 218.79
  • 50. R&R Baseboard - 3 1/4" 102.83 LF 5.45 14.40 148.98 689.81 (24.99) 664.82
  • 51. Paint baseboard - two coats 102.83 LF 1.75 1.22 36.24 217.41 (9.06) 208.35
  • 52. R&R Casing - 2 1/4" 85.00 LF 3.70 8.81 64.68 387.99 (12.72) 375.27
  • CONTINUED - Master Bedroom
  • 53. Paint casing - two coats 85.00 LF 1.77 1.13 30.32 181.90 (7.58) 174.32
  • 54. Caulking - acrylic 102.83 LF 2.90 1.37 59.92 359.50 (14.98) 344.52
  • 55. Clean floor 210.28 SF 0.58 0.15 24.44 146.55 (6.11) 140.44
  • Required for the paint process:
  • 56. Mask wall - plastic, paper, tape (per LF) 102.83 LF 1.82 1.94 37.82 226.91 (9.46) 217.45
  • Protection for drywall repair
  • 57. Floor protection - cloth - skid resistant, leak proof 210.28 SF 1.16 5.15 49.82 298.89 (0.00) 298.89
  • 58. Mask and prep for paint - plastic, paper, tape (per LF) 102.83 LF 1.65 1.94 34.32 205.93 (8.58) 197.35
  • Doors
  • 59. Interior door - Detach & reset 1.00 EA 111.68 0.07 22.36 134.11 (5.58) 128.53
  • 60. Door knob/lockset - Detach & reset 1.00 EA 30.20 0.00 6.04 36.24 (1.51) 34.73
  • 61. Paint door slab only - 2 coats (per side) 1.00 EA 46.12 0.72 9.36 56.20 (2.35) 53.85
  • 62. R&R Bifold door - Colonist - Single 2.00 EA 201.12 14.69 83.40 500.33 (18.83) 481.50
  • 63. Paint bifold door set - slab only - 2 coats (per side) 2.00 EA 62.06 2.81 25.38 152.31 (6.35) 145.96
  • Contents Manipulation
  • 64. Packaging, Handling, Storage (Bid Item) 210.28 SF 1.25 0.00 52.58 315.43 (13.14) 302.29
  • Totals: Master Bedroom 159.34 2,287.54 13,724.49 525.09 13,199.40

RC Public Adjusters

  • Insured: Alexandra Colon and Emilio Ramos
  • Property: 416 Concordia St Punta Gorda, FL 33983
  • Claim Rep.: Frank Penate Business: (786) 808-8711
  • Company: RC Public Adjusters
  • Claim Number: CFL#200129326 Policy Number: IFH6039900-02 Type of Loss: Backup of Sewer or Drain
  • Date of Loss: 2023-05-16T00:00:00 Date Received:
  • Date Inspected: Date Entered: 2023-08-02T11:05:00
  • Price List: FLFM8X_AUG23 Restoration/Service/Remodel
  • Estimate: 2023-08-02-110550

SKETCH1

  • 2023-08-02-110550
  • Entry / Living Room Height: 8'
  • 1062.40 SF Walls 461.99 SF Ceiling
  • 1524.38 SF Walls & Ceiling 461.99 SF Floor
  • 51.33 SY Flooring 132.13 LF Floor Perimeter
  • 136.13 LF Ceil. Perimeter
  • Missing Wall 6' 1 5/8" X 8' Opens into KITCHEN
  • Missing Wall 5' 7" X 8' Opens into KITCHEN
  • Missing Wall - Goes to Floor 4' X 6' 8" Opens into DINING_ROOM
  • DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV
  • Walls
  • 1. Texture drywall - smooth / skim coat 1,062.40 SF 1.95 9.67 416.28 2,497.63 (104.06) 2,393.57
  • 2. Texture drywall - machine - knockdown 1,062.40 SF 1.25 3.72 266.34 1,598.06 (66.59) 1,531.47
  • 3. Outlet or switch - Detach & reset 10.00 EA 23.59 0.00 47.18 283.08 (11.80) 271.28
  • 4. Clean outlet or switch 10.00 EA 4.61 0.01 9.22 55.33 (2.31) 53.02
  • 5. Clean the walls 1,062.40 SF 0.48 0.74 102.14 612.83 (25.54) 587.29
  • 6. Seal the walls w/latex based stain blocker - two coats 1,062.40 SF 0.98 10.41 210.32 1,261.88 (52.58) 1,209.30
  • 7. Paint the walls - two coats 1,062.40 SF 1.20 23.05 259.60 1,557.53 (64.89) 1,492.64
  • Flooring
  • 8. Regrout tile floor 461.99 SF 3.53 15.85 329.34 1,976.01 (82.33) 1,893.68
  • 9. Grout sealer 461.99 SF 1.22 6.14 113.94 683.71 (28.49) 655.22
  • 10. R&R Baseboard - 3 1/4" 132.13 LF 5.45 18.50 147.74 886.34 (0.00) 886.34
  • 11. Paint baseboard - two coats 132.13 LF 1.75 1.57 46.56 279.36 (11.64) 267.72
  • 12. Clean floor - Heavy 461.99 SF 0.83 0.32 76.76 460.53 (19.19) 441.34
  • Required for the paint process:
  • 13. Floor protection - cloth - skid resistant, leak proof 461.99 SF 1.16 11.32 109.44 656.67 (0.00) 656.67
  • 14. Mask and prep for paint - plastic, paper, tape (per LF) 136.13 LF 1.65 2.57 45.44 272.62 (11.36) 261.26
  • Contents Manipulation
  • 15. Packaging, Handling, Storage (Bid Item) 461.99 SF 1.25 0.00 115.50 692.99 (28.87) 664.12
  • Totals: Entry / Living Room 103.87 2,295.80 13,774.57 509.65 13,264.92