Summary

As a talented Technically Skilled and Qualified person with an abundance of appropriate experience in the Mechanical Engineering Profession I bring with me critical solutions to various engineering equipment and machinery covering the mining industry and manufacturing industries. My experience in the profession spans over twenty-five years, all gained in the heavy chemical manufacturing industry and mining industries in Zimbabwe, South Africa and Botswana. I possess a sound track record which has seen me excel through to senior managerial levels in engineering. In addition to this, I am a proven results oriented performer with a record of outstanding performance that has been made possible through self-initiated educational advancement in the mechanical engineering field where my interest has been bestowed. I have scored well in the implementation of effective management and maintenance strategies that covered a wide range of plant equipment. At senior managerial level I spearheaded expansion projects, modifications of plant layout, plant equipment modification and refurbishment to ensure optimization of equipment availability thereby boosting production. My conscientious approach has assisted me in ensuring the organizations I am linked to remain viable businesses over the years. I now have all the confidence that I am fully equipped with the knowledge and engineering background enriched with experience to tackle any challenge in engineering that includes but not limited to equipment refurbishment and maintenance, plant design and installations to ensure profitable turn on investment for any organization likely to be faced with engineering related problems.

Overview

45
45
years of professional experience

Work History

Resident Engineer

Trojan Nickel Mine
01.2007
  • Promoted to a Resident Engineer for the entire Refinery plant (2007 – 2009). From 21 February 2013 – 31 April 2014 I was seconded to Trojan Nickel Mine to assist after it was realized that both the Trojan Mining and Trojan Concentrator had numerous engineering problems that were hampering production which placed the company into a lot of financial problems. By the end of March 2013, both the production targets started being achieved and surpassed up to the end of April 2014 when I resigned from BNC to pursue my own business interests.

Executive Director

Runicta Young Engineering Contractors (Pty) Ltd
01.2007 - Current

Installation Project

APR Energy
03.2015 - 03.2017
  • Successfully accomplished installation project for a 35MW diesel power plant with APR Energy an American company that was later dismantled at Matselagabedi - Francistown.

Section Engineer

Bindura Nickel Corporation
01.2004 - 01.2006
  • Section Engineer for the Refinery plant at Bindura Nickel Corporation after being promoted based on performance and also being a holder of high level qualification in mechanical engineering profession.

Engineering Foreman

Bindura Nickel Corporation
01.1996 - 01.2003
  • Engineering Foreman at Bindura Nickel Corporation after a performance based promotion.

Senior Maintenance Artisan

Bindura Nickel Corporation
01.1989 - 01.1995
  • Joined Bindura Nickel Corporation as a senior maintenance Artisan covering Smelting and Refinery plants.

Acting Charge-hand

Sable Chemical Industry Ltd
01.1987 - 10.1989
  • Sable Chemical Industry Ltd - Acting Charge-hand on numerous occasions.

Senior Plant Equipment Maintenance Artisan

Sable Chemical Industry Ltd
01.1984 - 01.1987
  • Senior plant equipment maintenance artisan - Sable Chemical Industry Ltd. Kwekwe

Apprenticeship Training Program

Sable Chemical Industries Ltd
01.1980 - 01.1984
  • Five years of apprenticeship training program in mechanical engineering trade soon after completing my High School

Education

Masters in Project Management (MSc-PM) -

University of Salford
01.2017

Certificate of Competence in Quality Management System Internal Audit (ISO 9001: 2000) - undefined

PIMS Management by Standards (Pvt) Ltd
01.2008

Internal Environmental Management Systems Auditing Certificate (EMS) - undefined

PIMS Management by Standards (Pvt) Ltd
01.2003

Middle Management Development Programme (MMDP) - undefined

OTD
01.2001

British Engineering Council Programme - Mechanical Engineering Degree Program

University of Zimbabwe
01.2000

Principals of Training and Training of Trainers - undefined

CTU – Anglo American Corporation of South Africa Ltd
01.1998

Higher National Diploma (HND) - Mechanical Engineering

Harare Poly-Technical College
01.1997

Advanced City & Guilds Certificate - Mechanical Engineering Trade

Bulawayo Technical College
01.1984

Skills

  • Multi-disciplinary planned maintenance management approach which includes coming up with an effective master schedule for planned maintenance of the following plant equipment:
  • Process pumps, control valves, pump boxes, delivery lines and storage tanks
  • Hydraulic rams press and the power pack and DC valves
  • Crushers, chutes and conveyors, pulleys and drive mechanism
  • Ball mills and the drive train arrangement
  • Pressure Leach Autoclaves inspections and service that included huge agitators and drive gearboxes service
  • Burgmann Mechanical Seals serves and re-kiting Boiler inspections and service that included Boilers annual overhauls and hydraulic pressure testing
  • Expansion project management, capex and working cost budget management and effective costs control plan
  • Managing Continual Improvement Plan and subordinates developmental plan to uplift engineering standards and curb re-work
  • Ensuring implementation of effective planned and corrective maintenance system that is value adding thereby realizing reduction of costly breakdowns
  • Ensuring that mandatory inspection of critical equipment like pressure vessels and lifting equipment and critical structural integrity tests and transformer maintenance are effectively carried out and adhered to
  • Ensuring enforcement of Safety, Health and Environment implementation by cultivating a culture that observes and understands Risk Assessment to be the first step to take before carrying out any work related activity both at work and outwork premises in our day to day lives
  • I enjoy planning and believe that targets are easily met by the one who plans properly without stressing and usually at very minimum cost

References

  • Fungai, Mujuru, General Manager, +263716246012, Bindura Nickel Corporation
  • Realer, Thuso Nare, Director, +2677772399, Oska Investments & Quarries (Pty) Ltd

Awards

Resolved failure problem on mechanical seals (Burgmann Seals) for Pressure Leach Autoclaves agitators that had blown the annual budget for the year 2000 in less than two months which proved too costly to maintain as these were being re-kited in South Africa. I designed a tool to re-kit them ourselves successfully and trained the maintenance team on how to re-kit using the designed re-kiting tool. Achieved a merit award for myself and the team., Improved the packing arrangement for the warman and envirotech pumps a move that enabled the department to reduce downtime drastically as the original design would need one to remove part of the volute entirely to be able to work on the stuffing box of the pumps. Availability of the pumps improved and high production started to be realized. Achieved a merit award for this innovative approach as the constriction arrangement on the pumps is by design., Was seconded to the Concentrator Plant in 2003 after the department had a record of breakdowns that drove the entire organization into serious cash flow problems due to reduced production levels. Since I was running the Refinery plant that had an excellent externally audited maintenance system as per our Quality Assurance (QA) ISO-9000 standard requirement the senior management seconded me to the Concentrator plant. In 5-6 months’ production targets were met exceedingly and bonuses were awarded., In 2004 after a year at Concentrator still with BNC, I was Re-called back to Refinery because of numerous plant equipment breakdowns in this department. The reason was that the workforce tended to ignore planning and relaxed on monitoring of Key Performance Indicators (KPIs) until such a time things were out of control which led to resorting to Fire Fighting. This problem was serious due to Refinery being the processing plant for the final product. I went back to Refinery with all the confidence to turn things around and it was up and running in 6 – 8 months. Was awarded a merit award and made a name within the organization.

Affiliations

Have been member of the Association of Mining Engineers – Zimbabwe

GREATEST REGRET

It is regrettable to note that we live in a world with such incredible pressure to succeed, with so many demands for ourselves to survive especially the working class that more often than not, our hopes and dreams become casualties. In 2000 – 2001 my Degree programme registered with British Council of Engineers through the University of Zimbabwe was abandoned when we were almost getting to the final year because of the problems that were beyond our control. However, the knowledge gained during the best part of the course that I had attended made a tremendous difference in resolving engineering related issues at my work place. I am proud to mention that through diligence, well focused ambitions and perseverance I am achieving my goals continuously with the divine intervention, since those who seek from God with faith above all odds will be catered for.

ACHIEVEMENTS

  • Successfully constructed a 70MW diesel power plant together with APR –Energy plc some 30 km on the outskirt of Francistown in Botswana. (from Sept.– 2009 to early 2010)
  • Implemented successfully a planned maintenance programme at Mopani Galane Gold Mine that saw the Gold Mine exceeding the set annual production target. (year 2010 - 2011)
  • Competently and successfully carried out an expansion project for Morupule Colliery Plant together with S.M.E.I – Projects. (from Feb. 2011 to March 2012)
  • Competently and successfully carried out a construction project for a new Diamond Mine – AK6 Boteti Diamond Mine near Lethlakane in Botswana with S.M.E.I – Projects. (from July 2011 to May 2012)
  • Competently and successfully carried out an expansion project at Monak Venture Diamond Mine – BK11 Lethlakane area as Runicta Engineering Contractors (Pty) Ltd by its self. (Sept.2011 to Jan.2012)
  • Refurbished the entire concentrator plant production process equipment that had been made redundant when the plant was shut down for a period of five years and successfully re-commissioned the plant for production operation purposes. (2013 – 2014)

Timeline

Installation Project

APR Energy
03.2015 - 03.2017

Resident Engineer

Trojan Nickel Mine
01.2007

Executive Director

Runicta Young Engineering Contractors (Pty) Ltd
01.2007 - Current

Section Engineer

Bindura Nickel Corporation
01.2004 - 01.2006

Engineering Foreman

Bindura Nickel Corporation
01.1996 - 01.2003

Senior Maintenance Artisan

Bindura Nickel Corporation
01.1989 - 01.1995

Acting Charge-hand

Sable Chemical Industry Ltd
01.1987 - 10.1989

Senior Plant Equipment Maintenance Artisan

Sable Chemical Industry Ltd
01.1984 - 01.1987

Apprenticeship Training Program

Sable Chemical Industries Ltd
01.1980 - 01.1984

Certificate of Competence in Quality Management System Internal Audit (ISO 9001: 2000) - undefined

PIMS Management by Standards (Pvt) Ltd

Internal Environmental Management Systems Auditing Certificate (EMS) - undefined

PIMS Management by Standards (Pvt) Ltd

Middle Management Development Programme (MMDP) - undefined

OTD

British Engineering Council Programme - Mechanical Engineering Degree Program

University of Zimbabwe

Principals of Training and Training of Trainers - undefined

CTU – Anglo American Corporation of South Africa Ltd

Higher National Diploma (HND) - Mechanical Engineering

Harare Poly-Technical College

Advanced City & Guilds Certificate - Mechanical Engineering Trade

Bulawayo Technical College

Masters in Project Management (MSc-PM) -

University of Salford
Emmanuel Rumhuma