Specializes in team leadership, conflict resolution, and operational oversight. Proven communication and problem-solving skills enhance operational efficiency and workplace harmony. Committed to fostering positive work environments and achieving organizational goals through effective supervision and hands-on staff engagement.

Overview

15
15
years of professional experience

Work History

Piping Supervisor

Field Force Solutions
De Soto, KS
07.2024 - 06.2025
  • Company Overview: Panasonic.
  • Oversee and install all high purity piping for Anode and Cathode mixing rooms.
  • Identify pipe systems for commissioning.
  • Helped create Standard Operating Procedure for Beck & Pollitzer LOTO/Safety department.
  • Identify/confirm lock out points, valve stations and any potential electrical hazards and/or potential energy sources.
  • Ensure all affected employees are trained and have proper LOTO equipment.
  • Direct and supervise lockout locations, ensure systems are energy free, preform and log pressure test.

Process Pipe Assistant Superintendent

Southern Piping Company
Florence, SC
04.2024 - 07.2024
  • Company Overview: BMW Battery Plant.
  • Responsible for all process water piping.
  • Inspected sites before and after construction projects.
  • Coordinated phases of construction projects from inception to completion.
  • Eliminated project lags by organizing work-in-progress and delegating tasks.
  • Led daily Tier Program for production with both client and company.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Recruited and hired workers, in addition to supervising and monitoring daily performance.
  • Allocated material and labor resources to promote on-time and under-budget project completion.
  • Kept detailed progress records to hit strict deadlines and adjust plans.
  • Used Procore, GTP Stratus, ACC, Egnyte and Autodesk for daily production tracking and file sourcing.

Piping General Foreman

W.G. Yates Construction
Stanton, TN
10.2023 - 01.2024
  • Company Overview: Ford BOC Battery Plant.
  • Oversaw installation of Pump Houses 1-4.
  • Managed material inventory and ordered supplies for ongoing projects efficiently.
  • Facilitated communication between field teams and office personnel for project updates.
  • Collaborated with engineers to resolve technical challenges during installation processes.
  • Coordinated with project managers to ensure timely completion of piping projects.
  • Conducted inspections to verify compliance with industry standards and regulations.

Mechanical Foreman

Brycon
Phoenix, AZ
04.2023 - 08.2023
  • Company Overview: TSMC.
  • Supervised daily operations and workflow of mechanical teams on construction sites.
  • Coordinated equipment and material deliveries to ensure project readiness.
  • Trained team members on safety protocols and equipment usage standards.
  • Collaborated with project managers to develop efficient work schedules.
  • Ensured quality control through systematic checks of mechanical installations.
  • Led meetings to communicate updates and address team concerns effectively.
  • Coordinated with other departments such as production and quality control in order to ensure smooth installation of machinery and equipment.
  • Clean room environment lvl 4.

Mechanical Foreman

W.G. Yates Construction
Mountain Pass, CA
06.2022 - 04.2023
  • Company Overview: MP Materials.
  • Coordinated work schedules for crew members to optimize productivity and efficiency.
  • Assigned projects and tasks to employees based on competencies and specialties.
  • Reported daily progress and reports directly to General Foreman.
  • Managed inventory of materials, tools, and equipment for ongoing projects.
  • Organized the storage of supplies, tools and equipment used in the course of construction activities.
  • Trained new employees on safety protocols and operational procedures.
  • Led team meetings to discuss project progress and address any concerns promptly.
  • Worked with suppliers to keep materials flowing and meet demanding timelines.
  • Responsible for leading crew in completion of phase 2 at MP Materials which included: Installation of PRND refinery.
  • Completed piping systems that included SS, CS, CPVC, PP and Duplex SS.

Pipe Welder/Fitter

Dewine Mechanical
York, NE
04.2021 - 01.2022
  • Company Overview: Greenplains Energy
  • Interpreted blueprints to determine pipe specifications and layout.
  • Fabricated pipes, fittings, valves, and related equipment in accordance with specifications.
  • Verified that all necessary joints were properly fitted before welding process began.
  • Cleaned and prepared surfaces of metal components prior to welding.
  • Completed skilled welds on pressure-tested pipe in installations.
  • Maintained a clean work area by removing debris and cleaning up spilled materials.
  • Measured workpieces with straightedges or templates to conform with specifications.

Pipefitter

Phoenix Industrial
Hillsboro, OR
02.2019 - 03.2021
  • Company Overview: Intel
  • Intel ASU Unit
  • Measure, cut, thread, groove, bend and install piping according to specifications.
  • Measured and marked pipes for cutting and threading.
  • Drilled and tapped holes for valve installation.
  • Assemble and secure pipes by welding joints using TIG process,
  • Collaborated with crane operators to ensure precise load movements.
  • Inspected rigging equipment for defects and damage prior to use.
  • Provided assistance in selecting appropriate rigging hardware based on size and weight requirements for each specific project.
  • Attached loads securely onto lifting devices such as chains or cables using various types of clamps or hooks.

Mechanical Supervisor

RAM Enterprise
10.2018 - 11.2018
  • Company Overview: Kennecott
  • Oversee maintenance on ball mills, sag mills and rock crushers.
  • Replace and install various equipment and machinery.
  • Monitored daily operations to ensure that all tasks were completed in a timely manner.
  • Ensured that all employees followed safe working practices while operating machinery.

Mechanical Millwright Foreman

TeIC
Yerington, NV
05.2018 - 10.2018
  • Company Overview: Nothern Copper
  • Align 10t motors and pumps using dial indicators and feeler gauges.
  • Layout and set elevations for equipment using transit and/or theodolite.
  • Set fans and blowers for exhaust systems.
  • Supervised the assembly and installation of conveyor sensors.
  • Supervised installation and maintenance of machinery and equipment.
  • Operated precision tools to perform repairs and installations.
  • Calibrated measuring instruments such as micrometers and calipers used in the machining process.

Pipe Welder

L&M Ethanol
Ft. Dodge, IA
03.2018 - 05.2018
  • Company Overview: Cargill
  • Maintained cleanliness of work area at all times.
  • Welded and worked with stainless steel and various alloys.
  • Completed skilled welds on pressure-tested pipe in installations.
  • Avoided errors by carefully reading blueprints and specifications to correctly lay out parts and plan welding processes.
  • Prepared surfaces by grinding and cleaning them before welding.
  • Utilized hoists, cranes and other lifting devices when necessary for moving heavy objects around the job safely.
  • Followed strict safety protocols while working on site.

Mechanical Millwright

Pro Energy Services
02.2017 - 03.2018
  • Company Overview: Mid-Mo Energy. Show-Me Ethanol.
  • Demo existing distillation line.
  • Removed debris and hazardous materials following safety protocols and regulations.
  • Maintained tools and equipment, ensuring they were in good working condition daily.
  • Communicated with supervisors regarding project progress and any safety concerns encountered.
  • Used protective gear such as hard hats, goggles, ear protection, respirators when necessary.

Pipe Welder

Phoenix Industrial
Eureka, NV
03.2015 - 02.2017
  • Company Overview: McEwinn Gold Bar Mine Co.
  • Set up welding machines based on the job at hand.
  • Gathered required materials for each project.
  • Detected faulty operation of equipment or defective materials and notified supervisors.
  • Welded components in flat, vertical, or overhead positions.
  • Prepared material surfaces for welding by removing scale, rust or other foreign matter.

Mechanical Millwright

SBI
Canton, OH
05.2012 - 08.2014
  • Com Overview: Cargill
  • Operated pumps to transfer fluids safely and efficiently.
  • Collaborated with management to improve operational processes and efficiency.
  • Cleaned strainers, filters, tanks, piping systems, and other related components.
  • Maintained accurate records of operations for reporting purposes.
  • Verified that all fluid levels were within acceptable limits prior to start-up.
  • Operated and monitored pumps to ensure proper functioning.
  • Coordinated with vendors regarding supply orders for replacement parts.
  • Monitored gauges and flowmeters to inspect equipment and reported abnormalities.

Pipefitter

Three Rivers
Clarksville, TN
04.2011 - 11.2011
  • Company Overview: Intel.
  • Measure, cut, thread, groove, bend and install piping according to specifications.
  • Use hand tools such as saws, drills, wrenches, threaders, to perform tasks related to the job at hand.
  • Observed safe work rules and utilized fall protection and PPE.
  • Read blueprints and diagrams to determine the type of pipe and tools needed for each job.
  • Measured and marked pipes for cutting and threading.
  • Threaded and installed pipe using pipe wrench and dies.
  • Adjust flow rates within specified limits by changing valve positions or altering lengths of pipe sections.

Pipefitter / Welder Helper

Imcor
Chandler, AZ
04.2010 - 02.2011
  • Company Overview: Intel.
  • Installed various piping systems in commercial and industrial settings.
  • Interpreted blueprints and technical drawings for accurate installations.
  • Measure, cut, thread, groove, bend and install piping according to specifications.
  • Observed safe work rules, utilized fall protection and PPE.

Education

Grand River Welding Institute
01.2013

Bachelors of Science - Psychology

Texas Christian University
01.2009

Skills

  • Production supervision
  • Team leadership
  • Time management
  • Training and development
  • Task delegation
  • Employee motivation
  • Decision-making
  • Operations management
  • Project planning
  • Analytical thinking
  • Workflow management
  • Project management
  • Coaching and mentoring
  • Policy enforcement
  • Staff development
  • Adaptability and flexibility

Training Courses Attended

  • NCCER Pipe Fitting
  • Swagelok Tube Bending
  • LOTO
  • Hilti Powder Actuated
  • Rough Terrain Forklift
  • CPVC procedures
  • Polypropylene Fusing
  • Viega Mega/ProPress

Timeline

Piping Supervisor

Field Force Solutions
07.2024 - 06.2025

Process Pipe Assistant Superintendent

Southern Piping Company
04.2024 - 07.2024

Piping General Foreman

W.G. Yates Construction
10.2023 - 01.2024

Mechanical Foreman

Brycon
04.2023 - 08.2023

Mechanical Foreman

W.G. Yates Construction
06.2022 - 04.2023

Pipe Welder/Fitter

Dewine Mechanical
04.2021 - 01.2022

Pipefitter

Phoenix Industrial
02.2019 - 03.2021

Mechanical Supervisor

RAM Enterprise
10.2018 - 11.2018

Mechanical Millwright Foreman

TeIC
05.2018 - 10.2018

Pipe Welder

L&M Ethanol
03.2018 - 05.2018

Mechanical Millwright

Pro Energy Services
02.2017 - 03.2018

Pipe Welder

Phoenix Industrial
03.2015 - 02.2017

Mechanical Millwright

SBI
05.2012 - 08.2014

Pipefitter

Three Rivers
04.2011 - 11.2011

Pipefitter / Welder Helper

Imcor
04.2010 - 02.2011

Grand River Welding Institute

Bachelors of Science - Psychology

Texas Christian University