Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Awards
Generic

Eric Erickson

Goodyear,Az

Summary

Results-driven leader with strong background in strategic management and organizational growth. Skilled in developing and implementing effective business strategies, optimizing processes, and driving team performance. Known for adaptability, effective collaboration, and delivering measurable outcomes in dynamic environments. Strong communication and problem-solving abilities, coupled with focus on fostering productive and positive team culture.

Overview

37
37
years of professional experience

Work History

Engineering Director Common Engineering

ASM
01.2024 - Current
  • Created common components library that meet all performance and cost targets that can be used a cross multiple products in the company
  • Reduced gas box component costs by 20%
  • Reduced the number of unique part numbers by 50%
  • DFx assessment that resulted in multiple cost reduction projects
  • Developed test equipment to ensure zero supplier defects

Director New Product Introduction

ASM
05.2022 - 12.2023
  • Lead cross functional team and created labor reduction plan - reduced labor hours by 56% - Saved company >2M €
  • Utilized lean principles, work cell set up, tooling, test fixtures to enable modular testing, appropriate outsourcing
  • Managed a global manufacturing engineering staff of 34 people
  • Provided team with guidelines for handing off products from engineering to mfg
  • Mentored junior staff, fostering skill development and promoting a culture of continuous improvement.

Sr. Director Operations

Applied Engineering
06.2018 - 05.2022
  • Guided organization to record shipments 18M to 27M during the last four years
  • Instilled process discipline by championing continuous improvement
  • Improved quality and customer satisfaction on key customer product line
  • Implemented process checks and increased testing
  • Embarked on program to upgrade operations talent
  • Coordinated facilities expansion to support new customers
  • Directed cross-functional teams to enhance product development processes and reduce time-to-market.
  • Implemented strategic initiatives that boosted operational efficiency and improved project delivery timelines.

Manager Manufacturing/New Product Introduction e-beam division

KLA-Tencor Corp.
04.2010 - 02.2018

N+1 Program (>80% new hardware), NPI Lead

· Directed cross-functional teams to improve operational efficiency and optimize process workflows.

· Developed comprehensive product launch strategies.

· Oversaw supplier quality initiatives, achieving high MTBI (Mean Time Between Incidents).

· Conducted extensive engineering characterization to ensure reliability.

· Led system and subsystem diagnostics efforts.

· Assumed leadership of an underperforming team and significantly improved performance.

· Established high standards and optimized team composition.

· Fostered a culture of ownership regarding successful product transitions.

· Senior management recognized the team's achievements.

· The NPI process was highlighted as exemplary for other divisions.

Partial List of Accomplishments:

· Managed the introduction of the eDR-7200 product, including high voltage power supplies, electron optics lens, and laser OM.

· Developed and executed effective product transition plans.

· Designed upgrade and installation plans.

· Created and supported manufacturing training programs, ensuring resource alignment.

· Verified documentation through collaboration with manufacturing and suppliers.

· Led certification processes confirming design engineering deliverables to manufacturing.

· Supervised development of manufacturing processes for building and testing laser microscope systems.

· Oversaw the largest engineering material ramp in KLA history, coordinating orders for over 20 kits and managing $2 million in inventory.

· Collaborated with design engineering to implement cable tray cleaning procedures for in-house operations.

· Established supplier protocols, cleanroom environments, and tooling requirements.

· Documented processes and delivered comprehensive training before transitioning to manufacturing.

· Provided manufacturing engineering support to electron optics suppliers.

· Conducted numerous failure analyses with suppliers, implementing effective corrective actions.

· Improved gold debond reliability by modifying undercoat thickness, preventing customer-impacting failures.

· Enhanced supplier soldering competency through targeted training.

· Utilized SPC methodologies to refine supplier specifications.

· Oversaw installation of new column test stands with upgraded electronics; enhanced two additional test stands.

· Developed a column reference mirror test fixture, fully eliminating quality escapes.

· Implemented strategic initiatives to elevate product quality and customer satisfaction.

· Effectively managed resource allocation, aligning operational needs with strategic objectives for superior performance.+1 Program (>80% new hardware) NPI lead

  • Led cross-functional teams to enhance operational efficiency and streamline processes.
  • Developed product introduction plan that would create a successful product launch
  • Supplier Quality
  • High MTBIsw
  • Extensive engineering characterization
  • Reliability
  • System and sub system diagnostics
  • Took over a team that was under performing and turned around team performance
  • Set high expectations and got rid of dead wood
  • Instilled ownership of product transition success into the team
  • Team performance was acknowledged by Sr. management
  • NPI process was seen as a model for other divisions to follow
  • Led team that introduced the eDR-7200 product (high voltage power supplies, electron optics lens, laser OM)
  • Created product transition plan
  • Created upgrade and install plans
  • Created manufacturing training plan and ensured resources supported the plan
  • Ensured all documents created and verified by manufacturing and suppliers
  • Led team that was responsible for certifying that design engineering completed their deliverables to manufacturing
  • Managed team responsible for developing manufacturing process to build and test laser microscope system

Managed largest engineering material ramp in KLA history

  • Over 20 kits ordered
  • $2 million in inventory
  • Collaborated with design engineering to establish cable tray cleaning process for in house cleaning
  • Set up supplier process, clean room and tooling
  • Documented process, trained and handed off process to manufacturing
  • Supervised manufacturing engineering production support for electron optics supplier
  • Conducted numerous FA’s with supplier and implemented corrective actions
  • Changed under coat thickness to eliminate gold debond failures – caught and corrected problems before failures reached customers
  • Improved supplier solder training
  • Used SPC to tighten supplier specs
  • Team installed new column test stand with updated electronics and upgraded two other test stands.
  • Developed column reference mirror test fixture – completely eliminated quality escapes
  • Developed and implemented strategic initiatives to improve product quality and customer satisfaction.
  • Managed resource allocation, balancing operational needs with strategic priorities for optimal performance.


eS35 Production Manager

KLA-Tencor Corp.
01.2007 - 04.2010
  • Responsible for on time tool shipments
  • Drove process discipline
  • Reduced cycle time from 16 weeks to 13 weeks

eDR-5200 Production manager

KLA-Tencor Corp.
01.2006 - 01.2007
  • Drove process discipline
  • Implemented quality check list adherence
  • Insisted on process documentation
  • Implemented corrective action meetings with team
  • Implemented several corrective actions to ensure quality shipments
  • Responsible for on time shipments
  • Shipped over 30 systems reduced cycle time from 100 days to 60 days in one year

Project manager

KLA-Tencor
02.2004 - 01.2006
  • Tasked with eliminating EFEM related issues on CDSEM products
  • Eliminated EFEM issues from the failure pareto
  • Developed new end-effector with supplier
  • Reduced backside particle count and allowed shipment to AMD

Manufacturing engineer

KLA-Tencor Corp.
01.2004 - 01.2006
  • Promoted to production manager due to excellent support of the production floor
  • Conducted EFEM testing to qualify Phoenix 1.3 handler
  • Conducted tests, managed tool time and wrote test report

Facilities engineering

Headway Technologies
05.2003 - 02.2004
  • Worked with trades to plan and execute fab expansion

Senior System engineering

Olympus-ITA
01.2002 - 01.2003
  • Installed, tested and qualified beta level microscope inspection equipment
  • Solved vibration problem that was preventing production use of defect detection system
  • Designed custom hardware features that enabled customers to more effectively use their microscope system

System Engineering Manager

Watkins Johnson
01.1996 - 01.2002
  • Supported the development of next generation CVD product
  • On site beta support
  • Lead team that was supporting two shift operation

Turbomachinery Development Engineer

Rockwell International
01.1989 - 01.1995
  • Rocket engine test data expert
  • Able to diagnose hardware problems from test data
  • Frozen lift off seal drain line, pump cavitation, combustion chamber leaks
  • Analysis of rocket failure published in failure report

Education

Bachelor of Science - Mechanical Engineering

California State University, Fresno
Fresno, CA
06-1989

Skills

  • New Product Introduction - NPI
  • Production management
  • Effective team cohesion
  • Strategic planning
  • Supplier process development
  • Verbal and written communication
  • Collaborative decision-making

Accomplishments

Silver Snoopy Award for empirical analysis of turbine inlet sheet metal crack growth

Chairman’s Award for eDM sheet metal design turbine inlet sheet metal reduced weld count by 80%

GM Team award – eDR-5200 Upgrade Team

GM Team award - eDR-5200 Procedure Creation Team

GM Team award – eDR-5200 Image quality

GM Team award – eDR-7280 Product Introduction

Timeline

Engineering Director Common Engineering

ASM
01.2024 - Current

Director New Product Introduction

ASM
05.2022 - 12.2023

Sr. Director Operations

Applied Engineering
06.2018 - 05.2022

Manager Manufacturing/New Product Introduction e-beam division

KLA-Tencor Corp.
04.2010 - 02.2018

eS35 Production Manager

KLA-Tencor Corp.
01.2007 - 04.2010

eDR-5200 Production manager

KLA-Tencor Corp.
01.2006 - 01.2007

Project manager

KLA-Tencor
02.2004 - 01.2006

Manufacturing engineer

KLA-Tencor Corp.
01.2004 - 01.2006

Facilities engineering

Headway Technologies
05.2003 - 02.2004

Senior System engineering

Olympus-ITA
01.2002 - 01.2003

System Engineering Manager

Watkins Johnson
01.1996 - 01.2002

Turbomachinery Development Engineer

Rockwell International
01.1989 - 01.1995

Bachelor of Science - Mechanical Engineering

California State University, Fresno

Awards

  • Silver Snoopy Award for empirical analysis of turbine inlet sheet metal crack growth
  • Chairman’s Award for eDM sheet metal design turbine inlet sheet metal reduced weld count by 80%
  • GM Team award – eDR-5200 Upgrade Team
  • GM Team award - eDR-5200 Procedure Creation Team
  • GM Team award – eDR-5200 Image quality
  • GM Team award – eDR-7280 Product Introduction