Summary
Overview
Work History
Skills
Timeline

Eric Jones

West Olive,MI

Summary

I went through a 4 year apprenticeship program. Adept Journeyman Boilermaker with a proven track record at Local 169, enhancing project delivery by integrating new technologies and fostering team collaboration. Skilled in GTAW, GMAW, SMAW, torch cutting, plasma cutting, demonstrating exceptional problem-solving abilities, I have significantly improved fabrication efficiency and mentored apprentices ensuring projects meet stringent quality standards.

Overview

24
24
years of professional experience

Work History

Journeyman Boilermaker

Local 169
11.2000 - Current
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Maintained compliance with all safety procedures from both client and employer.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Inspected equipment and structures to determine scope of work (SOW).
  • Built and repaired process tanks, storage tanks and water treatment tanks.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Interpreted blueprints, sketches, and specifications for each job.
  • Promoted a culture of continuous improvement within the team, consistently seeking ways to enhance processes and performance standards.
  • Upheld company reputation for excellence by consistently delivering high-quality workmanship that met or exceeded client expectations.
  • Inspected equipment, structures and materials to identify cause of errors.
  • Served as a reliable mentor to new hires, providing guidance and support during their onboarding process.
  • Improved fabrication efficiency, integrating new technologies and techniques into daily operations.
  • Enhanced team efficiency by leading and coordinating fabrication of boiler parts.
  • Reduced potential hazards on-site, enforcing strict compliance with safety protocols and regulations.
  • Reduced project lead times, skillfully managing resources and schedules to meet tight deadlines.
  • Enhanced team collaboration, effectively managing communication between different departments and stakeholders.
  • Boosted team morale and efficiency, providing hands-on training and mentorship to junior boilermakers.
  • Contributed to project success, delivering components that met stringent quality standards.
  • Utilized specialized tools and machinery to complete repairs and installation.
  • Adjusted and calibrated controls to enhance optimal efficiency.
  • Assembled and installed boilers, tanks and vats according to blueprints and specifications.
  • Enhanced project coordination, liaising effectively with engineers and project managers to clarify requirements.
  • Used power hammers or weld pressure vessel tubes to achieve leakproof joints.
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Achieved significant improvements in project delivery times, organizing work schedules to adapt to changing priorities.
  • Skilled at working independently and collaboratively in a team environment.

Skills

  • Hand and power tools
  • Structural steelwork
  • Oxy-Fuel Cutting
  • Gas Tungsten Arc Welding
  • Plasma cutting
  • Material prepping
  • Flux-Cored Arc Welding
  • Repair work
  • Carbon Arc Gouging
  • Rigging
  • Parts and components fabrication
  • Pipe cutting
  • Tube installation
  • Metal cutting
  • Arc welding
  • Gas Metal Arc Welding
  • Shielded Metal Arc Welding
  • Teamwork and Collaboration
  • Problem-Solving
  • Time Management
  • Torch cutting
  • Excellent Communication
  • Critical Thinking
  • Organizational Skills
  • Active Listening
  • Decision-Making
  • Metal Fabrication
  • Team Coordination
  • Self Motivation
  • OSHA Standards
  • Written Communication
  • Precision measurement

Timeline

Journeyman Boilermaker - Local 169
11.2000 - Current
Eric Jones