Summary
Overview
Work History
Education
Skills
Timeline
Generic

Eric Mancilla

Granger,TX

Summary

Accomplished Journeyman Lineman with extensive experience at Hawthorne Construction, specializing in electrical power line installation and storm damage repair. Proven ability to enhance operational efficiency through effective teamwork and advanced problem-solving skills, achieving significant reductions in outage durations while ensuring strict adherence to safety protocols.

Experienced lineman proficient in bucket truck operation, storm damage repair, and electrical power line installation. Committed to safety compliance and team collaboration, consistently delivering reliable service and effective solutions.

Overview

28
28
years of professional experience

Work History

Lineman

Hawthorne Construction
Beebe, AR
06.2022 - 11.2025
  • Installed and maintained overhead and underground power distribution systems.
  • Conducted safety inspections and ensured compliance with industry regulations.
  • Collaborated with team members to troubleshoot electrical issues efficiently.
  • Trained junior linemen on safe work practices and technical skills.
  • Led projects for new service installations, coordinating resources and timelines.
  • Developed standard operating procedures to enhance operational efficiency and safety.
  • Mentored staff on advanced techniques in line construction and maintenance.
  • Implemented process improvements that reduced downtime during outages and repairs.
  • Trained new team members in proper procedures, fostering a safe and efficient work environment.
  • Assisted in emergency storm restoration efforts, restoring power to affected communities as quickly as possible.
  • Participated in ongoing training programs to stay current on industry trends and best practices.
  • Improved workplace safety by conducting regular equipment inspections and maintenance.
  • Reduced outage durations with quick response times and effective troubleshooting skills.
  • Maintained a strong safety record by diligently adhering to OSHA regulations and company policies, ensuring the well-being of both team members and the public.
  • Utilized advanced diagnostic tools to identify issues in power lines, ensuring timely repairs and minimal downtime.
  • Contributed to positive teamwork dynamics by effectively communicating with colleagues and supervisors throughout project lifecycles.
  • Effectively managed multiple projects simultaneously, prioritizing tasks based on urgency and impact on overall operations.
  • Collaborated with cross-functional teams to complete large-scale projects on time and within budget.
  • Completed complex installations for major power distribution projects, ensuring adherence to industry standards.
  • Conducted thorough pre-construction assessments to identify potential challenges before beginning work on-site, preventing delays during project execution stages.
  • Maintained accurate records of completed tasks, contributing to streamlined operations.
  • Provided excellent customer service during service calls, addressing concerns promptly and professionally.
  • Adhered to strict safety protocols while working at heights or near energized equipment, minimizing accidents on the job site.
  • Coordinated with utility partners during joint infrastructure projects, facilitating smooth communication channels between teams resulting in successful outcomes.
  • Enhanced system reliability through efficient diagnosis and repair of electrical faults.
  • Supported the development of new processes for increased efficiency in line construction and maintenance activities.
  • Streamlined project completion times, leading teams in construction and maintenance of electrical distribution systems.
  • Strengthened community relations, participating in public education on electrical safety and energy conservation.
  • Improved team morale, fostering collaborative work environment and recognizing individual contributions.
  • Minimized environmental impact with careful planning and execution of line installations in sensitive areas.
  • Expedited power restoration efforts after natural disasters, mobilizing and directing emergency response teams.
  • Enhanced service reliability, conducting detailed risk assessments and implementing mitigation strategies.
  • Strengthened infrastructure resilience, upgrading and retrofitting older lines and equipment to withstand adverse weather.
  • Optimized resource use, effectively managing materials and tools inventory for field operations.
  • Maintained strict compliance with industry regulations and standards, ensuring all work met quality and safety benchmarks.
  • Improved team efficiency with rigorous adherence to safety protocols during high-risk operations.
  • Facilitated smoother operations, efficiently coordinating with engineers and ground support teams on complex projects.
  • Achieved significant reductions in equipment failure rates, implementing proactive maintenance schedules.
  • Boosted network reliability, conducted thorough inspections, and maintenance of power lines and equipment.
  • Ensured continuous power supply by meticulously maintaining and repairing overhead and underground power lines.
  • Enhanced operational safety, providing comprehensive safety training and mentorship to new linemen.
  • Increased network capacity, participating in upgrade and expansion of electrical infrastructure.
  • Elevated customer satisfaction by restoring power quickly after storm-related disruptions.
  • Reduced downtime during outages, swiftly locating and repairing faults in power distribution network.
  • Reduced incident response times, leveraging advanced diagnostic tools and techniques for rapid fault detection.
  • Worked on both dead and energized lines.
  • Removed old poles and hardware and replaced with new equipment.
  • Enhanced public safety by promptly responding to emergency outages and hazardous situations.
  • Performed maintenance and reconducting work in varied weather conditions.
  • Installed and maintained overhead and underground electrical power lines and auxiliary equipment.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Installed, spliced and maintained overhead and underground power lines for residential and commercial customers.
  • Inspected power lines for any damage or irregularities and replaced components.
  • Followed all safety protocols and regulations while working at height and with live electricity.
  • Enforced adherence to industry best practices, safety protocols and proper installation techniques.
  • Responded to emergencies and outages that required additional labor and assistance for repairs.
  • Performed powerline maintenance by cleaning and lubricating components and replacing worn parts.
  • Assisted with constructing new power lines by using appropriate tools and equipment.
  • Observed company safety rules and regulations to minimize workplace accidents and reduce electric shocks.
  • Recorded accurate measurements for installed new power lines and poles.
  • Inspected power lines and poles for signs of damage or wear, interference, and degradation, and reported findings to supervisor.
  • Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.

Journey Lineman

Greenstone Electric
New Braunfels, TX
02.2020 - 05.2022
  • Installed and maintained overhead and underground electrical distribution systems.
  • Performed troubleshooting on electrical equipment to ensure optimal performance.
  • Operated aerial lift trucks and other specialized tools for line work.
  • Collaborated with team members to enhance safety protocols during installations.
  • Provided training and mentorship to junior linemen on best practices and safety measures.
  • Evaluated work processes, implementing improvements to increase efficiency in service delivery.
  • Led project teams in executing complex installation tasks while adhering to regulatory standards.
  • Conducted inspections of electrical systems, ensuring compliance with industry regulations and safety codes.
  • Assisted with storm recovery efforts by removing debris and repairing damaged lines in the aftermath of severe weather events.
  • Managed inventory of necessary materials for job sites, ensuring timely access to required tools while minimizing costs associated with excess stock storage or transportation.
  • Increased efficiency in field operations by effectively utilizing equipment such as bucket trucks, digger derricks, and hand tools.
  • Maintained detailed records of daily tasks, inspections, and repairs, providing clear documentation for future reference and analysis.
  • Worked diligently to minimize downtime during scheduled maintenance activities on both residential streetlights and industrial power infrastructure installations.
  • Enhanced public safety by promptly addressing and resolving power outages caused by weather events or accidents.
  • Proactively identified opportunities for process improvements within the team, implementing changes that led to increased efficiency and improved service delivery.
  • Participated in after-hours call rotation schedule, providing prompt response times when needed most during emergencies or unexpected disruptions.
  • Performed comprehensive inspections of transmission lines, identifying potential issues early to prevent future service interruptions.
  • Maintained strict adherence to safety protocols, reducing workplace injuries and ensuring a secure work environment for all crew members.
  • Improved system reliability by maintaining and repairing overhead electrical lines and equipment.
  • Demonstrated dedication to ongoing skill development through participation in specialized training programs related to linework procedures, equipment operation, and safety protocols.
  • Led training sessions for apprentice linemen, sharing knowledge gained from years of experience in the field while fostering a supportive learning environment.
  • Ensured high-quality customer service by restoring power quickly and efficiently during emergency situations.
  • Utilized problem-solving skills to troubleshoot challenging situations involving damaged equipment or complex electrical systems.
  • Collaborated with team members to complete complex line construction projects on time and within budget constraints.
  • Contributed to the successful completion of new construction projects by installing transformers, switches, and other essential components.
  • Developed strong professional relationships with coworkers and supervisors, resulting in effective communication channels for project updates and feedback.
  • Supported community development initiatives through volunteer work on projects aimed at installing or upgrading public utilities infrastructure.
  • Assisted in the planning stages of large-scale projects by providing technical expertise regarding best practices for line installation and maintenance.
  • Worked on both dead and energized lines.
  • Removed old poles and hardware and replaced with new equipment.
  • Performed maintenance and reconducting work in varied weather conditions.
  • Installed and maintained overhead and underground electrical power lines and auxiliary equipment.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Installed, spliced and maintained overhead and underground power lines for residential and commercial customers.
  • Inspected power lines for any damage or irregularities and replaced components.
  • Followed all safety protocols and regulations while working at height and with live electricity.
  • Enforced adherence to industry best practices, safety protocols and proper installation techniques.
  • Responded to emergencies and outages that required additional labor and assistance for repairs.
  • Performed powerline maintenance by cleaning and lubricating components and replacing worn parts.
  • Assisted with constructing new power lines by using appropriate tools and equipment.
  • Observed company safety rules and regulations to minimize workplace accidents and reduce electric shocks.
  • Recorded accurate measurements for installed new power lines and poles.
  • Inspected power lines and poles for signs of damage or wear, interference, and degradation, and reported findings to supervisor.
  • Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.

Journey Lineman

B&B Electric
Mississippi
07.2017 - 01.2020
  • Installed and maintained overhead and underground electrical distribution systems.
  • Performed troubleshooting on electrical equipment to ensure optimal performance.
  • Operated aerial lift trucks and other specialized tools for line work.
  • Collaborated with team members to enhance safety protocols during installations.
  • Provided training and mentorship to junior linemen on best practices and safety measures.
  • Evaluated work processes, implementing improvements to increase efficiency in service delivery.
  • Led project teams in executing complex installation tasks while adhering to regulatory standards.
  • Conducted inspections of electrical systems, ensuring compliance with industry regulations and safety codes.
  • Assisted with storm recovery efforts by removing debris and repairing damaged lines in the aftermath of severe weather events.
  • Managed inventory of necessary materials for job sites, ensuring timely access to required tools while minimizing costs associated with excess stock storage or transportation.
  • Increased efficiency in field operations by effectively utilizing equipment such as bucket trucks, digger derricks, and hand tools.
  • Maintained detailed records of daily tasks, inspections, and repairs, providing clear documentation for future reference and analysis.
  • Worked diligently to minimize downtime during scheduled maintenance activities on both residential streetlights and industrial power infrastructure installations.
  • Enhanced public safety by promptly addressing and resolving power outages caused by weather events or accidents.
  • Proactively identified opportunities for process improvements within the team, implementing changes that led to increased efficiency and improved service delivery.
  • Participated in after-hours call rotation schedule, providing prompt response times when needed most during emergencies or unexpected disruptions.
  • Performed comprehensive inspections of transmission lines, identifying potential issues early to prevent future service interruptions.
  • Maintained strict adherence to safety protocols, reducing workplace injuries and ensuring a secure work environment for all crew members.
  • Improved system reliability by maintaining and repairing overhead electrical lines and equipment.
  • Demonstrated dedication to ongoing skill development through participation in specialized training programs related to linework procedures, equipment operation, and safety protocols.
  • Led training sessions for apprentice linemen, sharing knowledge gained from years of experience in the field while fostering a supportive learning environment.
  • Ensured high-quality customer service by restoring power quickly and efficiently during emergency situations.
  • Utilized problem-solving skills to troubleshoot challenging situations involving damaged equipment or complex electrical systems.
  • Collaborated with team members to complete complex line construction projects on time and within budget constraints.
  • Contributed to the successful completion of new construction projects by installing transformers, switches, and other essential components.
  • Developed strong professional relationships with coworkers and supervisors, resulting in effective communication channels for project updates and feedback.
  • Supported community development initiatives through volunteer work on projects aimed at installing or upgrading public utilities infrastructure.
  • Assisted in the planning stages of large-scale projects by providing technical expertise regarding best practices for line installation and maintenance.
  • Worked on both dead and energized lines.
  • Removed old poles and hardware and replaced with new equipment.
  • Performed maintenance and reconducting work in varied weather conditions.
  • Installed and maintained overhead and underground electrical power lines and auxiliary equipment.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Inspected power lines for any damage or irregularities and replaced components.
  • Followed all safety protocols and regulations while working at height and with live electricity.
  • Installed, spliced and maintained overhead and underground power lines for residential and commercial customers.
  • Enforced adherence to industry best practices, safety protocols and proper installation techniques.
  • Responded to emergencies and outages that required additional labor and assistance for repairs.
  • Performed powerline maintenance by cleaning and lubricating components and replacing worn parts.
  • Assisted with constructing new power lines by using appropriate tools and equipment.
  • Observed company safety rules and regulations to minimize workplace accidents and reduce electric shocks.
  • Recorded accurate measurements for installed new power lines and poles.
  • Inspected power lines and poles for signs of damage or wear, interference, and degradation, and reported findings to supervisor.
  • Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.

Journey Lineman

T&D Solutions
Mississippi
05.2013 - 08.2017
  • Installed and maintained overhead and underground electrical distribution systems.
  • Performed troubleshooting on electrical equipment to ensure optimal performance.
  • Operated aerial lift trucks and other specialized tools for line work.
  • Collaborated with team members to enhance safety protocols during installations.
  • Provided training and mentorship to junior linemen on best practices and safety measures.
  • Evaluated work processes, implementing improvements to increase efficiency in service delivery.
  • Led project teams in executing complex installation tasks while adhering to regulatory standards.
  • Conducted inspections of electrical systems, ensuring compliance with industry regulations and safety codes.
  • Assisted with storm recovery efforts by removing debris and repairing damaged lines in the aftermath of severe weather events.
  • Managed inventory of necessary materials for job sites, ensuring timely access to required tools while minimizing costs associated with excess stock storage or transportation.
  • Increased efficiency in field operations by effectively utilizing equipment such as bucket trucks, digger derricks, and hand tools.
  • Maintained detailed records of daily tasks, inspections, and repairs, providing clear documentation for future reference and analysis.
  • Worked diligently to minimize downtime during scheduled maintenance activities on both residential streetlights and industrial power infrastructure installations.
  • Enhanced public safety by promptly addressing and resolving power outages caused by weather events or accidents.
  • Proactively identified opportunities for process improvements within the team, implementing changes that led to increased efficiency and improved service delivery.
  • Participated in after-hours call rotation schedule, providing prompt response times when needed most during emergencies or unexpected disruptions.
  • Performed comprehensive inspections of transmission lines, identifying potential issues early to prevent future service interruptions.
  • Maintained strict adherence to safety protocols, reducing workplace injuries and ensuring a secure work environment for all crew members.
  • Improved system reliability by maintaining and repairing overhead electrical lines and equipment.
  • Demonstrated dedication to ongoing skill development through participation in specialized training programs related to linework procedures, equipment operation, and safety protocols.
  • Led training sessions for apprentice linemen, sharing knowledge gained from years of experience in the field while fostering a supportive learning environment.
  • Ensured high-quality customer service by restoring power quickly and efficiently during emergency situations.
  • Utilized problem-solving skills to troubleshoot challenging situations involving damaged equipment or complex electrical systems.
  • Collaborated with team members to complete complex line construction projects on time and within budget constraints.
  • Contributed to the successful completion of new construction projects by installing transformers, switches, and other essential components.
  • Developed strong professional relationships with coworkers and supervisors, resulting in effective communication channels for project updates and feedback.
  • Supported community development initiatives through volunteer work on projects aimed at installing or upgrading public utilities infrastructure.
  • Assisted in the planning stages of large-scale projects by providing technical expertise regarding best practices for line installation and maintenance.
  • Worked on both dead and energized lines.
  • Removed old poles and hardware and replaced with new equipment.
  • Performed maintenance and reconducting work in varied weather conditions.
  • Installed and maintained overhead and underground electrical power lines and auxiliary equipment.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Installed, spliced and maintained overhead and underground power lines for residential and commercial customers.
  • Inspected power lines for any damage or irregularities and replaced components.
  • Followed all safety protocols and regulations while working at height and with live electricity.
  • Enforced adherence to industry best practices, safety protocols and proper installation techniques.
  • Responded to emergencies and outages that required additional labor and assistance for repairs.
  • Performed powerline maintenance by cleaning and lubricating components and replacing worn parts.
  • Assisted with constructing new power lines by using appropriate tools and equipment.
  • Observed company safety rules and regulations to minimize workplace accidents and reduce electric shocks.
  • Recorded accurate measurements for installed new power lines and poles.
  • Inspected power lines and poles for signs of damage or wear, interference, and degradation, and reported findings to supervisor.
  • Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.

Journey Lineman

Pike Electric
North, SC
03.2007 - 04.2013
  • Installed and maintained overhead and underground electrical distribution systems.
  • Performed troubleshooting on electrical equipment to ensure optimal performance.
  • Operated aerial lift trucks and other specialized tools for line work.
  • Collaborated with team members to enhance safety protocols during installations.
  • Provided training and mentorship to junior linemen on best practices and safety measures.
  • Evaluated work processes, implementing improvements to increase efficiency in service delivery.
  • Led project teams in executing complex installation tasks while adhering to regulatory standards.
  • Conducted inspections of electrical systems, ensuring compliance with industry regulations and safety codes.
  • Assisted with storm recovery efforts by removing debris and repairing damaged lines in the aftermath of severe weather events.
  • Managed inventory of necessary materials for job sites, ensuring timely access to required tools while minimizing costs associated with excess stock storage or transportation.
  • Increased efficiency in field operations by effectively utilizing equipment such as bucket trucks, digger derricks, and hand tools.
  • Maintained detailed records of daily tasks, inspections, and repairs, providing clear documentation for future reference and analysis.
  • Worked diligently to minimize downtime during scheduled maintenance activities on both residential streetlights and industrial power infrastructure installations.
  • Enhanced public safety by promptly addressing and resolving power outages caused by weather events or accidents.
  • Proactively identified opportunities for process improvements within the team, implementing changes that led to increased efficiency and improved service delivery.
  • Participated in after-hours call rotation schedule, providing prompt response times when needed most during emergencies or unexpected disruptions.
  • Performed comprehensive inspections of transmission lines, identifying potential issues early to prevent future service interruptions.
  • Maintained strict adherence to safety protocols, reducing workplace injuries and ensuring a secure work environment for all crew members.
  • Improved system reliability by maintaining and repairing overhead electrical lines and equipment.
  • Demonstrated dedication to ongoing skill development through participation in specialized training programs related to linework procedures, equipment operation, and safety protocols.
  • Led training sessions for apprentice linemen, sharing knowledge gained from years of experience in the field while fostering a supportive learning environment.
  • Ensured high-quality customer service by restoring power quickly and efficiently during emergency situations.
  • Utilized problem-solving skills to troubleshoot challenging situations involving damaged equipment or complex electrical systems.
  • Collaborated with team members to complete complex line construction projects on time and within budget constraints.
  • Contributed to the successful completion of new construction projects by installing transformers, switches, and other essential components.
  • Developed strong professional relationships with coworkers and supervisors, resulting in effective communication channels for project updates and feedback.
  • Supported community development initiatives through volunteer work on projects aimed at installing or upgrading public utilities infrastructure.
  • Assisted in the planning stages of large-scale projects by providing technical expertise regarding best practices for line installation and maintenance.
  • Worked on both dead and energized lines.
  • Removed old poles and hardware and replaced with new equipment.
  • Performed maintenance and reconducting work in varied weather conditions.
  • Installed and maintained overhead and underground electrical power lines and auxiliary equipment.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Installed, spliced and maintained overhead and underground power lines for residential and commercial customers.
  • Inspected power lines for any damage or irregularities and replaced components.
  • Followed all safety protocols and regulations while working at height and with live electricity.
  • Enforced adherence to industry best practices, safety protocols and proper installation techniques.
  • Responded to emergencies and outages that required additional labor and assistance for repairs.
  • Performed powerline maintenance by cleaning and lubricating components and replacing worn parts.
  • Assisted with constructing new power lines by using appropriate tools and equipment.
  • Observed company safety rules and regulations to minimize workplace accidents and reduce electric shocks.
  • Recorded accurate measurements for installed new power lines and poles.
  • Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.
  • Inspected power lines and poles for signs of damage or wear, interference, and degradation, and reported findings to supervisor.

Journeyman Lineman

Pedernales Electric CoOp
Cedar Park, TX
03.1998 - 03.2007
  • Installed and maintained overhead and underground electrical distribution systems.
  • Performed troubleshooting and repairs on electrical infrastructure to ensure reliability.
  • Operated specialized equipment, including bucket trucks and digger derricks, for line work.
  • Collaborated with team members to execute safety protocols during high-voltage operations.
  • Conducted routine inspections of electrical lines to identify potential hazards or issues.
  • Trained junior linemen on best practices in safety and operational efficiency.
  • Improved workflow processes by implementing best practices in line installation techniques.
  • Led emergency response efforts during power outages to restore service promptly.
  • Constructed new power lines, contributing to the expansion and improvement of the electrical grid.
  • Restored power to thousands of customers following severe weather events, ensuring minimal downtime for affected areas.
  • Collaborated with other linemen to complete complex projects efficiently and within specified timeframes.
  • Assisted in the training of apprentice linemen, sharing knowledge and expertise to develop future industry professionals.
  • Repaired damaged equipment promptly with a focus on quality craftsmanship and long-lasting results for increased durability.
  • Supported ongoing infrastructure upgrades by replacing outdated poles, wires, insulators, transformers as part of planned initiatives.
  • Hooked up transformers to poles and lines.
  • Worked on both dead and energized lines.
  • Improved safety measures by conducting regular inspections of transmission and distribution systems.
  • Performed skilled aerial work using bucket trucks and climbing gear for efficient access to high-voltage equipment.
  • Removed old poles and hardware and replaced with new equipment.
  • Contributed to positive team dynamics through clear communication, collaboration, and mutual support among fellow linemen.
  • Installed transformers, switches, and other components to optimize system performance and minimize disruptions.
  • Performed maintenance and reconducting work in varied weather conditions.
  • Reduced outage durations by quickly diagnosing issues and implementing effective solutions in emergency situations.
  • Set ground anchors and guying systems for utility poles.
  • Prioritized safety by participating in regular team meetings, addressing potential hazards, and adhering to established procedures.
  • Conducted thorough assessments of storm-damaged systems for prompt repair or replacement recommendations.
  • Managed multiple tasks simultaneously under challenging conditions while maintaining accuracy and attention to detail in all work performed.
  • Maintained up-to-date knowledge of industry standards, regulations, and safety protocols, ensuring compliance at all times.
  • Ensured timely completion of assigned tasks through effective time management skills.
  • Analyzed preparation documents to correctly set up installations at job sites.
  • Enhanced system reliability by performing routine maintenance on electrical equipment and power lines.
  • Inspected and tested lines or cables, recording and analyzing test results to assess transmission characteristics and locate faults or malfunctions.
  • Strung cables between structures and lines from poles, towers, or trenches and pulled lines to proper tension.
  • Read and interpreted Type plans, prepared supplies and developed effective plan of action before beginning work.
  • Complied with legal regulations and company procedures to achieve high-quality performance in safe working environment.
  • Demonstrated commitment to customer satisfaction by addressing and resolving service-related issues promptly and professionally.
  • Streamlined workflow processes by organizing tools and materials effectively before commencing each project or task.
  • Measured pole attachments and completed proper fitting and construction according to NESC guidelines.
  • Accessed specific service areas to string lines and install terminal boxes, auxiliary equipment, or metering appliances.
  • Sought continuing education opportunities such as Type to refresh working knowledge and develop newest techniques such as Type.
  • Coordinated with utility companies during joint projects involving shared resources or overlapping service areas to ensure seamless execution.
  • Installed and maintained overhead and underground electrical power lines and auxiliary equipment.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Installed, spliced and maintained overhead and underground power lines for residential and commercial customers.
  • Inspected power lines for any damage or irregularities and replaced components.
  • Followed all safety protocols and regulations while working at height and with live electricity.
  • Enforced adherence to industry best practices, safety protocols and proper installation techniques.
  • Responded to emergencies and outages that required additional labor and assistance for repairs.
  • Performed powerline maintenance by cleaning and lubricating components and replacing worn parts.
  • Assisted with constructing new power lines by using appropriate tools and equipment.
  • Observed company safety rules and regulations to minimize workplace accidents and reduce electric shocks.
  • Recorded accurate measurements for installed new power lines and poles.
  • Inspected power lines and poles for signs of damage or wear, interference, and degradation, and reported findings to supervisor.
  • Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.

Education

GED -

Langham Creek
Houston, TX

Skills

Bucket truck operation

Heavy lifting

Storm damage repair

Hand and power tools

Fall protection practices

Digger derrick use

Electrical power line installation

Timeline

Lineman

Hawthorne Construction
06.2022 - 11.2025

Journey Lineman

Greenstone Electric
02.2020 - 05.2022

Journey Lineman

B&B Electric
07.2017 - 01.2020

Journey Lineman

T&D Solutions
05.2013 - 08.2017

Journey Lineman

Pike Electric
03.2007 - 04.2013

Journeyman Lineman

Pedernales Electric CoOp
03.1998 - 03.2007

GED -

Langham Creek