● Terminating 480v 3 Phase Motors Stress Cones
● Installing Cable Tray, Supports, Pulling Wires for Instrument, Power Cables.
● Terminating 480v 3 Phase Motors Stress Cones
● Fabrication of Conduit, Supports For Motors 120v and 480v
● Terminating PIT, LIT, Devices And SDV Valves
● Pulling Wire for Motors, Lights, Instrument Devices
● Underground PVC Conduit, Duct Banks, Grounding
● Fabrication of Conduit, Supports, Lights
● Terminating Lights (480v) Pulling Wire For Lighting
● Install Panels, Terminate Panels, OHM wires, Meg wires.
● Fabricate and Install Cable Tray.
● Terminate cables for PLC cabinets.
● Fabricate and Installed Aluminum Cable Tray
● Terminate Motors, OHM wires.
● Fabricate and Install Plastic-bond pipe
● Install MCC and Switch gears.
● Installed Fire and Gas Junction boxes
● Pulled Wire.
● Installed Panels.
● Installed PVC Conduit for Underground Duct Banks
● Bend and Installed PVC Conduit.
● Tie-wire All Underground Rebar.
● Cad-Weld Ground Wire.
● Fabricate and Installed Aluminum Cable Tray.
● Fabricate and Installed Rigid Conduit.
● Installed Roxtec Blocks For Wires.
● Pulled Wire.
NCCER
OSHA 10
Electrical NCCER