Summary
Overview
Work History
Education
Skills
Timeline
Generic

Eric S. Fleckinger

Edgewater,FL

Summary

Adept at project management and engineering documentation, I spearheaded team initiatives at Everglades, enhancing boat assembly efficiency and quality. My leadership in training and strategic problem-solving fostered a collaborative environment, significantly contributing to the successful delivery of highest Quality Everglades boats. My technical expertise and effective communication skills have been pivotal in driving projects to completion. Experienced leadership professional prepared to guide teams effectively. Strong focus on collaboration and achieving results, ensuring adaptability with changing needs. Proficient in project management, conflict resolution, and strategic planning. Reliable and flexible, fostering cohesive and productive team environment.

Overview

9
9
years of professional experience

Work History

TEAM LEAD

EVERGLADES
01.2023 - 10.2024
  • became a team lead ran washpad and the shipping of the boats
  • Lifting boats and putting them in the pool running through the systems
  • doing ocean runs testing and fixing problems out on the water
  • Trained new team members by relaying information on company procedures and safety requirements.
  • Promoted a positive work environment by fostering teamwork, open communication, and employee recognition initiatives.
  • Influenced positive change within the organization through strategic thinking, innovation, problem-solving abilities, and consistent leadership style.
  • shrink wrap boats load onto trucks to send to the customer

L3 Assemble Specalist

EVERGLADES
08.2015 - 10.2024
  • Built boats from 25ft to 45ft
  • spent 4 years in sub assemble building consoles, hard tops, helm seats, upper stations, helm face and ran wire harnesses
  • Moved to the assemble building for the next 6 years
  • Hulls putting in fuel tanks, bulk heads, wire harnesses, thru-hull transducer
  • Decks: building live wells install speakers, hatches rod lockers, wire harnesses
  • Capping process by running the mud gun laying the mud in the boat capping hull and deck
  • Capped cabin pods in hulls and then cap the decks
  • Engine rigging for Yamaha and Mercury single, twin, triple and quad
  • Mid assemble doing console install, helm seat install dive door and rub rail.
  • final assemble installing screens, cushions, hooking up harnesses
  • helping build the cabin interior and help get boat ready for a final quality audit

Education

Standards Compliance Specialist - National Marine Manufactures Association

Everglades
Edgewater, FL
03-2024

Certificate - Basic Marine Electronics Installer (MEI)

Everglades
Edgewater, Florida
02-2023

Certificate - Basic NMEA 2000 Installer

Everglades
Edgewater, Florida
02-2023

Certificate of Graduation - Marine Technician Program

Marine Mechanics Institute
Orlando, Florida
12-2011

High School Diploma -

Campbell County High School
Alexandria, Kentucky
06-2010

Skills

  • Project Management
  • Project Planning
  • Technical reporting
  • Problem solving
  • Engineering Documentation

Timeline

TEAM LEAD

EVERGLADES
01.2023 - 10.2024

L3 Assemble Specalist

EVERGLADES
08.2015 - 10.2024

Standards Compliance Specialist - National Marine Manufactures Association

Everglades

Certificate - Basic Marine Electronics Installer (MEI)

Everglades

Certificate - Basic NMEA 2000 Installer

Everglades

Certificate of Graduation - Marine Technician Program

Marine Mechanics Institute

High School Diploma -

Campbell County High School
Eric S. Fleckinger