Overview
Work History
Skills
Timeline
Generic

Ernesto Pérez

Worcester ,MA

Overview

2026
2026
years of professional experience

Work History

Carpenter

Waypoint
09.2020 - Current
  • Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
  • Completed installations of building structures, trim, flooring and cabinetry.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Organized project work by reading blueprints and assessing job specifications to determine optimal plans.
  • Planned projects by identifying necessary equipment, tools, and required assistance.
  • Completed precise joining and high-quality finish work by properly anchoring and bracing structures.
  • Monitored tool and equipment condition and arranged repairs.
  • Shaped or cut materials to specified measurements using hand tools, machines and power saws.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
  • Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
  • Safely operated electric cordless and hammer drills and cutting torches.
  • Completed tasks according to technical document requirements and specifications to work with accuracy.
  • Followed protocols and stayed organized to provide personal and teammate safety.
  • Measured and marked cutting lines on materials using pencil or chalk and marking gauge.
  • Aligned and squared frames and forms for installation.
  • Carefully read blueprints, sketches and technical drawings to inform comprehensive understanding of project scope and specifications.
  • Read and interpreted blueprints and construction documents to determine project directives.
  • Read and effectively used truss-roof prints to cut and set roofs accordingly.
  • Transformed lumber into forms and assembled structures for Type projects.
  • Studied specifications in blueprints, sketches or building plans to prepare project layout and determine dimensions and materials required.
  • Cut and shaped materials to meet outlined measurements using Tool and Tool.
  • Reduced materials waste by Number% by taking accurate measurements.

Carpinter

Sunrise
03.2016 - 09.2020
  • Worked in team environment to maintain high levels of productivity.
  • Met with designers and engineers to address conflicts and reach appropriate solutions.
  • Investigated and resolved construction problems with diverse trades.
  • Closely monitored coworkers, Type tasks and construction areas to minimize safety accidents and maximize productivity.

Carpinter

Forc Corporate
06.2012 - 02.2016
  • Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Planned projects by identifying necessary equipment, tools, and required assistance.
  • Completed precise joining and high-quality finish work by properly anchoring and bracing structures.
  • Shaped or cut materials to specified measurements using hand tools, machines and power saws.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
  • Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
  • Safely operated electric cordless and hammer drills and cutting torches.
  • Installed interior doors and hardware, accessories, cubicle curtain tracks and TV brackets.
  • Followed protocols and stayed organized to provide personal and teammate safety.
  • Measured and marked cutting lines on materials using pencil or chalk and marking gauge.
  • Aligned and squared frames and forms for installation.
  • Carefully read blueprints, sketches and technical drawings to inform comprehensive understanding of project scope and specifications.
  • Read and interpreted blueprints and construction documents to determine project directives.
  • Read and effectively used truss-roof prints to cut and set roofs accordingly.
  • Selected and ordered lumber or other required materials to keep inventory at sufficient levels.
  • Operated Type and Type tools to cut, shape and smooth lumber and other construction materials.

Carpenter

Twin Pines
04.2008 - 05.2012
  • Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
  • Completed installations of building structures, trim, flooring and cabinetry.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Followed established job site safety regulations and maintained safe and clean work area.

Carpinter

Sfmg Shawent Gardens Llc
2025 - 2025
  • Led construction projects, ensuring adherence to safety standards and regulations.
  • Mentored junior carpenters, enhancing their skills and efficiency in various tasks.
  • Designed and implemented custom cabinetry solutions based on client specifications.

Skills

  • Materials Packing
  • Multi-Project Coordination
  • Construction Materials
  • Construction Work Understanding
  • Hand and Power Tools
  • Fall Protection
  • Workplace Safety
  • Equipment Operations
  • Structure Assembly
  • Structural Supports
  • OSHA Compliance
  • Interpreting Blueprints
  • Machine Operations
  • Safe Operating Procedures
  • Quality Control
  • Job Specifications Reading
  • Basic Math Aptitude
  • Workload Planning
  • Carpentry and Woodworking
  • Hardware Installation
  • Teamwork and Collaboration
  • Installation and Repair

Timeline

Carpenter

Waypoint
09.2020 - Current

Carpinter

Sunrise
03.2016 - 09.2020

Carpinter

Forc Corporate
06.2012 - 02.2016

Carpenter

Twin Pines
04.2008 - 05.2012

Carpinter

Sfmg Shawent Gardens Llc
2025 - 2025
Ernesto Pérez