Summary
Overview
Work History
Education
Skills
Affiliations
Languages
Accomplishments
Certification
Timeline
Generic

Esahu Mancinas Avalos

Del Valle

Summary

Results-driven professional with solid experience in project management, safety compliance, and team collaboration. Successfully coordinated subcontractor teams to ensure project completion, implementing effective safety protocols and conflict resolution strategies. Dedicated construction professional experienced in managing subcontractor teams and ensuring safety compliance on job sites. Strong background in training, material coordination, and conflict resolution, with a proven ability to enhance team productivity and project efficiency. Dynamic subcontractor manager with a focus on leadership, safety compliance, and efficient project execution. Known for fostering teamwork and resolving conflicts, driving successful project outcomes through effective communication and meticulous resource management. "highly organized subcontractor with excellent skills in project management and communication. Punctual and committed to delivering quality work in all projects. Dependable subcontractor with demonstrated abilities to handle maintenance and repair projects. Offering several years of expertise for organizations in various industries. An enthusiastic personality.

Overview

21
21
years of professional experience
1
1
Certification

Work History

Handy Person

Intergalactic Produccion
Austin
03.2025 - Current
  • Performed repairs on various structures and equipment as needed.
  • Repaired damaged doors by replacing hinges, locksets or frames when necessary.
  • Painted interior rooms with desired colors according to customer specifications.
  • Installed plumbing fixtures, including sinks, toilets, bathtubs and showers.
  • Installed cabinets, countertops, appliances and other fixtures in kitchens and bathrooms.
  • Performed minor repairs, such as replacing light bulbs, patching walls and repairing door hinges.
  • Patched holes in ceilings and walls using spackling paste or joint compound.
  • Measured and cut drywall for installation of new walls or repair of existing walls.
  • Cleaned gutters to ensure proper drainage away from the building's foundation.
  • Constructed decks or patios to create additional living spaces outdoors.
  • Maintained outdoor areas by mowing lawns, trimming hedges and removing debris.
  • Replaced faulty wiring in electrical circuits and outlets.
  • Installed shelving units for storage purposes.
  • Changed air conditioning filters to improve indoor air quality and help HVAC system perform properly.
  • Repaired machines, equipment or structures using tools or equipment.
  • Performed routine maintenance by inspecting drives, motors or belts.

Subcontractor

Castelan paint & Drywall
Austin
11.2017 - 02.2025
  • Managed subcontractor teams to ensure timely project completion.
  • Coordinated material deliveries and inventory for drywall installation projects.
  • Implemented safety protocols to maintain a secure work environment.
  • Trained new workers on tools and equipment usage for drywall application.
  • Collaborated with project managers to align on job specifications and timelines.
  • Inspected work sites for compliance with industry standards and regulations.
  • Resolved conflicts between team members to maintain productivity and morale.
  • Followed safety protocols to avoid job site accidents and damage to property.
  • Estimated costs for projects and delivered bids to general contractors.
  • Used specialized tools to install ceramic tile and hardwood.

Laborer and Driver

S J Matrangos Construccion
Acworth
01.2014 - 10.2017
  • Maintained tools and equipment for optimal performance and safety compliance.
  • Assisted in loading and unloading materials for site preparation and delivery.
  • Collaborated with team members to complete tasks efficiently on job sites.
  • Drive the company vehicle to move an employee from one work site to another.
  • Work under pressure and manipulate equipment in a correct way.
  • Produced a deck as the customer required.

  • Delivered goods efficiently across designated routes to ensure timely arrival.
  • Maintained vehicle cleanliness and performed routine safety inspections weekly.
  • Collaborated with team members to improve route planning and logistics efficiency.

Concrete Foreman

Merit Construction company
Doraville
05.2004 - 10.2014
  • Supervised concrete placement and finishing processes on construction sites.
  • Trained workers on safety protocols and equipment operation.
  • Coordinated schedules and resource allocation for multiple projects.
  • Ensured adherence to quality standards during concrete mixing and pouring.
  • Conducted inspections of work areas for compliance with safety regulations.
  • Assisted in developing efficient concrete pouring techniques for various projects.
  • Finished surfaces by troweling, floating and brushing following project requirements and specifications.
  • Inspected forms, footings, and foundations for accuracy in accordance with plans and specifications.
  • Calculated concrete quantities needed for jobs.
  • Poured concrete into forms using pump hose and leveled.
  • Loaded and unloaded necessary tools, materials, and machines from trucks and trailers.
  • Obtained specifications and directed work for construction crews.

Education

High School Diploma -

CBTA 189
Zacatecas, Mexico
07-1999

Skills

  • Cost estimation
  • Team supervision
  • Safety compliance
  • Material coordination
  • Quality assurance
  • Equipment maintenance
  • Training development
  • Attention to detail
  • Problem solving
  • Time management
  • Effective communication
  • Conflict resolution
  • Resource allocation

Affiliations

  • I can work outside or inside
  • I can be from a Handyman to a construction worker
  • I solved anything I can, if I can not I available to learn.

Languages

Spanish
Professional
English
Professional

Accomplishments

  • Often I was ask to make the model home of new communities. thanks to the work I do.

Certification

  • Texas Driver Licenses

Timeline

Handy Person

Intergalactic Produccion
03.2025 - Current

Subcontractor

Castelan paint & Drywall
11.2017 - 02.2025

Laborer and Driver

S J Matrangos Construccion
01.2014 - 10.2017

Concrete Foreman

Merit Construction company
05.2004 - 10.2014

High School Diploma -

CBTA 189