Walking Path Redesign (Spring 2022)
- Redesigned walking path located on west side of Villanova's campus
- Surveyed path to get elevations
- Used ArcGIS to show site location
- Used AutoCad to create plan and profile views of walking path
- Used AutoCad to show cut/fill
Smart Beam Project (Fall 2021)
- Worked with team to design wooden beam able to withstand a given load
- Could not exceed given stress/strain requirements
- Wrote code and wired a device that read the stress and strain values