Knowledgeable Derrickhand/Floorhand with strong background in oil and gas drilling operations. Adept at maintaining equipment integrity and ensuring safety on site. Demonstrated expertise in critical thinking and teamwork.
Overview
12
12
years of professional experience
Work History
Derrickhand/relief Operator
Key Energy Services
12.2023 - Current
Worked on Mw rig with dual disc assist with liquid cold flanges
Worked on Nov with dual disc with brake water
Rig up on offside with levers checks rams for air
Work on triplex pump, change liners and swaps when necessary, check mud weight grease pump
Determine stretch for setting bayonet hanger with or packer at bottom
Check drawworks, brakes pad thickness, rollers springs , cotter keys
Inspect harness, straps, chains and hooks make sure there up to date
Check hardline up to date, check for teared rubbers inside male hardline
Grease undercarriage of rig
Executed basic repairs for workover rigs to minimize equipment downtime.
Evaluated the performance of equipment and systems on a regular basis, making recommendations for updates or replacements as needed to maintain optimal functionality.
Performed thorough pre-start checks to ensure that machinery was ready for safe operation during scheduled shifts.
Provided input during team meetings to help identify potential areas for process improvement, emphasizing a proactive approach to continuous learning and growth.
Enhanced safety standards by ensuring proper operating procedures were followed at all times.
Reduced downtime for maintenance by conducting routine inspections and addressing potential issues proactively.
Provided backup coverage during periods of staff absence or increased workload demands, demonstrating adaptability and flexibility within the role of Relief Operator.
Worked outside in all weather conditions.
Maintained organized work area by cleaning and removing hazards.
Derrickhand
Steel Energy Services
12.2022 - 12.2023
Performed preventive maintenance and basic repairs on workover rigs by checking fluids, hydraulic and transmission,
Worked on a daylight rig doing production work
Worked derricks and on the floor tripped out of hole with 2 7/8 eue pipe, inspected open face tongs worked
Tripped to rod basket , used correct bottle inspected made sure elevators and bottle was good and ready
Inspect rod tongs, make correct heads are being used, check to make sure jaws are in good conditon not mushroomed,
Inspect guieded rods aren‘t crack in good conditon
Inspect derrick before rigging up, check for shackles have cotter keys, inspect guy lines, inspector for cracks, welds
Hardscape / Concrete Finisher
Henry and Sons
01.2021 - 12.2022
Removed excess mortar and finished joints for uniform surface.
Prepared surfaces for work by smoothing imperfections on ground or with close structures.
Applied sealants or other protective coatings to waterproof or restore concrete surfaces.
Followed blueprints or drawings to lay blocks and bricks in correct arrangement.
Set wood and other forming materials to prepare for concrete pours.
Drillers Assistant
National Ewp
05.2021 - 06.2022
Pre trip rig, water truck and flat tank,
Load cement, fill water truck, prep pvc pipe, have tools ready,
Gauge well to see how much gpm we are getting,
Help driller trip in tubing,
Fuel up equipment
Drive flat tank to location,
Clean equipment, keep work área clean housekeeping,
Self-motivated, with a strong sense of personal responsibility.
Worked effectively in fast-paced environments.
Driller's Assistant
Drill Tech
02.2021 - 05.2021
Pre trip rig, water truck and flat tank,
Load cement, fill water truck, prep pvc pipe, have tools ready,
Gauge well to see how much gpm we are getting,
Help driller trip in tubing,
Fuel up equipment
Drive flat tank to location,
Clean equipment, keep work área clean housekeeping,
Self-motivated, with a strong sense of personal responsibility.
Worked effectively in fast-paced environments.
Heavy Equipment Operator/ Concrete Finsher
Southwest Concrete Paving
06.2017 - 02.2021
Moved materials around construction sites to work locations.
Operated machining equipment safely and efficiently with team of operators.
Finished concrete
Set forms carpentry
Maintenance Technician
Quality Plastics
10.2016 - 05.2017
Maintained equipment by troubleshooting breakdowns and performing preventive maintenance.
CNC Machinist Operator
Rugar
03.2016 - 11.2016
I operated a cnc machine making precious measurements using a decimal caliper, Depth Micrometer.
General laborer
Corbell Custom Contracting
06.2015 - 11.2016
At Corbell Custom Contracting I shoveled dirt, graded dirt and, clean tools. I only worked here for a short time due to injury my hand
Factory worker
Michael Brothers Inc.
11.2015 - 02.2016
While I worked at michael brothers inc. I operated a rotational molding machine.