Experienced solar professional with 5 years of solid background in mechanical installation, remediation, and QA/QC for ground-mounted solar projects. Known for leading crews on-site, maintaining high quality standards, and ensuring compliance with safety protocols while consistently meeting project deadlines in fast-paced environments.
Overview
14
14
years of professional experience
3
3
years of post-secondary education
Work History
Solar Mechanical Installer
HardHat Workforce Solutions Inc.
04.2025 - Current
Installed and maintained ground-mounted solar systems with a focus on structural accuracy and quality.
Performed remediation work by correcting misaligned racking, replacing damaged modules, and tightening loose hardware.
Conducted QA/QC inspections to verify torque specs, array alignment, grounding, and compliance with project standards.
Documented issues and completed punch lists to ensure timely and accurate corrective actions.
Collaborated with supervisors and team members to maintain quality throughout installation phases.
Followed OSHA safety standards and contributed to a clean, organized, and hazard-free job site.
QCells Enable
Solar Mechanical Installer
03.2024 - 02.2025
Installed ground-mounted and solar systems, assembling racking and modules per design specs.
Performed mechanical remediation, correcting alignment issues and replacing damaged components.
Verified layout accuracy using drawings and measuring tools; assisted with trenching and material handling.
Followed OSHA safety standards and supported project deadlines with site teams.
Mechanical Solar Installer
Light Chains Solar
09.2023 - 02.2024
Organized and assembled hardware for crew
Layed out and installed and aligned racking system to blue print specs.
Developed good communication skills worked well with others
Installed torque tubes kept good communication with team to minimize accidents
Installed modules and riveted them down.
Torqued bolts and performed QA/QC inspections for missing hardware
Mechanical Solar Installer
Soltec
10.2022 - 09.2023
Helped organize and set up site for installation.
Remediated piles using string line method for accurate results.
Built hardware with correct washers to maximize production on field.
counted inventory and kept correct documentation over it
installed racking using 2 jigs that gave us an accurate result
installed motors and end caps to prepare for torque tubes.
Mechanical Solar Installer
Novel
09.2021 - 10.2022
Laid out torque tubes for installation.
Built, laid out, and installed racking to blue print spec.
Used good communication skills with supervisor to avoid miscommunication.
Did not take any shortcuts and made sure to always have ppe and proper tools for job tasks.
Performed a day to day log of daily production to push myself to give more production.
Kept good housekeeping rules and helped keep site clean and organized.
Industrial Painter
Bay LTD
01.2011 - 06.2021
Operated power sprayers and hand tools to prepare and paint large areas.
Painted surfaces using brushes, spray guns, and paint rollers.
Protected surfaces from damage and spills by using drop cloths prior to and during painting.
Climbed scaffolding, staging, ladders, and planks to reach work area surfaces and observed safety protocols to prevent falls.
Worked holidays and weekends depending on shifting needs of project.
Prepared surfaces and surrounding areas for painting using sandpaper, tape, and other materials.
Mixed and blended paints according to specified colors and consistency.