Summary
Overview
Work History
Education
Skills
Timeline
Generic

Vincent Calmeyn

Carleton,MI

Summary

My Background is a Machine Tool Electrician and Maintenance working with multiple types of Robots and all different types of Machines

  • Dependable Electrician skilled in performing preventive and regular maintenance work on electrical systems. Adapts to new technology and concepts. In-depth knowledge of generators, transformers and circuit breakers. Punctual and hardworking individual dedicated to cultivating excellent relationships with clients.

Overview

29
29
years of professional experience

Work History

Electrician

Stellantis
Detroit, MI
02.2016 - Current
  • Performed electrical system installation of conduit, wire, power distribution and motor controls.
  • Installed, tested and modified circuit breakers, controls, fuses, lights and motors.
  • Fixed wiring and circuit systems to correct performance issues and safety concerns.
  • Interpreted and validated technical issues, test solutions, follow-up and escalate when necessary.
  • Inspected circuits already in place and lead team of electricians through installing high quality new ones.
  • Completed average of [Number] repairs per [Timeframe].
  • Interpreted electric and electronic schematics and mechanical layouts to diagnose equipment problems.
  • Measured and read DMM, meggers, micrometers and thickness gauges using electrical and mechanical testing instruments.
  • Installed electrical conduit and wiring for power, controls and lighting.
  • Performed preventive maintenance tasks to verify proper working condition of electrical panels and conduits.
  • Interpreted blueprints, schematics, drawings and layouts to complete repairs.
  • Disconnected and removed motors and pumps.
  • Installed electrical and mechanical equipment in accordance with National Electric Code.
  • Notified supervisor immediately about equipment problems and breakdowns.
  • Updated and modified components and systems to improve operation.

Maintenance Electrician

Vitec LLC
Detroit, MI
08.2004 - 02.2016
  • Conducted preventive maintenance on equipment.
  • Installed new equipment and modified existing equipment.
  • Responded to fault and wiring issues, identifying hazards and problems.
  • Safely installed new electrical components, fixtures and motors in addition to testing systems to enhance power flow.
  • Worked with and repaired Abb Robots
  • Worked with Blow Molding Presses
  • Maintained Regrind systems
  • Preventative Maintenance
  • Worked on conveyors systems

Electrician

Novi Industries/Pico/Comau
Novi, MI
12.1996 - 08.2004

Performed build of Multiple Body shops for GM,Ford,Chrysler and Mazda start to finish.

Wired PLCs, Robots, Weld Controllers,multiple types of Motors and controllers troubleshooting.

Electrician

Modern Employment
Troy, MI
11.1994 - 12.1996
  • Worked from ladders, scaffolds and lifts to install, maintain or repair electrical wiring equipment and lighting fixtures in ceilings, on roofs and on towers.
  • Worked with various types of cableways, conduits and other electrical raceways.
  • Used testing instruments such as ohmmeters, voltmeters, ammeters and multimeters.
  • Installed and wired electrical transformers, service panels, and circuit breakers.
  • Machine tool Electrician,contractor
  • Wired Machines for Gm,Ford, and Chrysler

Electrician

Westland Controls
Westland, MI
06.1993 - 11.1994

Wired Robot lines for GM, Start up and troubleshoot

Education

WCMA Academy
Warren, MI

Skills

  • Circuit Continuity Assessment
  • Blueprint Reading
  • Supply Control
  • Electrical Wiring and Fixtures
  • Worker Training
  • Layout Planning
  • Robot programming and trouble shoo
  • Working with Fanuc, Abb, and Comau
  • Electrical Safety
  • Electrical Systems Testing
  • Conduit and Pipe Laying
  • Robot Programming Abb,Comau, Fanuc and Kowasaki
  • Transformer Connection
  • Local Codes Compliance
  • Attention to Detail
  • Hazard and Defect Detection
  • Lock Out-Tag Out Procedures
  • Vehicle and Equipment Operation
  • Repair Planning
  • Wire Insulation
  • Scaffolding and Ladder Work
  • Problem Anticipation and Resolution
  • Decision Making
  • Multitasking and Prioritization
  • PPE Gear
  • Hydraulic Press Operation
  • Breaker Panel Installation
  • Voltage and Current Meters
  • Radio and Telephone Communication
  • Conduit and Raceway Installation
  • Welding and Brazing
  • AC/DC control circuitry
  • Control circuit troubleshooting
  • Relays and pressure switches

Timeline

Electrician

Stellantis
02.2016 - Current

Maintenance Electrician

Vitec LLC
08.2004 - 02.2016

Electrician

Novi Industries/Pico/Comau
12.1996 - 08.2004

Electrician

Modern Employment
11.1994 - 12.1996

Electrician

Westland Controls
06.1993 - 11.1994

WCMA Academy
Vincent Calmeyn