Summary
Overview
Work History
Education
Projects
Duties Responsibilities
Professional Training Achievement
Personal Information
Languages
Timeline
Generic

Farhan Anjum Tahir

Civil Engineer
Doha

Summary

A Civil Engineer with more than 12 years of Gulf experience in Infrastructure construction, maintenance, in a reputable construction firms which include planning and scheduling, completed many projects from concept to fully operational Stage. Have handled multiple assignments competently while maintaining highest emphasis on quality and time.

Overview

11
11
years of professional experience
6
6
years of post-secondary education

Work History

Senior Engineer

Boom Construction Company BCC
10.2021

Project Engineer

Temalco Contracting and Trading
10.2018 - 08.2021

Project Engineer

Gulf Consolidated Contractor W.L.L
05.2018 - 09.2018

Site Engineer

TriConstruct Corporation
10.2016 - 05.2018

Site Engineer

Wade Adams Contracting L.L.C
05.2011 - 09.2016

Assistant Engineer

AJ Construction
04.2010 - 01.2011

Education

Associate Engineering in Civil -

Swedish college of Technology Rawalpindi, Punjab, Pakistan
01.2007 - 04.2010

Matriculation - undefined

F.G. Sir Syed School Rawalpindi, Punjab, Pakistan
01.2006 - 04.2008

Projects

  • Boom Construction Company,
  • DW-020 Roads in Infrastructure in Mebaireek (Zone 81),

      Client:- Public Works Authority - Ashghal,  Consultant: - ITAL Consult,

1. Construction of Roads 55km including 9km of shared pedestrians and cycle lines,17km of Foul Sewer Network, 28km Surface/Ground Water and TSE Network including Chambers and Manholes Construction with Micro tunneling, road crossing duct with all associated Civil works.

  • Temalco Contracting and Trading,

Client:- Public Works Authority - Ashghal, Consultant: -ASCO, 

1. Design and build of TSE supply to Farms near Doha North STW including Construction of Tapping Point chamber on Existing Twin 1600mm dia lines Modify existing 2no. Washout chambers on Single 1600mm and Twin 1600mm dia lines (CH 10+222 and CH 5+650 respectively) Gulf Consolidated Contractor W.L.L, Roads and Infrastructure in Doha Industrial Area (Package 2), Public Works Authority - Ashghal, AECOM, Construction of 40kms of roads, including combined storm water / Ground water drainage network, foul sewer network, road crossing duct with all associated Civil works. Nael & Bin Harmal Hydroexport (TriConstruct Corporation), DW002 Roads and Infrastructure in West Muaither, Public Works Authority - Ashghal, ATKINS, Construction of the Roads and infrastructure works in Zone 55 of Al Rayyan Municipality, which includes the construction of 43km roads with all associated works for Surface water, Fuol sewer, TSE, water line, QNBN/Ooredoo Networks, Street lighting, road crossing ducts and hard landscaping works. Wade Adams Contracting L.L.C, DS 158 Main Irrigation lines at sheikh Zayed road, Construction of the irrigation main along the sheikh Zayed road This shall include supply of all pipes, valves and fittings complete with all associated civil/earth works from Diameter 600mm to 2000mm GRP. Wade Adams Contracting L.L.C, DMS 137664 Interim access road between Jumeirah village and Jumeirah park gate # 05, Construction of the interim access road with required utilities and services between Jumeirah village and Jumeirah park- Gate # 05 Wade Adams Contracting L.L.C, Shallow services and internal roads main road 2 & 3 - package 4, Al quoz, Construction of Roads, Water, Irrigation, Firefighting and Telecom networks including ducts with associated chambers and all related Civil and Infrastructure works Wade Adams Contracting L.L.C, DS133/2 AL Quoz 2nd sewerage networks (C355) stage 2, Construction of Sewer gravity line (22km) including manholes and House connection chambers and the rising Main with the outfall to Existing Network. Wade Adams Contracting L.L.C, MBR garden development-Dubai hills Golf course grading works, Completion of various earth works for the Golf Course which includes the cutting and filling. Wade Adams Contracting L.L.C, Mohammad Bin Rashid estate phase-01, Street of dreams & PA-01 shallow services & internal roads (MBR City - Phase 01), Construction of deep sewer network, Drainage network, water, Irrigation, firefighting and Telecom networks with associated chambers and all related Civil and Infrastructure works. Wade Adams Contracting L.L.C, DS 190/2 Sewer network and rising main at AL Quoz industrial area, Construction of deep Sewer Gravity line (Dia 200mm UPVC, 400 to 900 mm GRP) and construction of manholes, Rising main (Dia 700mm GRP) by open cut as well as Pipe Jacking for road crossing. Wade Adams Contracting L.L.C, Al-Falah community development, Abu Dhabi, Construction of 40kms of roads, including combined storm water / Ground water drainage network, foul sewer network, road crossing duct with all associated Civil and infrastructure works.

Duties Responsibilities

  • Planning and coordinating the work going on at project sites, organizing and directing site manpower and the delivery of construction materials and equipment.
  • Studying and interprets specifications, and determining construction methods and procedures.
  • Coordinating with Site Management for the specific activities and keeping the overall contractual and day-to-day commitments with client.
  • Responsible for quality assurance & quality control and ensuring that the work at site is as per approved drawing and specification. Raising Technical Query's about Obstruction, Design issues, Site conditions, Modifications of work and Monitoring/discussing project status.
  • Establishing detailed programs for the coordination of site activities, and complete coordination and supervision of monthly activities on daily basis. Supervising and managing all ongoing projects under my area of command. Evaluating, rectifying and reporting delays at work site. Co-ordination with clients/users for different issues, changing needs, troubles at work sites and reaching at best possible solution to achieve the objective in specified time. Preparation of Project Estimates, which included detail drawings, quantity take-offs and follow up for the administrative approval. Complete Supervision from the commencement of work to completion (Handing over of the project to Authorities.

Professional Training Achievement

  • Approved Project Coordinator from Ashghal (FW-07/2019) project.
  • Successfully Completed - ISO 45001:2018 Lead Auditor Training Course
  • Successfully completed the PTW - Performing Authority Authorization training from DOLPHIN ENERGY
  • Successfully completed the NOC Safety briefing session from DUSUP on permit to work System

Personal Information

  • Date of Birth: 01/15/1992
  • Nationality: Pakistani
  • Driving License: Valid Qatar and UAE
  • Marital Status: Married
  • Visa Status: Employment

Languages

English, Arabic, Urdu

Timeline

Senior Engineer

Boom Construction Company BCC
10.2021

Project Engineer

Temalco Contracting and Trading
10.2018 - 08.2021

Project Engineer

Gulf Consolidated Contractor W.L.L
05.2018 - 09.2018

Site Engineer

TriConstruct Corporation
10.2016 - 05.2018

Site Engineer

Wade Adams Contracting L.L.C
05.2011 - 09.2016

Assistant Engineer

AJ Construction
04.2010 - 01.2011

Associate Engineering in Civil -

Swedish college of Technology Rawalpindi, Punjab, Pakistan
01.2007 - 04.2010

Matriculation - undefined

F.G. Sir Syed School Rawalpindi, Punjab, Pakistan
01.2006 - 04.2008
Farhan Anjum TahirCivil Engineer