Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Behnam Sherafat

Graduate Research Assistant
Salt Lake City,UT

Summary

Driven Research Assistant with more than 7 years of advanced research and analysis experience. Successful in applying quantitative techniques to break down sound data and draw logical conclusions to enhance construction engineering. Proven talents in machine learning and data analysis. Looking to transition to challenging new role in data science region.

Overview

8
8
years of professional experience
10
10
years of post-secondary education
2
2
Certifications
3
3
Languages

Work History

Graduate Research Assistant

University Of Utah
Salt Lake City, UT
01.2018 - Current
  • Research on artificial intelligence, machine learning, and digital signal processing applications in construction domain
  • Collected construction equipment sound data from job sites using single-channel off-the-shelf microphones and microphone arrays
  • Oversaw groups of 10 undergrad students for data collection
  • Developed a hybrid IoT-based system for recording, recognizing, and tracking construction equipment activities
  • Prepared materials for reports, presentations and submission to peer-reviewed journal publications.

Machine Learning Researcher (Intern)

Utah Department Of Transportation
Salt Lake City, UT
02.2019 - 08.2019
  • Analyzed Utah traffic and accident data
  • Designed, implemented and evaluated machine learning models and rapid software prototypes to predict accidents.
  • Identified the hidden relations between the accident variables using Association Rule Mining (ARM)

BIM Researcher

Tecnosa R&D Center
Tehran, Iran
05.2016 - 01.2018
  • Developed an automated framework for generating construction schedule using Building Information Modeling (BIM).
  • Used Autodesk Navisworks Manage and Autodesk Revit to create models.
  • Developed APIs to connect Modeling software to Microsoft Access database.

BIM Expert

Payvar Bonyan Iranian
Tehran, Iran
12.2015 - 01.2018
  • Employed an intensive MIS system for effective project planning and management
  • Developed Application Programming Interface (API) for automatic quantity take-off from Autodesk Revit
  • Developed 4D (3D with time) and 5D (4D with cost) models

Education

Ph.D. - Construction Engineering

University of Utah
Salt Lake City, UT
01.2018 - Current

Master of Science - Construction Engineering And Management

University of Tehran
Tehran
09.2014 - 05.2017

Bachelor of Science - Civil Engineering

Sharif University of Technology
Tehran
09.2010 - 08.2014

Skills

    Data Analysis

undefined

Certification

Complete Python Mastery

Timeline

Complete Python Mastery

08-2021

Programming Foundations with JavaScript, HTML and CSS

05-2021

Machine Learning Researcher (Intern)

Utah Department Of Transportation
02.2019 - 08.2019

Graduate Research Assistant

University Of Utah
01.2018 - Current

Ph.D. - Construction Engineering

University of Utah
01.2018 - Current

BIM Researcher

Tecnosa R&D Center
05.2016 - 01.2018

BIM Expert

Payvar Bonyan Iranian
12.2015 - 01.2018

Master of Science - Construction Engineering And Management

University of Tehran
09.2014 - 05.2017

Bachelor of Science - Civil Engineering

Sharif University of Technology
09.2010 - 08.2014
Behnam SherafatGraduate Research Assistant