Summary
Overview
Work History
Education
Skills
Certification
Technical Skills
Projects Lists
Timeline
Hi, I’m

FELEKE BELAY

Burtonsville,MD

Summary

Transportation engineer with mastery of key engineering principles and theories, detailed inspection, project coordination, and analyzing constructability. Competency in all stages of project development including, collecting and reviewing data on transportation Infrastructure and asset management, budgeting, and scheduling. Qualified in team leading and strategic planning.

Overview

29
years of professional experience
1
Certification
4
years of post-secondary education

Work History

Johnson, Mirmiran, & Thompson, Inc. /JMT, Inc.

CM - Transportation Engineer
06.2017 - Current

Job overview

  • Assist PE and AE with the change order quantity estimation and field condition
  • Assist PE with accurate project records and monthly estimate
  • Organize team meetings, prepare meeting agendas and meeting minutes
  • Lead the field and lab testing team by using the MDOT standard testing procedure
  • Monitor phases of construction according to the standard specification and standard detail
  • Interpret the construction plan and drawings, procedure, and sequence of construction
  • Ensure worksite Best Management practices to safety in compliance with OSHA standard
  • Inspect the construction projects according to the standard specifications and standard detail
  • Inspect maintenance of Traffic as per TCP and be alert for work zone traffic
  • Inspect the E&S controls and SWM facilities to ensure that installed per specifications
  • Apply engineering principles in the inspection and documentation of construction activities
  • Maintain comprehensive project records and documentation using the MMS, eMCMS, and OED Toolkit.

INDAM Engineers Inc.

CM- Transportation Engineer Technician
03.2014 - 06.2017

Job overview

  • Performed as-built plans to document changes
  • Performed full patching and partial patching identification
  • Performed material sampling, testing, and documentation of the lab results
  • Inspected maintenance of traffic as per TCP and being alert for work zone traffic
  • Inspected the placement of the material, performed physical measurements, and reported on IDR
  • Participated in pre-con, partnering, E&S control, progress meetings
  • Assisted the Project Engineer with material clearance and estimated closing.

FD Building Contractor

Principal Project Manager
10.2001 - 09.2010

Job overview

  • Worked with engineers, architects, and construction personnel
  • Prepared budgets, cost estimates, and schedule
  • Monitored the project budget with scope
  • Prepared tender documents and hired subcontractors
  • Oversaw all aspects of the building process.

Kassu G/Tsadik Contractor

Material Engineer
09.1999 - 07.2001

Job overview

  • Performed planning, scheduling, and budgeting for the particular contracts
  • Performed filed and lab material testing, evaluated the result, and prepared a report
  • Supervised the development and material production sequence
  • Presented the progress reports and recommendations for the correction test evaluation
  • Prepared a detailed shop drawing for production
  • Performed extensive construction sites and quarry supervision
  • Implemented a safe working environment by using the safety protocols and procedure.

Tibebu Solomon General Contractor

Office Engineer
09.1996 - 07.1999

Job overview

  • Prepared and distributed the meeting minutes, reports, and correspondence
  • Assessed the QC procedures to ensure the construction meets the project specification
  • Monitored the project's budget and tracked the project's progress
  • Prepared purchase orders, coordinated with suppliers, and ensured timely delivery of materials
  • Provided technical support for the project engineers and field engineers
  • Prepared documentation for the regulatory agencies
  • Conducted site visit to monitor the progress and to gather information
  • Utilized project management software to track the project schedule and generate a report.

A.A. City Government W.U.D

Office Engineer
08.1995 - 06.1996

Job overview

  • Collected field data, developed a plan, and compiled it as-built plan for document changes
  • Prepared site maps and located the elevation benchmarks
  • Prepared existing building cost estimation and building material evaluation analysis
  • Attended extensive training in construction manuals and surveying process.

Education

School of Engineering, Morgan State University

Doctor of Engineering from Engineering
Aug.2020 - Current (4 years & 6 months)

School of Engineering, Morgan State University

Master of Engineering from Civil Engineering
05.2022

School of Engineering, Morgan State University

Master of Science from Transportation and Urban Infrastructure Studies
05.2020

School of Architecture And Planning, Morgan State University

Bachelor of Science from Construction Management
08.2018

Computer-Assisted Drafting And Design, Baltimore City Community College

Ass. Applied Science from Construction Supervision
12.2015

Faculty of Technology, Addis Ababa University

Advanced Diploma from Civil Engineering
07.1995

Skills

    • Construction Project Management
    • Project Planning & Scheduling
    • Budgeting & Cost Management
    • Quality Control & Assurance
      • Asset Management
      • GIS applications
      • Traffic Engineering
      • Data Analytics

Certification

  • OSHA-Construction Safety and Health 30hr-ID:5067-1410612
  • Pavement Marking - MARTCP-8245-MD
  • Temporary Traffic Control Manager-SHA
  • Soil & Aggregate Compaction - MARTCP -8245-MD
  • Concrete Field - ACI/MARTCP-8245-MD
  • HMA Field - MARTCP-8245-MD
  • Erosion & Sediment Control /Green Card/ RPC004012
  • Erosion and Sediment Control /Yellow Card/ 25756500

Technical Skills

Word, Excel, PowerPoint, Outlook, Access, Project, Arc GIS-Pro, MicroStation MSV8i, Inventor, Revit, 3ds Max, Synchro 10/SimTraffic/, Highway Capacity Software-2010, 3D Solid Modelling, SPSS

Projects Lists

PG6185470B: MD 4 @ Suitland Pkwy Interchange Construction

PGA115133: MD725 Sidewalks Construction

XY2465A77: Sidewalk Upgrades @ Various Locations

PG1065184: MD212 Urban Reconstruction Project

PG61851788: MD4 Interchange Construction

XX6705126: Noise Barrier Preservation & Remediation

XY5155177: Road Rehabilitation

XY4177177: Road Rehabilitation

MO1175177: Road Widening

MO1505188: Shared Use Path Improvement

PG8235177: Safety & Resurfacing on I95/I495





Timeline

School of Engineering, Morgan State University

Doctor of Engineering from Engineering
Aug.2020 - Current (4 years & 6 months)

CM - Transportation Engineer

Johnson, Mirmiran, & Thompson, Inc. /JMT, Inc.
06.2017 - Current

CM- Transportation Engineer Technician

INDAM Engineers Inc.
03.2014 - 06.2017

Principal Project Manager

FD Building Contractor
10.2001 - 09.2010

Material Engineer

Kassu G/Tsadik Contractor
09.1999 - 07.2001

Office Engineer

Tibebu Solomon General Contractor
09.1996 - 07.1999

Office Engineer

A.A. City Government W.U.D
08.1995 - 06.1996
  • OSHA-Construction Safety and Health 30hr-ID:5067-1410612
  • Pavement Marking - MARTCP-8245-MD
  • Temporary Traffic Control Manager-SHA
  • Soil & Aggregate Compaction - MARTCP -8245-MD
  • Concrete Field - ACI/MARTCP-8245-MD
  • HMA Field - MARTCP-8245-MD
  • Erosion & Sediment Control /Green Card/ RPC004012
  • Erosion and Sediment Control /Yellow Card/ 25756500

School of Engineering, Morgan State University

Master of Engineering from Civil Engineering

School of Engineering, Morgan State University

Master of Science from Transportation and Urban Infrastructure Studies

School of Architecture And Planning, Morgan State University

Bachelor of Science from Construction Management

Computer-Assisted Drafting And Design, Baltimore City Community College

Ass. Applied Science from Construction Supervision

Faculty of Technology, Addis Ababa University

Advanced Diploma from Civil Engineering
FELEKE BELAY