Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

Fernando Aguillon

Fresno,TX

Summary

With a proven track record at Simon Hegele Health Solutions, I excel in medical equipment installation and project engineering, blending mechanical aptitude with exceptional teamwork. My expertise in diagnostic testing and a knack for problem-solving have driven successful, high-quality projects, enhancing operational efficiency and client satisfaction.

Overview

20
20
years of professional experience
1
1
Certification

Work History

Medical Equipment Installer

Simon Hegele Health Solutions
02.2021 - Current
  • Optimized inventory control by accurately tracking supplies, tools, and spare parts needed for successful installations.
  • Collaborated with healthcare professionals to determine the most effective placement of medical devices in accordance with facility requirements.
  • Contributed to a positive work culture by collaborating effectively with fellow team members, sharing knowledge, and providing assistance when needed.
  • Demonstrated excellent problem-solving skills while troubleshooting complex technical issues that arose during installations or routine maintenance procedures.
  • Maintained a clean and organized work environment, minimizing disruptions to healthcare professionals and patients alike.
  • Experienced in installations for several vendors
  • Oversee the rigg in of MRI magnets
  • Set level and align new magnet installations

Project Engineer

The Trident Organization, LLC
07.2018 - 02.2021
  • Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications.
  • Maintained records for each project and engineering discipline.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Projects consisted of Demolition of old existing as well as new construction for residential and commercial pools and water parks
  • Facility maintenance also provided

Carpenter

Barrera Construction
03.2012 - 07.2018
  • Completed installations of building structures, trim, flooring, and cabinetry.
  • Demonstrated versatility in carpentry techniques, working proficiently with both hand tools and power tools to achieve desired results.
  • Specialized in specific carpentry tasks such as framing, finish work, or restoration projects to provide clients with tailored services and high-quality results.
  • Demonstrated close attention to detail to verify quality and accuracy of work.
  • Projects consisted of New Apartments and Student housings across the states
  • Residential renovations
  • Traveling and relocation was required
  • Ensured compliance with building codes by thoroughly reviewing design plans before commencing construction tasks.
  • Managed subcontractors effectively to ensure timely delivery of materials and services without compromising quality.
  • Enhanced client satisfaction with high-quality craftsmanship in custom carpentry work.
  • Maintained organized records of blueprints, plans, and specifications for easy access during the construction process.

Inventory Coordinator

National Oilwell Varco Inc
01.2010 - 05.2012
  • Resolved discrepancies between physical counts and electronic records through thorough investigation and reconciliation efforts.
  • Reduced stock discrepancies by diligently investigating variances and resolving issues promptly.
  • Improved inventory accuracy by conducting regular audits and implementing an efficient tracking system.
  • Performed full inventory counts every [Number] days.

Carpenter

Lopez Construction
08.2004 - 01.2010
  • Contributed to successful completion of residential and commercial projects by skillfully installing cabinetry, doors, windows, and flooring materials.
  • Repaired existing structures such as staircases, decks, or door frames with precision to extend their lifespan without compromising structural integrity or aesthetics.
  • Measured materials to determine sizes and quantity required for construction project.
  • Cut, shaped and installed siding, roofing and framing to protect interior of properties from harsh weather conditions.
  • Collaborated with other skilled tradespeople to ensure seamless integration of carpentry work within larger construction projects.

Education

High School Diploma -

Hightower High School
Missouri City, TX
06-2004

Skills

  • Electrical wiring
  • Diagnostic testing
  • Equipment calibration
  • Mechanical aptitude
  • Medical equipment installation
  • Procedure requirements
  • Quality control procedures
  • Equipment Repair
  • Teamwork and collaboration
  • Problem-solving
  • Customer service
  • Attention to detail
  • Organizational skills

Certification

  • OSHA Certified

Languages

Spanish
Professional Working

Timeline

Medical Equipment Installer

Simon Hegele Health Solutions
02.2021 - Current

Project Engineer

The Trident Organization, LLC
07.2018 - 02.2021

Carpenter

Barrera Construction
03.2012 - 07.2018

Inventory Coordinator

National Oilwell Varco Inc
01.2010 - 05.2012

Carpenter

Lopez Construction
08.2004 - 01.2010

High School Diploma -

Hightower High School
Fernando Aguillon